Power supply safety work ticket and operation ticket management method
Chapter 1 Work Tickets
Section 1 General section of substation and line work ticket
Article 1: When performing normal maintenance work on the power supply equipment, all need to do security measures
Work tickets should be used.
Article 2: Common work tickets are divided into: first and second work tickets for substation, power line number
First, a kind of work ticket. The format used is as follows in the "Safety Regulations":
1. Fill in the work ticket:
The work of the first type of work ticket is:
Working on high voltage equipment requires all or part of the power outage;
Work on circuits such as secondary wiring and lighting in a high-voltage room requires power-off or safety measures for high-voltage equipment.
The job of filling in the second work ticket is:
Live work and work on the outer casing of a live device;
Control panel and low voltage switchboard, distribution box, power supply line work;
Work on the secondary winding circuit, no need to power off the high voltage equipment;
Work on a rotating generator, an excitation circuit of a synchronous camera, or a rotor circuit of a high voltage motor.
Non-duty duty personnel use phasing with insulation rods and voltage transformers or use a clamp-type ammeter to measure the current in the high voltage circuit.
2. Use of power line work tickets:
The job of filling in the first type of work ticket is:
Work on the stop line;
Work on the distribution transformer rack in all or part of the power outage or in the distribution transformer room.
The so-called total power outage means that all power lines supplied to the transformer gantry or distribution transformer room have been disconnected.
The job of filling in the second work ticket is:
Live working
Work on an electric line tower;
Work on the distribution transformer rig in the row or in the distribution transformer room.
Article 3: The work ticket is filled in by the issuer. Sometimes in order to reduce the workload of the work ticket issuer, the work person in charge can also fill in the work ticket of the class.
Article 4: Work tickets should be filled in duplicate with a pen or a ball pen. They should be filled in correctly and must not be modified arbitrarily. If there are individual words that need to be modified, they should be clearly written. A work ticket modification must not exceed 3 words.
Article 5: Fill in the work ticket should use language that can accurately express the meaning and conforms to the national language standard.
Article 6: The personnel listed on the work ticket shall be examined and approved according to the responsibility, and the signature shall be complete and the writing shall be neat.
Article 7: The person who issued the work ticket shall be the person approved by the company and announced. The person who issued the work ticket shall not concurrently serve as the person in charge of the work.
Article 8: Issuance of work tickets.
1. The work ticket shall be issued by the issuer, and the work ticket filled out by the person in charge of the work shall also be issued by the issuer.
2. Under normal circumstances, the work place on a work ticket is limited to one electrical connection part. If the construction equipment belongs to the same voltage, is located on the same floor, and stops power transmission at the same time, and does not touch the live conductor, it allows several electrical connection parts to share one work ticket.
3. In the following cases, the person designated by the company to issue the work ticket shall issue a work ticket, and the duty officer shall perform the work permit formalities. The job ticket issuer is only responsible for the necessity of the work, the safety of the work and the correctness of the safety measures listed on the work ticket. Before starting work, the guardian will provide safety education to the staff and explain the precautions.
The external unit with legal person qualification shall repair, anti-corrosion or install the substation contract equipment.
Infrastructure construction requires the equipment in operation to stop running.
Install the unit to handle equipment defects that are newly commissioned.
4. A substation or a line can be sent to a work ticket for all power outages, but the work content should be detailed. When several teams work at the same time, the work ticket can be sent to a general work person in charge, and only the person in charge of each class is filled in the work class member column.
Article 9: One of the two work tickets must be kept at the workplace regularly, and the other person in charge of the work will receive the contract and the other will be handed over by the duty officer. The duty officer should record the work ticket number, work assignment, license start time, and completion time in the operation logbook.
Article 10: Job Leader
1. Personnel approved by this Council for publication.
2. When an external unit with legal person qualifications goes to the substation for contracting civil works construction, equipment maintenance, installation, anti-corrosion or commissioning, the person in charge of the work shall be designated by the foreign unit, and the list shall be submitted to the company safety supervision for safety qualification beforehand. The supervisor forwarded the list to the substation.
