Technical leader's work summary


Technical leader's work summary

The work in 2019 is coming to an end. Since I became the technical leader of the project, I have been afraid of neglecting my work because of lack of professional skills and lack of management experience. I am cautious, down-to-earth, conscientious and pragmatic, and efficient and new. According to the actual situation of my work, I have made an analysis and assessment of my work, so that I can develop my strengths and avoid weaknesses in the future work, and provide a basis for continuous improvement of working methods and improvement of work efficiency in the future.

I. Work done in 2019

1. After the organization participates in the reading and drawing review work, organize the project construction personnel and labor team to read the drawings and find the questions in the drawings in time. And participated in the drawing review work of the project, the content of the review will be collated and signed, and the project review and review work will be carried out in time for all departments and construction teams of the project department.

2. Compiled and improved various special construction plans Due to the special nature of the project, the change of the drawings, the drawing of the drawings to the drawing review and the preparation of the plan and the design of the construction organization, and the current construction caused many difficulties, according to the actual situation, timely preparation Technology and security solutions. And the relevant personnel technical and safety coverage.

3. Timely do a good job in technical negotiation and change. In the construction, due to the lack of functional drawings in the construction drawings, temporary changes are often made during the construction process. The changes to the visas before the construction are timely and accurate. If the visa cannot be used before construction, the visa will be issued immediately after the completion of the construction. The materials in the construction will be synchronized with the construction and filled in and collected in time.

4. The process of each process was carried out in accordance with the company's technical methods for each branch project, combined with the actual situation of the project site, timely technical and safety coverage of the project management personnel and labor team. Clearly meet the construction standards for quality inspection and control of the process.

5. Timely carry out the preparation and control of various plans in combination with the actual situation on the spot, and prepare the schedules for the total, ten, month and week, and release them to the team, and supervise and check the completion of the work every day, and analyze the reasons for the unfinished work. Effective control measures to ensure construction progress.

6. Quality Process Management Since the start of construction, the quality of the project has been placed first. In the construction, cooperate with the supervision and guidance of the supervision engineer, strictly follow the requirements of the specification, and adopt the process management point control method for the quality control of the construction process. With the quality assurance of the process and the quality of the sub-projects, the "three inspections" system will be implemented conscientiously. Anyone who fails to rectify the process quality standards will not be transferred to the next process until the inspection is qualified.

Second, the 2019 work plan The goal of 2019 is to create a united, collaborative, and learning project department. Improve the technical management level of the project department, so that all management personnel of the project shoulder the responsibility of quality, construction period and safety.

1. Positioning can only be better managed if it fully recognizes the role in the project. As the project technical person in charge, a site manager must first determine his or her position. The site management personnel are the embodiment of the company's interests and must be in a higher position for project management.

2. Self-study In the new year, first strengthen knowledge learning and continue to improve management. I believe that as long as you work hard, you will have results.

On the other hand, actively learn the advanced features of others, and make efforts to avoid weaknesses, further improve their ideological understanding, and broaden their horizons.

3, strengthen the team's learning as the project technical person in charge, I must play a good role in advocacy, organize project management personnel to strengthen the study of technical knowledge.

These are my work summary for 2019 and the work plan for 2019. As the project technical leader, in the future work, he will meet new challenges with a hundred times of enthusiasm, continue to improve his technology, management theory system, and strengthen technical management capabilities. In 2019, I have the confidence to be able to build the project department into a team that is technically capable and able to win.

Technical leader's work summary

As time goes by, 2019 is coming to an end. On the occasion of the resignation of the old and the new, the first phase of the project, through the hard work of the construction unit management personnel and workers, the first phase of the project has been completed. After the acceptance of the competent units at all levels has been handed over to the owner, during the construction process, whether as an ordinary engineering and technical personnel or as a technical person in charge of an engineering project, I feel that it is not only to manage a project not only It is necessary to strictly abide by the national construction norms and regulations, but also to link theory with practice, to learn and use, to continuously summarize the experience of construction management, to continuously improve and innovate in technology, to find out the deficiencies, to enrich themselves, and to make the enterprise have the stamina for long-term development. The past work is summarized as follows:

First, the specific task

1. Responsible for the supervision and management of outdoor landscaping projects in 1# to 6# buildings. Landscaping is related to the overall impression of the community. Therefore, every detail must be strictly checked. The progress of quality assurance is required. At present, the special acceptance of landscaping has been completed.

