Secretarial knowledge > Conference speech

* Development Zone 2019 Economic Development Highlights



Hanting Marine Chemical Development Zone

The main points of economic work in 2005

In 2005, it was an important year for us to seize the important strategic opportunity period, conform to the development trend of Weibei City's “Three Norths” and accelerate the comprehensive construction of Hanting. The guiding ideology of the economic work of Haihua District is: guided by Deng Xiaoping Theory and the important thinking of the "Three Represents", and guided the overall development with the scientific development concept, and comprehensively implemented the Party's 16th and 16th Central Committee and the 4th Middle School. The spirit of the Plenary Session and the Central, Provincial and Urban Economic Work Conferences, taking the opportunity of building the “Three North” heavy chemical industry base in the city, emancipating the mind, seizing opportunities, and starting a business, aiming at building eco-industrial towns, highlighting development priorities and adhering to the economy Both development and environmental protection will promote industrialization and urbanization as a whole, and strive to build a central area of ​​the “Three North” heavy chemical industry base in the city, and fully promote the development of the Haihua District, making it an industrial new district in the northern part of Hanting. According to the requirements of the district's accelerated development work conference, the goal of economic development in 2005 is: GDP growth of 40%; total fiscal revenue increased by 30%, of which local fiscal revenue increased by 35%; the added value of enterprises above designated size increased by 40%; Fixed assets investment increased by 100% during the same period; investment promotion increased by 100%, of which actual use of overseas funds increased by 150%; urban residents' per capita disposable income increased by 500 yuan.

First, carefully plan and define the direction of development

Following the guiding ideology of highlighting the development of salt and bromine industry, vigorously developing circular economy, and striving to build a central area of ​​“Three North” heavy chemical industry base, the framework of “one port, two belts and six districts” and “six verticals, four horizontals and one ring” was determined. planning. On this basis, further improve the five detailed planning: First, industrial development planning. Focus on the development of heavy chemical industries such as brine chemical, coal chemical, petrochemical, industrial processing, as well as logistics, coastal tourism and other industries. The second is the comprehensive utilization planning of brine water resources. Effectively strengthen the management of brine resources and achieve orderly development and comprehensive utilization of limited resources. The third is the infrastructure construction planning, including road network, power grid, heat, water supply and drainage, moisture-proof dam, greening and other six detailed planning. The fourth is the planning of business services. On the one hand, with the focus on the “two belts”, we will develop the economy along the roads of the Bohai Sea Expressway, the Industrial Processing Zone, the Yangzi Township, and the Cuijiayangzi Village. On the other hand, the development and construction of the Cuijiayangzi Village East, with Xinhai Road as the axis of the logistics park. So that Beihai Road and Xinhai Road will become two economic and trade corridors in Haihua District. The fifth is town planning. Centering on the central town of Yangzi, expanding the north to the north, increasing the intensity of construction and increasing the capacity of the city. By 2020, it will form a new northern area covering an area of ​​10 square kilometers.

Second, pay close attention to attracting investment and enhance the development of stamina