3. Changes in the person in charge of the work:
During the work period, if the person in charge of the work temporarily leaves the scene for 2 hours, the person responsible for the work shall be updated by the person who issued the work ticket. The two person in charge of the work shall make the necessary handover. The change of the person in charge of the work can only be processed once. The change of the person in charge of the work ticket of the second type of work ticket is recorded in the "Remarks" column.
Article 11:
1. When working in a team, fill in the names of all the people who participated in the work. When working in multiple teams, you can only fill in the name of the person in charge of the team.
2. Total: Fill in the total number of people participating in the work, including the person in charge of the general work and the person in charge of the team.
Article 12: Extension of work tickets:
During the work, it is expected that the maintenance is difficult to complete during the planning time. The person in charge of the work should apply for the extension procedure to the person in charge of the shift more than 2 hours before the expiration of the planning time.
The extension of the second work ticket is entered in the “Remarks” column.
The extension procedure can only be processed once.
Article 13: The end of work:
After the work is completed, the person in charge of the work will check the condition of the equipment and the on-site hygiene with the person in charge of the duty. Then both parties sign the work ticket and the work is terminated. And in the "Remarks" column, the "Ended" chapter is covered.
Article 14: Before the completion of the maintenance work, if one of the following circumstances occurs, the work ticket shall be reissued and the work permit formalities shall be re-executed. The original work ticket cover is "obsolete".
1. Some maintenance equipment will be added to the operation and safety measures need to be changed.
2. The duty officer found that the maintenance personnel seriously violated the "safety regulations" behavior and persuaded to recover the work.
3. The extension of the maintenance period cannot be completed once and it needs to continue working.
4. The work ticket is damaged, the content is incomplete or the writing is ambiguous.
Article 15: When a work permit examines a work ticket, it finds that one of the following circumstances may return the work ticket and request a reissue.
1. Project work time has expired
2. Insufficient security measures or incorrect filling.
3. The work ticket issuer or work person in charge does not meet the requirements.
4. The work content and work location are not clear.
Article 16: Examination of work tickets
1. The operation and maintenance department shall collect and review the work tickets that have been terminated last month before the 5th of each month, and report the pass rate to the safety supervision.
2. One of the following circumstances is an unqualified work ticket:
Work tickets are not numbered.
The work ticket is filled in with missing items.
Not signed as required.
jobs
The content is not specific or the place of work is not clear.
The work content bar device does not use a double number.
The safety measures are not specified.
The grounding wire is not numbered and the installation location is not clear.
The work ticket issuer, the work leader, and the work permitr concurrently serve each other.
The procedures for changing the person in charge of the work were not handled as required.
The work extension procedure was not carried out as required.
The second work ticket should be used for the work that should use the first work ticket.
There is a cover and the signboard does not indicate the exact location or location.
The work ticket was damaged, the incompleteness was incomplete, and the pollution was not clear.
The chapter "Ended" or "Closed" is not covered.
3. The pass rate of the work ticket is calculated on a monthly basis, and the calculation formula is as follows:
Qualifying ticket
Pass rate = —————————————×100%
Unqualified ticket + qualified ticket + other ticket
Note: Other tickets refer to work that should be opened as required but not actually invoiced.
Article 17: Custody of work tickets: Work tickets that have been terminated shall be kept by all units for more than three months.
Article 18: Accident repair can be done without a work ticket, but it must be recorded in the operation record book. Before starting work, safety measures such as power failure, power inspection, installation of grounding wire, hanging signage and installation of fences shall be made, and special personnel shall be appointed for supervision.
The following work can be listed as accident repair:
1. Accidents in power supply equipment may endanger personal safety, cause fire or serious damage to equipment, and need to be dealt with immediately.
2. Save people and put out fires.
If the time for repairing a substation accident is not expected to exceed 4 hours and cannot be repaired within 4 hours, the work ticket shall be handled according to the normal maintenance. Line accident repair is not limited.