2. Responsible for the after-sales service maintenance work of 1# to 6# building. Since the beginning of the after-sales service maintenance work on October 1, the company has closely cooperated with the property company to organize the maintenance of the construction unit in time and solve the various quality complaints of the owners. The problem and got the praise of the owners. In the after-sales service maintenance work, the most important thing is to have a good attitude towards the owner after receiving the complaint. We must first patiently explain it, and then actively arrange the construction unit to organize the maintenance personnel to arrive on time according to the agreed time. At present, the main problem is that the maintenance speed of the construction unit is still not keeping up, and it is necessary to strengthen supervision. Among the various quality complaints handled, there are many problems with water leakage, and most of them are found after renovation. Therefore, it is necessary to strengthen the acceptance of concealed works during the construction process to prevent problems before they occur. In addition, some detailed processing should be in place, and management supervision should be strengthened in construction management.

3. Responsible for the supervision and management of civil construction in the 5# building. Due to the influence of weather, the 5# building has a tight time for delivery and a large amount of work. By actively supervising the construction unit to optimize the construction plan, working overtime, and actively coordinating the mutual relations between the construction units, solving a large number of problems in the construction. And contradictions, to ensure that the smooth delivery of the house to the owners on October 1. But it also exposed many management deficiencies. Due to the heavy problem of indoor floor emptying and roof seepage during the construction period, after the delivery of the house, the company has completed the maintenance and repair, and has completed more than 95% of the delivery rate, and most of them have been renovated and started to stay.

4. Responsible for the supervision and management of civil construction in the 6# building. The construction of 6# building is strictly in accordance with the progress plan formulated by the company, carefully organized and strictly managed. The construction work before completion is completed two months in advance, and the self-inspection and self-inspection of the household inspection and acceptance is carried out carefully. The house was successfully delivered on August 28th. Complaints and repairs were greatly reduced after delivery, and received favorable comments from the majority of owners.

5. Responsible for the supervision and management of civil construction in the 7# building. Before the construction stoppage, the construction site was under construction, and the inspection and acceptance of each layer of steel was strictly checked. The specifications and binding of the steel bars, the support of the formwork and the protection of the external scaffolds were reviewed, and the construction party committee was urged to do all kinds of protection. Complete the construction of the fourteen-story structure.

6. Responsible for the landscaping project of the 10# building. At present, the project has been successfully completed according to the scheduled schedule, and preparations for green planting next year have been completed.

Second, quality control:

1. When the construction unit enters the site, we require the construction unit to enter the management personnel to prepare the responsibility form and attach the contact information. The person in charge of the building maintains contact and implements the rectification measures during the supervision process, and promotes the progress and quality of the project. Safety and on-site civilized construction have achieved certain results.

2. After the quality target is determined, the construction unit is required to carefully prepare the construction organization design and construction plan before the project is constructed. At the same time, for the quality control points, we organized the person in charge of the building number and the management personnel to meet at the end, and asked the management personnel to grasp the key points.

3. For the common quality problems in the construction, the construction unit shall prepare the treatment plan, and the engineering department cooperates with the supervision company to carefully review it. During the processing, the engineering department personnel and the supervisor must be present at the same time to guide the construction unit construction.

4. When the materials of the construction unit enter the site, the quality is strictly controlled. For non-designated materials or unqualified materials, it is strictly required to clear the appearance and it is strictly forbidden to use.

Third, with the work:

Unite colleagues, work together, communicate with each other, maintain a responsible attitude of rigorous certification, and strictly demand yourself. I don’t understand the problem and ask my colleagues for advice, and constantly improve my work. Actively cooperate with the maintenance work of the property company, analyze the problems in a timely manner, solve them in a timely manner, and do not shirk responsibility. Reasonable explanations for the unreasonable demands of the households, and the satisfaction of the households for the purpose of the work.

Cooperate with other departments of the company to provide effective and accurate information.