Taking investment promotion as the overall starting point for the construction and development of the development zone, taking the expansion of Weifang Port and the extension of Beihai Road as an opportunity to give full play to the advantages of transportation, location, resources and land, to introduce large projects with large investment, high intensity and strong driving ability. Focusing on the implementation of the investment promotion responsibility system at different levels, and accelerating the new breakthroughs in project entry. In 2005, we ensured that the actual funds in place reached 300 million yuan, and strived to complete 400 million yuan. The contract used 1 billion yuan of funds outside the city, including 3 projects with over 100 million yuan and 1 foreign investment project with investment of more than 5 million US dollars. Mainly do a good job in four aspects. First, based on recruiting and attracting strength, accelerate the construction of the "three parks." In 2005, we continued to use the construction of the park as a breakthrough for investment attraction. Before the end of May, we completed the land adjustment and road network construction in the northeast corner of the existing industrial processing zone, east of Yangshuo Road and north of Xinhai Road. Ample space. With market-based means, diversified investment and financing, planning and construction of some high-standard workshops, providing centralized development space for small and medium-sized projects with an investment of less than 10 million yuan. Focus on accelerating the development and construction of Hailong Industrial Park and Haiwang Science and Technology Park, and strive to start construction within the year, and some of them will be put into production. Hailong Industrial Park plans to invest 1.5-200 million yuan, new non-woven processing projects and composite non-woven projects; Haiwang Science and Technology Park is located in the west of the industrial processing zone, focusing on the development of chlor-alkali and other chemical projects. Intensify efforts and actively negotiate with the municipal power company to promote the Wuzhou Electric Power Park to settle in Haihua District and start construction as soon as possible. The second is to pay attention to the introduction of export-oriented projects. Give play to the advantages of land and resources, highlight overseas capital and project introduction, and strive to improve economic outwardness. Carefully prepared for the district government to arrange investment activities led by Haihua District. Grasping the strategic opportunity of the “Three North” development of the city and the construction of the peninsula manufacturing base in the province, focusing on the industry and capital transfer of the developed countries, and increasing the docking with foreign companies, we will strive to introduce 3-5 foreign investment projects during the year. The third is to accelerate the progress of existing projects. For projects under construction such as Haixinwei Chemical, Walter Chemical, Shanghai Pudong Dyeing, etc., implement the project responsibility system, speed up the construction progress, and strive to achieve production efficiency in May; for the production projects of Shandong Zhongbang, Kangfuite, etc. Encourage and guide the increase in investment in technological transformation and accelerate the construction of the second phase of the project. Five projects that have signed contracts or reached investment intentions, such as Libo Daily Chemical, Cogeneration Project, Hailong Composite Non-woven Fabric, 120,000 tons of chlor-alkali, dye intermediates, etc., further work to ensure construction starts before May this year. . The fourth is to implement a leading strategy and cultivate key enterprises. Encourage a group of powerful enterprises such as Rehabilitation Special, Haiwang Chemical, and First Salt Field, actively introduce advanced equipment and technology to transform low-grade products, develop high-tech and high-value-added products, and promote enterprise optimization and upgrading. In the construction land, investment policies and other aspects of these enterprises to lean and support, accelerate the formation of large taxpayer groups, and expand the total amount of economic tax. At the same time, these enterprises will be actively involved in attracting investment, introducing related industries and upstream and downstream supporting projects, and forming a circular industrial chain in Haihua District as soon as possible. The fifth is to promote the development of cooperation through policy pull. Correctly handle the relationship between “regional” and “community”, improve the enthusiasm of the whole society to participate in the development of Haihua through reasonable distribution of benefits and good full-service, and attract investment from local departments and towns and individuals to participate in the investment of Haihua District. jobs. During the year, 10 projects were introduced from the direct departments and townships of the resettlement areas.

Third, supporting infrastructure, building a development platform

The first is to speed up infrastructure construction with a focus on road networks. The infrastructure construction of Haihua District mainly includes six aspects: road, water, dam, heat, green and electricity. In terms of road construction, in accordance with the road construction plan of “six vertical, four horizontal and one ring”, in 2005, we will focus on three road constructions: Beihai Road, actively cooperate with the work, and complete the clearing and earthwork along the territory on schedule. According to the city and district planning, widen and renovate from the north of Bailang River Bridge, each side will reserve 50 meters of green belt; the grass field road, designed oil surface width of 10 meters, according to the construction standard of secondary road, completed before the rainy season; The road extends westward to Cuijiahe according to the standard of the built-up section, and completes the pavement, greening and lighting work of the sidewalk in the town section. In the construction of electric power facilities, the power supply company of the coordination area completed the voltage upgrade project of the central station in accordance with the “Cold North” power plan, actively strived for the implementation of the 220KV substation project in the north, and accelerated the construction of the cogeneration project to provide sufficient power protection for the economic development in the north. . Construction of water supply and drainage system, actively cooperate with the Plain Reservoir Management Office and the Municipal and District Water Conservancy Bureau to speed up the construction of the Second Plain Reservoir; invest 13 million yuan to complete the drainage system construction in the industrial processing zone. Second, focusing on the construction of cultural and educational facilities, accelerate the expansion of commercial and residential areas. A comprehensive school is planned to be built on the west side of the government office of Yangzi Town, and the Central School and the National Primary School will be relocated. At the same time, through investment promotion, we will do a good job in real estate development for the location of the former Yangzi Middle School and the National Primary School. In 2005, on the one hand, focusing on demolition and ugly, we will do a good job in the reconstruction work on both sides of the main roads in the township. On the other hand, focusing on the scale of the expansion city, we will focus on the living areas, industrial processing areas and Hebei Lingzi on the north side of the bustling road. Construction of commercial buildings along the village. At the same time, the establishment of urban management institutions, comprehensive management of the management system, and actively explore new ways of marketization and socialization of urban management. Third, in conjunction with relevant departments, actively strive for higher-level funds to accelerate the upgrading and upgrading of the northern dam.

