Processing contract
GF-90-0301
Processing contract
The author: _________________ contract number:
Contractor: _________________ Signing location:
Signing time: year, month and day
1. Product name or project, specification model, quantity, unit price, amount, delivery period
┌────┬──┬──┬──┬──────┬─────────────┐
│││││ Price or Remuneration │ Delivery Quantity and Delivery Period │
│定定物│Specification│Measurement│Quantity├──┬───┼──┬──┬──┬──┬─┤
│Name or Project│Model│Unit││Unit Price│Total Amount│Total ││││ │
├────┼──┼──┼──┼──┼───┼──┼──┼──┼──┼─┤
││││││ │││││ │
├────┼──┼──┼──┼──┼───┼──┼──┼──┼──┼─┤
││││││ │││││ │
├────┼──┼──┼──┼──┼───┼──┼──┼──┼──┼─┤
││││││ │││││ │
├────┴──┴──┴──┴──┴───┴──┴──┴──┴──┴─┤
│ Total RMB amount │
└──────────────────────────────────┘
Second, the fixed party material
┌───┬───┬───┬───┬───┬───┬───┬──┬───┐
│ Materials │ Specifications │ Measurement │ Quantity │ Quality │ Provide │ Consumption │ Price │ Total Amount │
│ Name │ Model │ Unit │ │ │ Date │ Quota ││ │
├───┼───┼───┼───┼───┼───┼───┼──┼───┤
│ │ │ │ │ │ │ ││ │
├───┼───┼───┼───┼───┼───┼───┼──┼───┤
│ │ │ │ │ │ │ ││ │
├───┼───┼───┼───┼───┼───┼───┼──┼───┤
│ │ │ │ │ │ │ ││ │
└───┴───┴───┴───┴───┴───┴───┴──┴───┘
Third, quality requirements, technical standards
────────────────────────────────────
───────────────────
4. Conditions and time limit for the contractor to be responsible for quality
────────────────────────────────────
───────────────────
V. Technical information, drawings and methods for confidentiality
────────────────────────────────────
───────────────────
6. Acceptance criteria, methods and deadlines
────────────────────────────────────
───────────────────
Seven, packaging requirements and cost burden
────────────────────────────────────
───────────────────
Eight, delivery methods and locations
────────────────────────────────────
───────────────────
9. The amount and time of delivery of the deposit advance payment
────────────────────────────────────
───────────────────
X. Settlement method and term
────────────────────────────────────
───────────────────
XI. Liability for breach of contract
────────────────────────────────────
───────────────────
12. If a guarantee is required, a separate contract guarantee will be issued as an attached file of this contract.
────────────────────────────────────
───────────────────
XIII. Ways to resolve contract disputes
────────────────────────────────────
───────────────────
14. Other terms negotiated by both parties
────────────────────────────────────
───────────────────
┌──────────┬─────────┬──────────────┐
│ 定作方│ Contractor ││
│Unit Name│ Unit Name│ Forensic opinion: │
│Unit Address: │ Unit Address: ││
│ Legal representative: │ Legal representative: ││
│Authorized Agent: │ Attorney: │ Manager: │
│Phone:│ Phone: ││
│ Telegraph registration: │ Telegraph registration: │ Forensic authority │
│Bank of deposit: │ Bank of deposit: │年月日日│
│ Account: │ Account: │ Confirmation of Voluntary Principles │
└──────────┴─────────┴──────────────┘
Validity period: year, month, day to year
Producer: Printed unit:
Processing contract
The author: _________________ contract number:
Contractor: _________________ Signing location:
Signing time: year, month and day
1. Product name or project, specification model, quantity, unit price, amount, delivery period
┌────┬──┬──┬──┬──────┬─────────────┐
│││││ Price or Remuneration │ Delivery Quantity and Delivery Period │
│定定物│Specification│Measurement│Quantity├──┬───┼──┬──┬──┬──┬─┤
│Name or Project│Model│Unit││Unit Price│Total Amount│Total ││││ │
├────┼──┼──┼──┼──┼───┼──┼──┼──┼──┼─┤
││││││ │││││ │
├────┼──┼──┼──┼──┼───┼──┼──┼──┼──┼─┤
││││││ │││││ │
├────┼──┼──┼──┼──┼───┼──┼──┼──┼──┼─┤
││││││ │││││ │
