Fan Wen Daquan > Contract Model > Lease Contract Model

Construction materials lease contract (demonstration text)


Contract number: _________

Lessor: ______ Signing location: _________

Tenant: ______ Signing time: __year__month__day

According to the relevant provisions of the "Contract Law of the People's Republic of China", in accordance with the principle of equality and mutual benefit, in order to clarify the rights and obligations of the lessor and the lessee, the contract is signed by both parties.

Article 1, the name, specification, quantity and quality of the leased goods: __________________________________________________________________ Article 2, use and use of the leased materials: ______________________________________________ Article 3, lease term: from ____________________ to ___Year_________ , for a total of ____ days. If the lessee needs to extend the lease due to the project, the contract should be re-signed within ____ days before the contract expires.

Article 4: Rent, rent payment method and time limit for collecting rent: _______________________ How to pay and the term of rent: _____________________________________________________ Article 5, deposit

After negotiation between the two parties, the lessor collects the deposit of the lessee ____ yuan. After the renter pays the deposit, he will go through the delivery procedures. During the lease period, the deposit shall not be used as the rent; after the lease expires, the deposit will be returned to the lessee after the lessee returns the leased materials.

Article 6, the time, place and acceptance method of the delivery of the leased materials: _________________________________________________________________________.

Article 7: Custody and Maintenance of Lease Materials 1. The lessee shall properly keep the leased materials. When the leased goods are returned, both parties shall check and accept. If the leased materials are damaged or lost due to improper storage, the lessee shall pay the compensation to the lessor in accordance with the “Measures for Compensation for Lease Materials Defects” agreed by both parties.

2. During the lease period, the maintenance and expenses of the leased materials shall be borne by the ____ person.

Article 8: Change of the lessor 1. During the lease period, if the lessor transfers the ownership of the leased property to a third party, it shall formally notify the lessee that the new owner of the leased property becomes the natural lessor of this contract.

2. During the lease period, the lessee may not transfer or sublease the leased materials to a third party without the consent of the lessor, nor may it sell or make collateral.

Article 9: The time for returning the leased materials after the lease expires is: __________.

Article 10: Conditions for the dissolution of this contract: __________________________________________________________________________________.

Article 11: Liability for breach of contract 1. Liability of the lessor for breach of contract:

1. Failure to provide rental materials on time shall pay the lessee a penalty of ___% of the default period rent.

2. If the leased materials are not provided by quality, the lessee shall be reimbursed for the penalty of ___% of the default period rent.

3. If the leased materials are not provided in quantity, and the lessee is unable to use the goods as scheduled, in addition to the required amount, the liquidated damages of the default period rent shall be repaid ___%.

4. Other breach of contract: ______________________________________________________.

Second, the lessee default liability:

1. Failure to pay the rent on time shall pay the lessor a penalty of ___% of the default period rent.

2. If the leased materials are not returned within the time limit, the lessor shall be reimbursed to the lessor for a penalty of ____% of the default period rent.

3. If there is any act of transferring, subletting or selling or leasing the leased property, the lessee shall pay the penalty of ___% of the default period to the lessor, except that the lessor has the right to terminate the contract and recover the leased property within a time limit.

4. Other breach of contract: ______________________________________________________.

Article 12: The disputes arising during the performance of this contract shall be settled by the parties concerned through consultation; the local industry and commerce administration may also mediate; if the negotiation or mediation fails, the following ____ methods shall be resolved:

Submit to the ______ Arbitration Commission for arbitration;

Prosecuted to the people's court according to law.

Article 13 and other agreed matters: ___________________________________________________________________________________.

Article 14 If the contract does not provide for the provisions, it shall be implemented in accordance with the provisions of the Contract Law of the People's Republic of China.

Article 15: This contract is in the form of ____ copies, and each party to the contract holds ____ copies. The ____ copies of the sub-files of this contract are all part of the contract and have the same effect as the contract.

------------------------------------
| Lessor | Tenant | Forensic opinion: |
| Lessor: | Tenant: | |
| Residence: | Residence: | |
| Legal representative: | Legal representative: | |
|Authorized Agent: |Authorized Agent: | |
|Phone: |Phone: | |
|Fax: |Fax: | |
| Bank of deposit: | Bank of deposit: | Forensic authority |
|Account: |Account: |Manager: |
|Postal code: |Postal code: | Year Month Day |
------------------------------------

recommended article

popular articles