For the funds needed for infrastructure construction, we intend to establish a diversified investment and financing mechanism as soon as possible while increasing the financial tilt, focusing on investment promotion and social financing, and do a good job in infrastructure construction. In 2005, the development zone strived to complete the infrastructure construction investment of 153.4 million yuan.

Fourth, strengthen the management of brine resources and maintain sustainable development

In accordance with the unified requirements of the district government, in the future, no new or expanded Yantian will be built, and new bromine production projects will no longer be established. Cooperate with relevant departments to stop production of bromine production enterprises in winter and flood season. Coordinate bromine production enterprises and relevant salt field property units, build brine transportation channels, expand the supporting salt field of bromine production enterprises, and ensure the joint production of salt and bromine. Take the lead from the Economic Development Bureau of Haihua District and organize the list of well-known brine chemical companies nationwide. Leading the leaders of the Haihua District, go out and contact each other, and strive to introduce 3-5 nationally renowned chemical companies during the year. At the same time, we will guide enterprises to actively carry out joint research, production, research and research with scientific research institutions and institutions of higher learning, especially salt and bromine chemical research and development institutions, increase capital investment, accelerate scientific and technological innovation, lengthen the industrial chain, and form comprehensive utilization and recycling of brine water resources as soon as possible. Industrial pattern.

V. Active preparations to truly meet the city level observation

From now on, everything is ready for the city-level observations in May. First, determine the observation routes and parking observation points in the country as soon as possible, and do a good job of road area management along the way. The second is to speed up the construction of the project, especially the surrounding projects of the parking spots, to ensure that a vigorous construction scene will be formed in May. The third is to do a good job in the greening and lighting of the main roads in the built-up areas of the industrial areas and towns, especially the greening, lighting and purification of Xinhai Road and Beihai Road intersection, Mingzhu Park, parking spots, Beihai Road and Fanhua Road. The above work was taken out at the end of January, and immediately after the Spring Festival, the organization was implemented to ensure that it was completed in mid-May.

6. Do a good job in the "three rural issues" and realize the development of the rural economy.

First, do a good job in the introduction and construction of leading enterprises. Focus on cultivating the Kanglong refrigerated processing plant, making it a leading processing enterprise for marine aquaculture and animal husbandry. We will strive to introduce an agricultural product processing enterprise in 2005 by means of attracting investment, and drive neighboring farmers to engage in related agriculture. The second is to do a good job of "income-generating" agricultural construction. Relying on the advantages of the plain reservoir, we will develop high-efficiency agriculture such as winter jujube cultivation, and at the same time grasp the construction of the breeding community to achieve the goal of optimizing the agricultural economic structure and increasing farmers' income.

7. Strengthen leadership, optimize services, and promote various tasks.

Give full play to the functional role of the management committee, and earnestly grasp the unified planning, unified management and unified coordination of the entire northern coastal development and construction. Further enrich the five leading groups to attract investment, industrial economy, project construction, soft environment construction, and safety production, clarify responsibilities, implement responsibilities, and earnestly do a good job. The first is to fully implement relevant policies. For large projects with high investment intensity and long pay taxes after production, appropriate awards will be given according to the established policies of the district committees and district governments. Relying on the administrative examination and approval hall, it further simplifies the procedures, improves the efficiency of work, and provides quality services to enterprises. The second is to fully implement the project package system. According to the division of responsibilities and the implementation of the leadership package responsibility system, the project will be provided with one-stop service from project approval, land acquisition construction, document handling, equipment introduction and installation to operation. The third is to protect the legitimate rights and interests of enterprises entering the zone. Strictly investigate and deal with all kinds of "three chaos" acts of infringing on business, crack down on all kinds of illegal production and business activities, and maintain normal production and operation order. The fourth is to build a “safety cold pavilion” as the general focus, effectively strengthen the comprehensive management of social security, and lay a stable social environment for the smooth development of other tasks. The fifth is to implement the work responsibilities of various departments in the development of sea, so that all departments can unify their thinking, improve their understanding, optimize their services, and support the development of the sea, truly forming a synergy between the upper and lower linkages, work docking, and coordinated development. Promote and promote the faster and better development of the coastal economy of the region.

January 2005

recommended article

popular articles