Work plan > work plan essay

Survey and design management work plan for 2019


The year is the last year of the "10th Five-Year Plan", and it is also the first year of the implementation of the strategic thinking of Daqing's sustainable development under the guidance of the scientific development concept, the construction of the strategic highland for the comprehensive development of Daqing, and how to seize The current opportunities brought about by the new upsurge in the economic development of Daqing and the acceleration of the development of the survey and design industry are the top priorities of our work. To this end, we have changed our inherent management concepts, changed our work style, and served the enterprise and planned corporate development as the purpose of work management. We “squat down” to discuss with the company, find gaps, talk about deficiencies, find ways, and take countermeasures. The overall ~ annual work report, research and development - annual survey and design work. The following is the report of the survey and design management-year work.
I. Guiding Ideology to conscientiously study and implement the spirit of the Third Session of the Sixth Session of the Municipal Party Committee and the Urban and Rural Construction and Management Conference of the Municipality, closely focus on the work of the Bureau, fully implement the scientific development concept, focus on improving design quality and reducing design waste, and Market chaos, corporate governance as the main line, emancipate the mind, innovative thinking, further standardize the city's survey and design market, provide policy services and technical support for the construction of the city's urban and rural construction development strategy new highland.
Second, the overall idea The general idea is: innovation mechanism strong supervision, formulate methods to promote development, improve standards to improve quality, strengthen leadership protection projects, strengthen coordination and implementation.
While completing the daily management work, we must focus on the following tasks:
Third, the main work and work measures, standard procedures, formulate the system, increase the intensity of the construction drawing review, for the city construction services, one is to further standardize the construction drawing review program, and implement the construction drawing review and filing system. It is necessary to conduct pre-examination of the project, review and record, and keep the filing report for the relevant procedures such as project bidding and construction permit, and enhance the timeliness and accuracy of the review work. At the same time, it focuses on the review of gas, pure water and energy-efficient building design projects in residential design. Items that are not reviewed or rejected are not approved.
The second is to strengthen management and formulate the Measures for the Quality Management of Construction Drawing Design Files. In light of the problems of poor quality and insufficient depth of the survey and design archives in the current market, the questionnaire survey was used to organize the survey and design units and the construction map users to discuss 15 issues. In accordance with the existing problems, the "Measures for the Quality Management of Construction Drawing Design Files" was enacted, and the association was entrusted to organize relevant personnel to carry out systematic learning. It should be known that they should be responsible for each other, and then strengthen the management of construction drawing design files and improve the design quality.
The third is to improve standards and improve the quality of survey and design. The preliminary research work for the preparation of the "Local Standards for Geotechnical Investigations in Daqing Area" has been basically completed this year. The next step is to entrust Daqing Oilfield Engineering Design Technology Development Co., Ltd. to enter the substantive work stage, and actively apply for scientific and technological fund support, planning for XX years. The standard publication work was completed on May 30th. In addition, the research work on design standards will be further carried out, and other local standards will be prepared to supplement the missing and blind spots in the standard, and provide technical support for improving the design quality as a whole.
Fourth, the survey and design station and the design review agency should enhance service awareness and actively serve the owners and survey and design units.
Strengthen self-discipline, advocate integrity, and promote the rapid development of survey and design enterprises.
First, we will step up the implementation of the "Measures for the Credit Rating of Survey and Design Enterprises" and promote the credibility construction of "honesty, integrity and integrity". Take Daqing City survey and design enterprise market behavior reputation file as the line, each survey and design unit is the point, the market is the face. Multi-party participation, multi-party supervision, jointly maintain market order and achieve industry self-discipline.
The second is to give full play to the functions of the association and strengthen the self-discipline management of the industry. In accordance with the "four transformations" thought put forward by Director Yao, we will further transform our functions, change government management into industry management, give full play to the status and role of survey and design industry associations in the survey and design consulting industry, and safeguard the interests of the industry. Serve the member units and serve the government authorities. Adjust and enrich the strength of the association, adjust the association's legal person and secretary-general, and let the association play a greater role in promoting technological progress, strengthening supervision and management of member units, maintaining market order, and standardizing professional ethics, and gradually establishing a relatively perfect Industry self-regulatory mechanism.
The third is to carry out pilot work on the return of engineering survey and design quality. Organize construction owners, construction units, engineering design units, construction drawing review agencies to conduct regular visits to representative or key engineering design projects, summarize design work experience and existing problems, to continuously improve design work, improve design quality, and shape one Supporting scientific design, technical excellence, innovation, and actively developing talents.
Transforming thinking and innovation management, and improving the overall strength of survey and design, is to improve the standards of foreign companies entering the Qing Dynasty and change the filing methods of foreign survey and design enterprises. The change of item by item is the annual filing of the foreign company, and the credit rating assessment form is issued, and the project undertaken by the unit is tracked and applied. For the small and medium-sized surveying and design enterprises below the B, which are seriously disturbing the survey and design market of our city, or the credit rating of the survey and design market is not up to the a-level standard, it is not allowed to enter the survey and design market of the city to undertake the survey and design tasks to ensure The quality and service of engineering survey and design in the city has reached a new level.
The second is to promote high quality and high prices, guarantee design fees, start with optimization design, enrich the construction of information platform for survey and design enterprises, and introduce excellent management and design institutes and advanced technologies with international and domestic advanced level. Provide convenient conditions, enrich design creation, and eliminate design duplication and inbreeding.
The third is to carry out outstanding design activities. Each design institute shall, in accordance with the requirements of relevant regulations, formulate implementation methods for Chuangyou Design to ensure that excellent design activities are carried out extensively and in depth.
The fourth is to implement the county-level joint management mechanism. Bring into play the supervisory functions of the county and district construction bureaus, coordinate and coordinate, and jointly manage. Reasonable division of labor, overall coordination, so that the city's survey and design management work at the management level, the work is more in-depth, meticulous, comprehensive and more implementation. In particular, after the construction drawing review work was changed to industry self-discipline, it brought great difficulties to the supervision of construction drawing review. To this end, we fully mobilize the enthusiasm of the county and district construction authorities, increase the county and district construction administrative departments to review the construction drawings, and implement a monthly filing system to strengthen the supervision of the county's record management.
Active coordination and three-dimensional cooperation, systematically promote the construction of energy-saving work. First, do a good job in mapping. The project entrusts Daqing Petroleum Institute to test the existing houses, count the number of energy-saving buildings that meet the standard and the heat supply of the city, and further analyze the construction of the city. Energy conservation, providing data protection for research and formulation of relevant policies, laying the foundation for promoting building energy conservation monitoring and identification work, and implementing standards for building energy efficiency design