Fourth, the lack of work:

The work in this year has achieved certain results, and individuals have made great progress, but the shortcomings still need to be correctly recognized and corrected. First of all, the professional aspects of the technology is not high, but also need to study hard, open-minded advice and experience accumulation. Secondly, the management method has not yet mastered the essentials, and the management level needs to be improved. The third consideration of engineering problems is not comprehensive enough, and occasionally there will be omissions, and the methods of dealing with them are somewhat rigid.

In this year's project, there have been many unsatisfactory things. The quality is not as good as the previous projects. The actual project progress has a certain gap with our requirements. This shows that there are still many places in the management work that are not in place. For the above reasons, I personally think that the quality of the construction unit is also one of the reasons.

Next year, with the expansion of the company's development projects, our work will be more arduous and the requirements will be higher, but this is also a challenge. In the face of such challenges, I will work harder and constantly improve my professional knowledge and technical level. Openly ask the leaders and colleagues to learn, and strive to make breakthroughs in management. At the same time, we strictly demand ourselves, earnestly sum up experience, overcome deficiencies, carry forward the spirit of hard work and hard work, hone ourselves in the work, and grow talents in learning.

5. For the development of the company in the past year, the recommendations are as follows:

1. Strengthen the company's process construction, streamline unnecessary links, and form reasonable and effective program files. For example, the process of design change and visa processing is refined into a simple flow chart, and each project department is issued for operation.

2. The main responsibility of after-sales service maintenance work is placed in the property company. The engineering department engineer is only responsible for on-site identification of quality complaints. After the responsibility is determined, the property company will contact the construction unit for maintenance and related work, which can reduce the after-sales service docking. It is convenient for timely maintenance work.

3, organizational development training, can enhance the sense of solidarity and cooperation between employees, but also enhance the individual's self-challenge ability.

Technical leader's work summary

Since I joined the work in May 2004, I have worked hard and worked hard. With the guidance and help of my predecessors and masters, I have grown into a technical staff with strong business capabilities. Here is my experience:

First, the attitude is correct, rigorous science

Construction work is a very tough industry. It is windy and sunny, and it needs to be run everywhere, and it requires careful work. Therefore, there is no optimistic attitude towards life and a rigorous and scientific work spirit. Although the measurement and test work can't be scientific research, it is definitely not a sloppy one. "The difference is a thousand miles, and the lost one is just a metaphor for the measurement work, and the "one son is wrong, the whole disk is lost" is just used to describe Test work.

Second, carefully scrutinize and earnestly verify

In the measurement and test work, the spirit of “careful scrutiny and careful verification” is very much needed, because it is not only a problem of work style, but also directly related to the quality of work.

Before the measurement and construction, the map must be carefully reviewed, and the place with errors on the map should be promptly submitted to the design and supervision unit. Before measuring the payout, use the data given in the drawings, use various formulas to verify, and use different calculation methods to repeat the calculations to ensure that nothing is lost.

Before preparing for the test, it is necessary to revisit the drawing to see if the design drawings have special requirements on the materials, or where there is any conflict with the current specifications. If there is a conflict, take the principle of “strictly and not wide” and timely Make a written report to the director. Before the test, it is necessary to revisit the operation procedure to ensure that the operation is correct, and it is impossible to read while reading, even if it is a simple test. Pay attention to the preservation and timely sorting of all kinds of raw data, because "experience is summarized from numerous data"!

Third, keep making progress and keep improving

Keep learning at work and be good at summing up experience. After working for more than five years now, I have participated in various training courses and classes in addition to studying my business seriously at work.

The society is progressing, the times are developing, and only by continuous learning can we keep pace with the times. Various new construction materials and construction tools have been continuously applied to the construction of roads and bridges. In contrast, more construction techniques and construction methods have emerged, and various specifications have followed suit. If you can't improve yourself, you can't adapt to the development of road and bridge construction work.

Fourth, combine the actual, innovate

In the work, we must constantly sum up experience and lessons, and constantly improve, and apply the learned knowledge to the work in order to improve work efficiency. Such as:

1 The measurement and test data are directly input into the computer by the instrument, and the system calculates it by itself, which can greatly reduce the chance of error, save a lot of time, and is very convenient for saving, transferring and outputting data.

2 Enter the relevant data in the drawing, such as line position and bridge coordinates, into AutoCAD, it is very easy to find out whether there is a problem with the drawing, and the relationship is easy to straighten out.

