Work plan > work plan essay

2019 University Sports Department Work Plan


“Everything for athletes” is the focus of our work; “Building the strength of the three hospitals” is the goal of our work. Although people have changed, our goal remains the same! New Year, newcomers, new challenges. We will do every job in a down-to-earth manner, stand on the shoulders of giants, and strive for the beautiful tomorrow of the Three Houses!

The Third Session of the Youth League Committee of the School of Computer and Control has been established. As one of the departments with high hopes, the Ministry of Sports will do its due diligence this year to do a good job and win glory for the Three Houses. All the staff of the sports department firmly believe that we will definitely raise a step on the basis of the original results! Because we firmly believe that we have strength, we firmly believe that we will always be the best! All the work of the Youth League Committee of the Youth League can be actively participated in the sports department. All the difficulties and setbacks will be actively negotiated and resolved. We will definitely show all the members of the Third Academy a new and dynamic sports department.

The specific plans of this department are as follows:

First, the "May 4th" Cup: The Ministry of Sports will do all the work on the May Fourth Movement: on the basis of the established basketball, volleyball, badminton, table tennis and other teams, select the team leaders and develop training. Plan to help the teams to establish a good management mechanism, and select a group of outstanding players at the 07 and 08 levels as soon as possible to fully prepare for the "May 4th" Cup. The important point is that the reserve talents lay a good foundation for the long-term development of the college sports. Pay attention to the specific time of all the competitions in the three hospitals, and post posters in time for the students of our school to know the competition time, and then they can go to cheer for our team; arrange two or three people every day to go to the competition site to work. To provide logistics services for the team members, our department will try our best to ensure that the athletes train the venue, make the relevant facilities have good guarantees, and carry out humanistic care so that the players can compete in the best mental state; strive to get the expected good results!

Second, always pay attention to the upcoming "Champion" Cup, assisting the Football Association to arrange one of our traditional activities in the "four-a-side" football game.

3. In the near future, a sports event jointly organized by the Youth League Committee Student Association and various grade committees and associations will be held.

4. In the next semester, our department will cooperate with the new students to enter the school. At the same time, we will also disseminate relevant sports knowledge among freshmen, enhance the students' awareness of sports, and enhance the collective sense of honor of our students. At the same time, we will guide our students' physical activities. Carry out; organize some special sports activities, improve the sports standards of the students, and enhance the physical and emotional exchanges of the students.

5. In the next semester, after the reception of the new students, the Ministry of Sports will arrange the organization of the Games as soon as possible to win more valuable time for athlete training. The college games are mainly for students in grades 08 and 09. They not only strengthen the competition and solidarity among all grades and classes, but also conduct a large training for the school to participate in the school games. The 07 and 08 levels are mainly voluntary participation. The athletes of the original hospital must participate, and the freshmen of 09 are participating in the class.

Sixth, preparing for the school sports meeting: preparing for the school sports meeting, this is the focus of the Ministry of Sports every year is also difficult to work, but I believe that we will not bow in front of difficulties, we will hire excellent responsible coaches to provide high-quality training, improve athletes Passion. We are confident and capable of completing the training of athletes and ensuring the logistics work, and fighting for the best results in our school!

Seven, actively preparing for the battle school basketball volleyball autumn league

Our department will still organize the training of the team members as soon as possible, and do a good job in organization and logistics support. We will definitely pay close attention to this competition and cooperate with the grade committees to do a good job in this competition.

8. The Sports Department will also actively carry out some innovative activities. And our members will be more than happy to help other departments carry out all the work.

The above is the general work plan of the sports department, more details need to be improved!

In the past year, the productivity of our factory has increased greatly due to the improvement of the machine. This is something that everyone of us is happy with. After the machine correction process, the production efficiency increased, the requirements for the workers were gradually reduced, and it was no longer as troublesome as before. It was tiring. This is the most commendable place.

One year is about to pass, and we are looking forward to the coming of the new year. In the new year, we will work better.

According to the 2019 production work plan formulated by the company, the production tasks in 2000 are heavy, the production time is tight, and the equipment maintenance time is limited. Most of the large and medium-sized repairs of equipment maintenance are carried out by means of inspection and inspection of the needles, and we strive to carry out planning. Part of the overhaul will be notified to the workshop by the production department according to the company's production and operation plans and equipment operation. The work arrangement is as follows:

1. Initially promote the demonstration of equipment maintenance and maintenance model positions. First, the power plant boiler room is used as a demonstration point.