, building energy-saving construction specifications, building energy-saving project acceptance, building energy-saving testing and certification, energy-saving building heating preferential policies, combining building energy conservation with urban heating system, so that heat source supply units and heat source users fully understand the importance of energy conservation, The relationship between building energy conservation and economic benefits, as well as the feasibility of energy-saving renovation of old houses, strengthen the supervision and inspection of building energy-saving projects, reward and fine, and ensure the smooth implementation of building energy-saving work. Formulate relevant economic incentive policies for promoting the construction of energy-saving and land-saving housing,
The third is to further strengthen the supervision of the whole process of construction, design, construction drawing review, construction and acceptance of energy-saving buildings, and set up inspection stations to monitor new and old energy-saving buildings, as “Interim Provisions on the Issue of Heating Fees for Energy-Efficient Residential Buildings” The notice of the implementation of the file provides assurance.
, demonstration guidance, complementary advantages, and do a good job in the integration of survey and design enterprise qualifications.
Our city's survey and design enterprises are at a low level and low level in terms of system, mechanism, business model, service function, management level and technical quality. In the business model, the vast majority of survey and design units are large, comprehensive, small and comprehensive hospitals, few professional institutions. In the management level and market operation and operation, it is worrying, and the technical personnel are lacking. In the next period, we must first focus on solving the problems of talents, policies, and markets as the main contradiction of enterprise development. We should start with improving the competitiveness of enterprises, increase policy guidance, integrate design resources, and form the three pillars of talents and market policies. Secondly, with a set of activities as a breakthrough, with the opportunity of Wuyuan County planning to withdraw from the county to build a city, the first to coordinate the development zone planning and design institute with the Wuyuan County Architectural Design Institute integration, mutual benefit and mutual benefit, to achieve a win-win situation.
Give full play to the role of industry associations to provide dual services. First, industry associations organize the training of survey and design personnel in our city, and re-educate talents. The second is to organize the city's survey and design enterprises to participate in the design and evaluation activities of the Sheng State, to enhance the visibility of the city's enterprises. The third is to carry out the credit rating of the city under the entrustment of the survey and design station. The fourth is to organize experts, design units, and management units to carry out construction, construction and demonstration work on the TV tower overpass, explore the causes of the Yifa accident, and explore the rectification plan.
Multi-party coordination and speed up the promotion of the Longfeng Water Supply Project.
After the preliminary plan demonstration and construction drawing design, the preliminary work of the project has been basically completed. The project is scheduled to last for 90 days and is scheduled to be constructed at the end of March. In the next step, we will actively organize Longfeng District, City Jian'an Company and other units to coordinate project project establishment to ensure that the project will be launched on time. In order to ensure the smooth implementation of the project, a leading group composed of relevant units will be established to improve the project management and promotion plan. Formulate the project schedule, promote the project according to the plan, and strive to complete the project promotion work with high standards and high quality.
Do a good job of supervision and implementation. Up to the year, the residential buildings have been designed according to the energy-saving 50% standard, but some people's building energy-saving awareness is relatively weak, and the energy-saving design is modified without authorization. Similar problems exist in the work of natural gas and pure water. Therefore, we will increase coordination and give full play to the role of various departments of various departments to implement building energy conservation, natural gas, and purified water.
First, we must actively coordinate all relevant departments within the bureau, increase supervision and management of building energy conservation, natural gas, and pure water to work in the home, realize the coordination mechanism of departmental linkage and information exchange, strictly control the various gates, and not carry out building energy conservation. All natural gas and pure water will not be allowed to continue construction, and no completion will be filed.
Second, we must actively coordinate with the National Development and Reform Commission and the Planning Bureau, strictly examine and approve the project approval, provide planning and approval, and provide planning and design conditions for the construction unit to facilitate the commissioned design. Increase the cooperation between the departments, and if necessary, establish a leading group of city leaders as the team leader to form a joint effort to promote the construction of natural gas and pure water.

recommended article

popular articles