Section 2 Substation work ticket
Article 19: The work of filling out the first type of work ticket is:
1. All or part of the power outages are required for work on high voltage equipment;
2. For work on the secondary wiring and lighting circuits in the high-voltage room, it is necessary to power off the high-voltage equipment or to make safety measures. The job of filling in the second work ticket is:
Live work and work on the outer casing of a live device;
Control panel and low voltage switchboard, distribution box, power line trunk work;
Work on the secondary winding circuit, no need to power off the high voltage equipment;
Work on a rotating generator, an excitation circuit of a synchronous camera, or a rotor circuit of a high voltage motor;
Non-operating duty personnel use phasing with insulation rods and voltage transformers or measure the power supply of the high voltage circuit with a clamp ammeter.
Article 20 Rules for completing the work ticket:
1. Number: Each unit is numbered separately and there must be no duplicate number within one year.
2. Responsible person:
Personnel approved and announced by the company.
The external unit with legal person qualification shall designate the person in charge of the work for the construction, equipment maintenance, installation, anti-corrosion or commissioning of the substation contracting civil works, and submit the list to the company safety supervision and examination safety qualification in advance, and the safety supervision will be passed after the qualification is passed. Forward the list to the substation.
Changes in the person in charge of work:
During the work period, if the person in charge of work temporarily leaves the site for more than 2 hours, the person responsible for the work of the work ticket shall be updated, and the person in charge of the work shall make the necessary handover.
The change of the person in charge of the work can only be processed once.
The change of the person in charge of the work ticket of the second type of work ticket is recorded in the "Remarks" column.
3. Team: If a team works, add the name of the supervisor in front of it. For the work of several teams, write the team in which the head of the general work is located.
4. Work class personnel:
When working in a team, fill in the names of all the people who participated in the work. For the work of multiple teams, only the name of the person in charge of the team can be filled in.
Total: Fill in the total number of people participating in the work, including the head of the general work and the person in charge of the team.
5. Work content and work location:
Fill in the substation name, voltage level, device name and number, work task, workplace or interval.
6. Project working time: for the power outage maintenance time approved by the dispatcher, excluding the power-off operation time.
7. Safety measures: fill in the work ticket issuer and work permitr separately:
The circuit breaker and disconnector should be opened: fill in the device name and number.
The grounding wire should be installed: the exact location of the grounding wire or the grounded knife gate should be written. The licensor must add the number.
There should be a fence and a sign should be placed: the exact location of the fence, the exact location of the sign. The 10kv isolating switch needs to be placed in this column with an insulating shield.
Additional safety measures: Safety measures or safety precautions other than items.
The work licensor should fill in the security measures in the corresponding column, and should not be simplified or written as simplified or written as “same left” and “made”.
8. Time of receipt of work ticket: The time for the work ticket to be handed over to the substation watchman before the planned work time.
9. License start working time: After the work permitter completes the safety measures and permit procedures at the construction site, the signature agrees to the time of commencement of work.
10. Change of the person in charge of the work: During the work period, if the person in charge of the work temporarily leaves the site for more than 2 hours, the person responsible for the work of the work ticket shall be updated, and the person in charge of the work shall make the necessary handover.
The change of the person in charge of the work can only be processed once.
The change of the person in charge of the work ticket of the second type of work ticket is recorded in the "Remarks" column.
11. Work ticket extension:
During the work, it is expected that the maintenance work will be difficult to complete within the planning work. The person in charge of the work should apply for the extension procedure to the person in charge of the shift more than 2 hours before the expiration of the project time.
The extension of the second work ticket is entered in the “Remarks” column.
The extension procedure can only be processed once.
12. The end of the work ticket:
After the work is completed, the person in charge of the work will check the condition of the equipment and the on-site hygiene with the person in charge of the duty. Then both parties sign the work ticket and the work is terminated. And in the "Remarks" column, the "Ended" chapter is covered.
