0, the order

1. Company Profile

2. Foreword

3. Scope of application

4, reference file

5. Quality policy and quality objectives

5.1 Quality Policy

5.2 Quality objectives

6. Organizational system

7. Quality and safety control system

8. Responsibility and communication

9, job qualifications

10. Quality Function Allocation Table

11, the work program

12, product planning requirements

12.1 Construction organization design provisions

12.2 Survey outline preparation regulations

13, quality record preparation

13.1 Geotechnical Construction Project Management Book

13.2 Management Project of Geotechnical Investigation Project

Attachment: Production Safety Management Regulations

Enactment order

In order to ensure the good operation of the quality management system in the company, the company completed the “Workbook” of the company in accordance with the “Quality Manual” of the institute. The "Workbook" is suitable for the internal management of the company in its production and operation activities, including: the company's quality objectives, organizational structure, job responsibilities, job qualifications and related management systems or specifications. The "Workbook" has been reviewed by the person and will be formally implemented after being approved by the supervisor of the hospital.

Reviewer: Date:

Head of the hospital: Date:

Geotechnical Engineering Company Workbook

1. Company Profile

The company has an organization, a business office and six project departments. There are 34 registered employees, including 20 professional and technical personnel, 10 technical workers, 1 middle and senior engineer, 6 engineers and 13 junior titles. Main business scope: design and construction of various building soft foundation reinforcement projects; design and construction of deep foundation pit support engineering; geotechnical engineering of industrial and civil buildings, high-rise buildings, metallurgy, output lines, bridge engineering, roads, etc. Survey and survey; design and construction of special projects such as building deviation correction, tunnel reinforcement, settlement remediation and reservoir and power station dam foundation seepage prevention.

Influential projects: 1. Bazhou Tractor Factory, 焉耆 Government Office Building, Bohu Government Office Building Reinforced Concrete Pile; 2. Fangcao Lake Sugar Factory Sand Pile

3. The sand pile geotextile of the Second Cultural Center of Nongyi Division; 4, the technical renovation project of Yutian County Silk Factory; 5, the technical transformation project of Xinjiang Cigarette Factory is strong; 6. The Wuyun Division of Urumqi Pier; 7, the main plant of Xinjiang Turpan Esquel Textile Co., Ltd. is flooded with large area; 8. The sixth detachment of the Armed Police Xinjiang Corps is strong; 9. The Ili Prefecture Post and Telecommunications Bureau is reinforced; 10, the sand pile of the Jingjiang section of the Beijiang Railway; 11. The Xinjiang Military Region Early Childhood Center is a strong gravel pier; 12, the Shijiazhuang Zhijiu Airport geotechnical engineering survey; 13, Guanghui Zhongtian Square deep foundation pit support; 14, Xintian International Tianyi Building deep foundation pit support project Wait. Among them, the Beijiang Railway Jinghe Railway Station Sand Pile Project won the third prize of the Autonomous Region Excellent Project in 1993. The sixth detachment of the Armed Police Xinjiang Corps was forced to win the third prize of scientific and technological progress in the autonomous region.