According to the provisions of the "Contract Law of the People's Republic of China", after the two sides reached a consensus, Party B reached an agreement on the lease of the following equipment to Party A:
First, the location of the equipment and the project situation
____________________________________
Second, the rental equipment overview
Device Name: _____________________
Specification model: _____________________
Quantity: ___________________
Random personnel: _____________
Aircraft allowance: _____________________
Lease amount: _____________________
Third, the ownership of the equipment
The ownership of all leased equipment listed in this contract belongs to the lessor. The lessee only enjoys the right to use the leased equipment during the lease period and does not have the right to sublease the equipment. The lessee may not mortgage the equipment for any reason, otherwise the full consequences will be borne by the lessee.
Fourth, the basic responsibility of Party A
1. Provide technically sound equipment.
2. The equipment enters Party B's construction site, and Party A's operators obey the dispatching and command of Party B's construction management personnel and abide by the rules and regulations of Party B's construction site.
3. Party A's hands should be constructed in accordance with the equipment operating procedures.
Fives. Basic responsibilities of Party B
1. Provide room and board for the driver of Party A.
2. Party B is responsible for the care of the equipment at the construction site and guarantees the equipment. The safety of personnel. Party B shall be responsible for compensation for damage or loss of equipment caused by Party B.
3. Party B shall not force Party A to operate illegally or overload it.
4. Party B shall inspect and accept the leased machinery and equipment at the place of delivery, and at the same time, hand over the mechanical rental receipt after the receipt and seal to Party A.
5. Party B shall conduct safety training for Party A's entry into the construction site.
six. Settlement method and related matters
1. Lease period: From _________ years _________ months _________ days to _________ years _________ months _________ days, the calculation of rent begins. If Party B uses it in advance, the rent will be calculated from the date of use. After the lease expires, Party B will hand over the equipment to Party A and handle the exit procedure. If Party B continues to rent, it needs to sign a renewal lease. When the lease is less than one month, the lease fee is calculated based on the actual number of days.
2. Settlement method: The equipment rental fee is calculated according to the monthly subscription. The first month is _________ million yuan/month, the next month is _______ million yuan/month, the third month is ______ million yuan/month, the fourth month is ______ million yuan/ Month, the fifth month ______ million yuan / month, the sixth month ___ million yuan / month, after Party A confirms the equipment, Party B will pay Party A the first month rent ______ million, and fully pay the entry and The counter freight deposit ______ yuan will be processed after the delivery. The counter freight deposit is deducted from the current month's rent at the expiration of three months. Party B shall deliver the rent for the next month to Party A five days in advance. If the rent is not paid, Party A has the right to stop the machine or remove the equipment, and the losses caused by Party B shall be borne by Party B. This device is settled on a monthly basis. If it is used less than one month, it will be settled by the whole month. More than one month, the excess is calculated on a daily basis.
3. The burden of freight: The entry fee of the equipment shall be borne by Party B, and the withdrawal fee shall be borne by Party A. If the lease term is less than March, the withdrawal fee shall be borne by Party B. Party B shall notify Party A within five days before the equipment exits.
4. Working hours: The monthly working hours must not exceed ______ hours, and the excess is calculated as ______ hours equivalent to one day to calculate the mechanical rent and the operator overtime.
5. Oil supply: Party B is responsible for providing the oil that meets the operating standards required for the operation of the equipment during the lease period. Otherwise, the loss caused by the equipment shall be borne by Party B.
6. Equipment maintenance: Party B shall assist Party A to do the maintenance work of the equipment. The maintenance cost paid shall be subject to Party A’s signature. Each part of the maintenance fee exceeding ______ yuan per month shall be borne by Party A. The part below ______ yuan shall be borne by Party B. Another party B bears the paver blades. The cost of low-value consumables such as filter elements.
7. The cumulative number of downtimes caused by equipment failures exceeds ______ days per month. If it exceeds three days, the number of days exceeded will not be included in the rental fee.
8. During the lease of the equipment, if Party B needs to transfer the construction site, Party B must obtain the written consent of Party A and ensure that Party A's equipment returns after the agreement is over.
7. The inseparable component of this contract shall have the same legal effect as this contract. The sub-files of this contract include: lease contract schedule. Rental machinery receipts. And A. Supplementary provisions made by both parties through consultation.
8. Settlement of disputes: ______________________________
All disputes concerning this contract, A. Party B shall be settled through friendly negotiation in accordance with the relevant provisions of the Contract Law of the People's Republic of China and other relevant laws. If the negotiation fails, the Arbitration Commission of the locality of Party A shall be submitted to the arbitration commission for arbitration according to the relevant procedures of the arbitration. The arbitration fee and the attorney's fees of the winning party shall be borne by the losing party.
Nine, this contract is in duplicate, by A. Party B will each hold one copy. Both parties shall take effect on the date of signature and seal.
X. If this contract is not stamped with the contract of Party A, it shall be regarded as invalid contract.
Party A: ______________________________
legal representative:__________________________
Attorney: ________________________
address:______________________________
phone:______________________________
fax:______________________________
Bank: ____________________________
account number:______________________________
Party B: ______________________________
legal representative:__________________________
Attorney: ________________________
address:______________________________
phone:______________________________
fax:______________________________
Bank: ____________________________
account number:______________________________
recommended article
- Lease contract model: housing lease contract
- Car rental agreement
- Beijing market venue leasing deposit contract
- Commercial property market lease contract
- House lease contract
- 2011 latest store rental contract essay
- Baofeng County Rural Credit Cooperatives Finance Lease Contract
- Second-hand housing lease contract
- Construction vehicle rental contract template
- Lease management bidding procedures and rules
- Industrial plant lease contract
- Scaffolding steel pipe lease contract
popular articles
- Facade rental contract template
- Taizai’s famous sayings
- 2014 is very touching words
- Qq space mood phrase
- Car rental contract (ceremonial, business)
- I want to say something to the teacher.
- Classical life motto
- House lease contract (3)
- Apartment lease contract
- Korean swear words
- Sad love sentence 2019
- House lease contract
- Du Yuexi's famous sayings
- House lease contract (1)
- Tao Xingzhi's famous sayings
- Shenzhen housing lease contract
- Strong words
- English famous words
- Teacher's famous saying
- House lease contract (2)
- Injured sentence
- Describe the fast time sentence 2019
- Counter lease contract
- a good saying that loves labor
- Shenyang City Housing Leasing Contract
- Thanks to the friend's words 2019
- Deaf people jingle 2019
- College entrance examination inspirational quotes
- Bing Xin’s famous words
- The latest high school inspirational maxim