13. Remarks column: Fill in the precautions or other matters.
The third section of the power line work ticket
Article 21 The work of filling in the first type of work ticket is:
Work on the stop line;
Work on the distribution transformer rack in all or part of the power outage or in the distribution transformer room. The term "all power outages" means that all power lines supplied to the transformer gantry or transformer room are completely disconnected.
The job of filling in the second work ticket is:
Live work
Work on a live line tower;
Work on a running distribution transformer gantry or distribution transformer room.
Article 22 Filling in the details of the work ticket:
1. Number: Each unit is numbered separately and may not be numbered within one year.
2. Department and name: Fill in the name of the power supply station and the work team. When multiple work teams share a work ticket, fill in the name of the team name of the person in charge of the total work.
3. Job leader:
Personnel approved and announced by the company.
Negative work
Responsible changes:
During the work period, if the person in charge of work temporarily leaves the site for more than 2 hours, the person responsible for the work of the work ticket shall be updated, and the person in charge of the work shall make the necessary handover.
The change of the person in charge of the work can only be processed once.
The change of the person in charge of the work ticket of the second type of work ticket is recorded in the "Remarks" column.
4. Work class personnel:
When working in a team, fill in the names of all the people who participated in the work. When working in multiple teams, you can only fill in the name of the person in charge of the team.
Total: Fill in the total number of people participating in the work, including the head of the general work and the person in charge of the team.
5. Name of power outage line:
Fill in the line voltage level, line name, and number.
6, the working area: fill in the line name, branch line name, start and stop number.
7. Work tasks: fill in specific work tasks within a certain range.
8. Security measures to be taken:
Development of power stations, substation line breakers and disconnectors.
Pull off the circuit breakers, disconnectors and fusible fuses on each side of the line that requires the work team to operate.
Pull off circuit breakers and disconnectors that cross the line, parallel and parallel erected lines that endanger the power outage of the line and cannot take safety measures.
Pull off the circuit breaker and disconnector that are likely to return to the low voltage power supply.
It is necessary to pull out the circuit breaker and disconnector in the power station or substation, and only need to fill in the name and number of the circuit breaker and the isolating switch. If the circuit breaker and disconnector are pulled by the line staff, it is necessary to add “hanging the signboard or locking on the opened circuit breaker and the isolating switch operating handle”. This field is also required to fill the grounding knife of the power station or substation or the grounding line on the line.
9. Reserved live lines or live equipment:
Fill in the name of the live line or adjacent live line that is erected on the same pole, the name of the pole and the name of the live line at the intersection with the live line, the start and stop number of the parallel section with the live line, and the name of the live line.
Ground wire to be hung:
Refers to the ground line that the work team should hang itself, excluding the ground wire or grounding knife gate of the substation. The location of the ground wire to be hung on the line should be clear. For the line erected on the same pole, if the grounding line is required on different lines on the same tower, the line name and tower number should be respectively indicated.
Project Hours: Fill in the scheduled power outage time.
The order to start the work:
The order method for starting the first work ticket of the line is divided into face-to-face notification, telephone communication and sending people.
Report on the end of work: The way to end the report is divided into face-to-face and telephone.
Remarks column: Fill in the supplementary security measures and other content.
Chapter II Operation Ticket
Substation, line operation ticket
Article 23 According to the orders of the shift dispatcher or the person in charge of duty, if the operation status of the equipment needs to be changed, it is necessary to use the operation ticket.
The equipment usage status is divided into the following types:
1. Operation.
2. Hot spare: Only the switch is in the off position.
3, cold standby: circuit breaker, disconnector, secondary circuit insurance in the disconnected position.
4. Inspection: On the basis of cold standby, the equipment is grounded and other safety measures are arranged.
Article 24 The main contents of the operation ticket must be filled in:
1. Operation task, start and end time.
2. Check the power, current and voltage of the relevant circuit.
3. Pull open and close the circuit breaker and disconnector.
4. Check the actual position of the circuit breaker and disconnector.
5, the secondary circuit switching, the protection circuit pressure plate cast, retreat or change the fixed value.
