Landscape engineer job responsibilities


Part 1: Landscape Engineer Job Responsibilities

1) Responsible for guiding the selection of landscape design and environmental materials;

2) Responsible for all the audit work of the landscape professional engineering drawings, including the requirements for the construction requirements, materials and equipment in the drawings;

3) Responsible for organizing the inspection and finalist work of the landscape construction unit;

4) Responsible for the preparation of the "landscape construction unit approach plan" and "landscape material approach plan" as the basis for the preparation of the bidding plan, and control the entry time of each unit, material and component;

5) Responsible for professional work such as civil engineering, electrical, water supply and drainage, HVAC, and gas;

6) Within the scope of work, responsible for coordinating and solving the technical problems in the process of the project, responsible for guiding the work of the supervision company and the construction unit, so that the project progress and project quality meet the requirements of K company, and the key parts and the common defects and supervision are easy to occur. The engineer conducts special inspection and acceptance, and organizes inspections for each sub-item;

7) Cooperate with the completion of the project handover of the property company;

8) Responsible for on-site control work and on-site visa work for design changes within the scope of work;


Part 2: Landscape Engineer Job Responsibilities

1. Organize the implementation of landscape engineering design management, control the depth and rationality of the delivery schedule of drawings and changes, and supervise the design unit to complete the design as required;

2. Participate in the review of design achievements, drawing review and design changes of landscape engineering;

3. Optimize the cost through design optimization and achieve the expected landscape design effect;

4. Participate in the landscape construction drawing review and technical disclosure work, and timely summarize and coordinate the problems found;

5. Examine the quality assurance system of the construction unit, strictly follow the construction drawings and the requirements of the construction acceptance specification, check the inspection of the important parts and concealed works during the landscape construction process, and the implementation of the landscape construction process standards. Quality control;

6. According to the overall progress plan of the project, compile the single project construction accuracy plan for the landscape project, adjust it during the construction process, and clarify the main influencing factors in each main work line to ensure that the overall progress of the project is carried out according to the plan;

7. Strictly control the construction cost of each construction stage of the landscape project, and cooperate with relevant departments to select technical solutions and cost plans with low cost and good effect;

8. Review the civilized construction plans and measures of the construction unit, supervise the safety objectives of the inspection project, formulate a safety production inspection system, organize on-site safety inspections and implementation of on-site civilized construction, and organize regular safety production meetings;

9. Complete daily construction records in a timely and accurate manner, conduct daily supervision and inspection on the work of the supervision unit, and supervise the supervision unit to supervise the daily and monthly reports;

10. Regularly attend the regular meeting of supervision, and organize this professional coordination meeting to timely solve various problems arising during the construction process;

11. Organize and participate in the completion and acceptance of landscape work;

12. Coordinate the various landscape engineering functions in place and put them into normal use, and collect the completion data of the landscape project and submit them to the data. ;

13. Complete other tasks assigned by the leadership


Part 3: Landscape Engineer Job Responsibilities

1. Seriously implement the company's various rules and regulations management system and work procedures, and obey the leadership's work arrangements.

2. Participate in the discussion of the landscape design plan and assist the design unit to determine the design plan.

3. Familiar with the landscape construction drawing, participate in the drawing review, and do the finishing work of the drawing review.

4. Cooperate with the leadership to review the construction organization design and various construction plans, put forward the review opinions and supervise the improvement of the team, and supervise its implementation.

5. Carry out the technical disclosure of the construction unit, and do a good job in the technical delivery work before construction from the aspects of construction quality, safety, schedule and process requirements.

6. Responsible for on-site coordination of various majors in the landscape engineering project to ensure the normal operation of the project.

7. Examine the quality assurance system of the construction unit and strictly follow the requirements of the design drawings and construction specifications to ensure the quality and quantity of the project are completed.

8. Responsible for organizing the recipient visa for design changes, sporadic projects, and concealed projects to ensure the authenticity and integrity of the materials.

9. Confirm the on-site confirmation of the materials and materials and equipment that were sent to the construction site.

10. Cooperate with the price review department to review the quotation, quantity and quality of garden landscape materials and equipment.

11. Participate in engineering meetings and on-site inspections, assist on-site representatives to carry out project construction and acceptance, deal with on-site construction problems, and track feedback and implementation of on-site inspection opinions.

12. Pay attention to the dynamics of the landscape industry, learn about new materials, new processes, and new technologies, and apply them to practice.


Chapter 4: Landscape Engineer Job Responsibilities

1. Responsible for the engineering design of the water supply and drainage and fire protection system and the on-site management of strong and weak electricity;

2. Coordinate the construction unit and the supervision unit to deal with the on-site problems; be responsible for the acceptance inspection of the project, such as concealed acceptance, sub-item acceptance and completion acceptance;

3. Do a good job in organizing the relevant technical materials of this major;

4. According to the task list, design principles and specifications of each professional project, it is responsible for completing the planning and design of the hydropower aspects of the infrastructure in each professional project, and is responsible for assisting other professional design and construction personnel to complete the corresponding design and construction tasks.

5. Responsible for the review and technical treatment of the construction drawings of the relevant garden hydropower projects;

6. Responsible for the work of laying off the line and technical balance in the construction process of the relevant garden hydropower project, supervising the construction site, reviewing and supervising the construction quality, progress, controlling the construction cost and effect, etc.

7. Responsible for the internal design work of the corresponding professional design modification and change in the construction process of the relevant garden hydropower project;

8. Responsible for the completion acceptance and settlement of garden projects;

9. Other related functional responsibilities.