3 In the lottery operation of the total station, the “resection method” can reduce the requirements on the site.

4 The drawings do not provide coordinates and no nearby wire points. It can be assumed that a point on the graph is the coordinate origin. Using the various relationships on the graph, input to autoCAD to calculate the coordinates of other points, and review various data. And the data output is very easy, and then use the calculated coordinates to use the "coordinate stakeout" function of the total station, which can speed up the work process, especially reducing the time in the field.

......

Five, the head of Nabaijia, make up for their own short

In the contact with the design, supervision and other units to absorb the experience of others, usually go to other construction sections to observe and learn, to learn their advanced construction methods and construction techniques. From the success or failure of others, we can see where the problem lies, and at the same time, we can also see our own shortcomings in order to achieve the goal of “the longevity of the family and the shortcomings of one.”

Six, strict and careful, considerate

In the work, the issues must be considered rigorous and thoughtful. For those places not mentioned in the design, it is necessary to consider the current norms and actual conditions to see if there are any omissions or errors. The following is a brief description of the various tasks:

First, the drawing review:

After receiving the drawings, the drawings should be reviewed immediately. There are many pictures, and the division of labor can be carried out. Each professional assigns a special person to be responsible, and the special person calculates the amount of work. The person examines the elevation, the person checks the coordinates, makes a clear division of labor, and has crossovers. Each job is carried out by two or two. After more than one review, the problems found shall be recorded in a timely manner, aggregated, and submitted to the design and supervision unit for further review by the technical person in charge. The following work is mainly carried out during the review:

1. Review the coordinates and comprehensively check whether the coordinates of any point are consistent with those given on the graph according to the line position table on the graph. In particular, multivariate curves, ramps, overpasses, etc., must be reviewed more than twice.

2. Check the elevation, and calculate the elevation of each point according to the height difference, layer thickness, longitudinal slope, cross slope, slope, etc. of each structure or structural layer to see if it matches the one provided on the map. If the elevation from the bottom of the pile foundation is calculated to the elevation of the bridge deck, it is calculated from the starting point of the road to the end of the road.

3. Review the quantity of the project, generally after the re-examination of the drawing size, and calculate according to the drawing size. The data in the engineering quantity table in the drawing shall not be copied. The actual situation should be considered in the calculation, such as:

A. The elevation of the pile top of some design drawings is the height of the top of the platform or the top of the beam. Then, when calculating the quantity of the project, two kinds of engineering quantities must be calculated, one of which is the quantity of measurement engineering, and the other is the preparation and construction of the construction unit. The amount of engineering used for management.

B. Be careful not to repeat calculations and missing calculations, such as:

i. If there are reserved holes in the project or there are large-volume embedded parts, the volume should be reduced.

Ii. The length of the inspection well or rainwater well should be subtracted when calculating the drain.

Iii. When calculating the engineering layer engineering quantity, pay attention to the calculation of the size and irregular area of ​​each side of the structural layer.

......

4. Review the rationality of the drawings, such as:

A. Is the consideration of the elevation, line position and direction of structures such as communication, electric power, drainage, and sewage disposal reasonable and comprehensive? Is there any interference?

B. Whether the requirements of the design drawings conflict with the current various specifications. If there is a conflict, it is necessary to analyze, discriminate between “master control and sub-control”, and discriminate “level of regulation”. Generally, “strictness is not wide”. The principles are handled and a written report is sent to the Supervisor Engineer.

Second, construction management:

1. Preparation of construction management files: The preparation of the construction report of the unit project and each sub-project should be timely and perfected, and should be adopted as soon as possible. The design of each construction organization or the preparation of the construction plan should be combined with the actual and thoughtful consideration:

A. Some sub-division projects should consider two or more construction schemes, and select them according to actual changes during construction.

B. The construction technology and the safety of the construction shall be timely and perfected.

2. It is necessary to consider whether the materials used in the drawings are more economical if they are replaced by other materials. Can the requirements of the design and current specifications be met after the replacement?

3. Do you have to consider whether there are special requirements for the construction method and construction technology in the drawings? Is it necessary to change the construction?

4. The arrangement of each construction schedule should be reasonable, and should be combined with the actual situation.