6. Input or exit of control loop, relay protection, automatic device and measuring instrument.
7. The specific location of the power failure equipment inspection.
8. Install and remove the position and number of the grounding wire.
9. The control of the switch is controlled and retracted at the same time as the gate.
10. Hanging signboards and other locations, installed fences and their locations.
11. Install an insulation shield.
Article 25 The filling of the operation ticket.
1. Filled in by the operator, the guardian's first trial, the duty officer or the operation licensor sign and approve.
2, the operation of the ticket set with a pen or ball pen to fill out clearly, can not be arbitrarily altered. Non-keyword edits must not exceed 3 words per title, and keywords cannot be modified.
3. Fill in the operation ticket and use the standard operation term. Dialect should not be used.
4. The number of the operation ticket cannot be duplicated within one year.
5. A serial number in the operation ticket corresponds to the operation content of a device, and cannot be combined. Check the position status of the device as one. The phase-separated equipment is used as one item.
6. Each operation ticket can only fill one operation task. The device name and number should be filled in both the operating system column and the operation item column.
7. The person listed on the operation ticket has a complete signature and is neatly written.
8. The order of the operation tickets is correctly filled out:
Line power failure operation sequence: open the circuit breaker - pull off the line side isolation switch - pull open the bus side isolation switch. The power transmission sequence is reversed.
Double-winding transformer power-off operation sequence: Pulling off the load-side circuit breaker—pulling the power-side circuit breaker—pulling the load-side isolation switch—opening the power-side isolation switch. The power transmission sequence is reversed.
Three-volume transformer power failure operation sequence: Pull open the low-voltage side circuit breaker - pull open the medium-voltage side circuit breaker - pull open the high-voltage side circuit breaker - pull open the low-voltage side isolation switch - pull open the medium-voltage side isolation switch - pull Open the high side isolation switch. The power transmission sequence is reversed.
9. If the operation ticket has not been used up, the "Following Blank" chapter will be covered from the first line.
Article 26 Execution of the operation ticket
1. The operation ticket for the switch must be carried out by two people, one of whom is familiar with the equipment and the other person.
2. An operator can only operate with one operation ticket at a time, and cannot hold several operation tickets at the same time.
3. Before the operation, the verification simulation preview should be performed on the simulation board with reference to the operation ticket. When you go to the site for formal operation, you should first check the device name, number and location, the guardian holds the ticket and the key to prevent the wrong device, sing the ticket loudly, the operator uses the finger to operate the part, and can be operated after loudly resuming.
4. The operation must be carried out according to the order of the items listed in the operation ticket. It is forbidden to reverse items, add items, miss items and do work unrelated to the operation. Every time you finish the operation, you will make a "√", and you are not allowed to play "√" once.
5. The operation time of important items should be recorded in the operation ticket.
Next pagerecommended article
- Traffic police brigade service assessment quantification and reward and punishment temporary
- Party collection system
- Cafe rules and regulations
- Canteen management system
- Sales Management System Model (A)
- Various management systems of the company
- Power distribution room safety management system
- Branch fund management system
- Interim Measures for the Management of Internal Talent Recruitment Markets (
- Company overtime management system
- Institutional cadre learning system
- Management method for the use of corporate laptops
popular articles
- Office director job duties
- The 2019 one-course work system in 2019
- Taizai’s famous sayings
- Tao Xingzhi's famous sayings
- The latest high school inspirational maxim
- Warehouse management system
- Administrative measures for non-employed personnel in public institutions
- Teacher's famous saying
- Deaf people jingle 2019
- College entrance examination inspirational quotes
- Kindergarten management system
- Company restaurant management regulations
- Hotel staff management system
- File confidentiality system
- Describe the fast time sentence 2019
- Thanks to the friend's words 2019
- Villager autonomy charter
- Sad love sentence 2019
- Injured sentence
- Du Yuexi's famous sayings
- Korean swear words
- Strong words
- I want to say something to the teacher.
- School fire safety management system
- a good saying that loves labor
- Classical life motto
- 2014 is very touching words
- English famous words
- Qq space mood phrase
- Bing Xin’s famous words