2, each workshop in the daily work to implement a variety of equipment management systems, including equipment daily inspection, maintenance, equipment daily maintenance, repair and overhaul.

3. The production technology department and each workshop shall set up important equipment accounts, use the account statistics to analyze the operation characteristics of important equipment, the inventory of accessories, carry out accessory planning or self-made processing in advance, and propose maintenance plans in a predictable manner; The annual training plan, equipment administrators should combine their own practical experience to carry out equipment technical training for each workshop mechanic. Each workshop should use the safety of the team to carry out daily equipment technical training for the mechanics, and continuously improve the machine repair and machine operation. The technical level of the team.

4. Due to the corrosion, aging and technical strength of the acid-making workshop equipment.

5. The equipment deputy manager and equipment manager should frequently go to the workshop to produce first-line inspections and understand the operation of all important equipments, track the inventory and procurement of major spare parts, and urge the supply department to purchase the main shortage of accessories and inspect the workshop's own accessories. Processing and production, to ensure that the main accessories are used as needed; check and urge the workshop to do the daily maintenance of the equipment, and make technical guidance, do a good job of installation, maintenance, use, maintenance, inspection and statistics; reasonable coordination Production and equipment maintenance work, strengthen the inspection of equipment, and enhance the planning and maintenance work. In the event of an abnormal situation, make timely adjustments. When encountering the repair task, do the work of the three workshop mechanics to ensure continuous and stable production.

6. Do a good job in the statistical investigation of the maintenance of production equipment, and provide statistical basis for the 2019 equipment work plan.

7. Pay attention to the exhaust dust collection system of the *** line one-stage furnace, and consider the plan to re-arrange and select the cyclone and an exhaust fan to transform. Solve the problem that the dust collection effect of the furnace is often poor, causing the fan to often shake the impeller.

8. Know the market information in time, and find out the applicable new materials and new equipment, and plan and apply in time to extend the service life of the equipment.

9. Plan to carry out a comprehensive inspection and repair work on the power plant gas stove, install a protective cylinder for the worn furnace seat, and replace one of the attached files with the second column.

10. Carry out comprehensive inspection and maintenance work on the 4t boiler, and thoroughly clean the scale in the furnace once.

11. Unscheduled inspection of the repaired cryolite cryolite drying cylinder and related components twice.

In 2019, it is necessary to strengthen the inspection of the acid-making workshop equipment, strengthen the thoroughness of the equipment design of the acid-making workshop and the preparation of sufficient spare parts, and supervise the control of the temperature of the reaction furnace in the acid-making workshop, and ensure the reaction from the use. The normal use of the furnace body reduces abnormal corrosion.

1. Plan to replace the coke tower and air duct of No. 6 reactor

2. In view of the frequent damage to the roller and shaft of the reaction furnace in the acid-making workshop, the unloaded roller axle and the supporting roller are dealt with in time for external repair, so as to stay in reserve.

3, irregularly planned outsourcing reaction furnace φ1800 cylinder a total of 54m. The thickness of the selected steel plate was changed from the previous 20mm to 24mm to shorten the cycle of the reactor repair welding cylinder.

4. About 21 reactor stirrers are produced from time to time, and 12 reactor bells are processed and repaired.

5. Considering the spare parts of the acid pump, mixing tee, mixing shell and sealing seat in a timely manner, the plan is given in time, and communication with the supply department is strengthened and contact tracking is strengthened.

6. Irregularly plan 3 sets of metal-lined rubber fans 9-19-8d fans and 8 fan impellers.

7. Consider the plan to replace the 3# neutral and furnace size gears, and carry out large-area repair welding on the heavily corroded neutralization furnace body.

8. Separate and clean the heat exchangers in the workshop in time and time, consider the water consumption and water quality of the acidification, and maintain the cooling effect.

9. Plan 2 # spiral spindle spiral of the slag discharge machine and 1 set of components.

10. According to the company's production and operation, plan to clean up the absorption tower packing.

Carefully arrange the production start and stop plans, reduce the number of opening and closing, and rebuild the production time, and strengthen the analysis and judgment of the production situation. When abnormal conditions occur during production, preventive measures are proposed early and countermeasures are taken to ensure the normality and continuity of production.

We will continue to improve production efficiency and reduce the fatigue and danger of workers' production. This is the direction that our factory has always adhered to and the necessity of the progress of the times. In the future production work, we will do better!

recommended article

popular articles