├────┴──┴──┴──┴──┴───┴──┴──┴──┴──┴─┤
│ Total RMB amount │
└──────────────────────────────────┘
Second, the fixed party material
┌───┬───┬───┬───┬───┬───┬───┬──┬───┐
│ Materials │ Specifications │ Measurement │ Quantity │ Quality │ Provide │ Consumption │ Price │ Total Amount │
│ Name │ Model │ Unit │ │ │ Date │ Quota ││ │
├───┼───┼───┼───┼───┼───┼───┼──┼───┤
│ │ │ │ │ │ │ ││ │
├───┼───┼───┼───┼───┼───┼───┼──┼───┤
│ │ │ │ │ │ │ ││ │
├───┼───┼───┼───┼───┼───┼───┼──┼───┤
│ │ │ │ │ │ │ ││ │
└───┴───┴───┴───┴───┴───┴───┴──┴───┘
Third, quality requirements, technical standards
────────────────────────────────────
───────────────────
4. Conditions and time limit for the contractor to be responsible for quality
────────────────────────────────────
───────────────────
V. Technical information, drawings and methods for confidentiality
────────────────────────────────────
───────────────────
6. Acceptance criteria, methods and deadlines
────────────────────────────────────
───────────────────
Seven, packaging requirements and cost burden
────────────────────────────────────
───────────────────
Eight, delivery methods and locations
────────────────────────────────────
───────────────────
9. The amount and time of delivery of the deposit advance payment
────────────────────────────────────
───────────────────
X. Settlement method and term
────────────────────────────────────
───────────────────
XI. Liability for breach of contract
────────────────────────────────────
───────────────────
12. If a guarantee is required, a separate contract guarantee will be issued as an attached file of this contract.
────────────────────────────────────
───────────────────
XIII. Ways to resolve contract disputes
────────────────────────────────────
───────────────────
14. Other terms negotiated by both parties
────────────────────────────────────
───────────────────
┌──────────┬─────────┬──────────────┐
│ 定作方│ Contractor ││
│Unit Name│ Unit Name│ Forensic opinion: │
│Unit Address: │ Unit Address: ││
│ Legal representative: │ Legal representative: ││
│Authorized Agent: │ Attorney: │ Manager: │
│Phone:│ Phone: ││
│ Telegraph registration: │ Telegraph registration: │ Forensic authority │
│Bank of deposit: │ Bank of deposit: │年月日日│
│ Account: │ Account: │ Confirmation of Voluntary Principles │
└──────────┴─────────┴──────────────┘
Validity period: year, month, day to year
Producer: Printed unit:
recommended article
- Contract (including transportation)
- LOGO Design Registration Agreement
- International tanker charter contract
- Contract
- Car maintenance contract
- Lighter processing installation contract
- Maintenance contract
- Computer maintenance agreement
- Mud painting contract
- House demolition entrustment contract
- Jingmen City residential decoration and construction project construction contract
- Parking contract
popular articles
- Blessing phrase
- Philosophical words 2019
- Non-mainstream sentence 2019
- Distressed sentence 2019
- Decoration contract demonstration text
- Relieved words
- Contract
- Commissioned production contract model
- What I said to my father 2019
- Construction and installation engineering construction contract
- About building a ship contract
- Processing contract model
- Motivate employees
- Repair repair contract
- Hyun dance family impression sentence
- Encourage words 2019
- Space mood phrase
- 2014 motivational phrase
- Good sentence excerpt 2019
- Grateful mother's words
- Life motto
- Sample of the processing agreement (light industry)
- Respect the teacher's famous words
- Not afraid of failure
- Legal maxim
- Print production contract
- Weibo's famous sayings
- Spring Festival blessing
- Parental love
- Pump repair contract