Fan Wen Daquan > Contract Model > Lease Contract Model

Power saving equipment rental contract


Party A: ________________ Industrial Development Co., Ltd.

Representative:

address:

Party B:

Representative:

address:

After friendly negotiation, both Party A and Party B, in the spirit of fairness and cooperation, in accordance with the relevant provisions of the "Contract Law", on Party B's renting Party A ________ smart power saver to carry out energy-saving renovation, the following terms were reached:

First, cooperation methods and deadlines:

Party A shall lease the following ________ smart power savers produced to Party B for use, and shall be responsible for the installation and commissioning of Party B. In return, Party B will save the electricity cost saved by __________ in the early stage of Power Saver, and share it with Party A as the equipment rental fee according to the following ratio. After the two parties are divided into _____ years, all the equipments are owned by Party B, and their energy-saving benefits are all benefited by Party B. The specific operations are as follows:

1. The proportion is as follows: from the date of acceptance and operation to __% within __ years, Party B _____%.

2. Calculation of the total average power saving rate:

Before Party A installs the power saver, Party B shall provide a qualified watt-hour meter and assist Party A to install it in all target lighting circuits.

Total average power saving rate%=÷q

Where: q before = power consumption of the lighting system one week before installing the power saver

q after = one week after installing the power saver

Under the same line load conditions, the lighting and power system usage of the previous week after installing the power saver and the power consumption data of the lighting and power system one week after the installation of the power saver shall be confirmed by the responsible person of Party B together with the relevant personnel of Party A.

After calculating the actual power saving rate, all the personnel who participate in meter reading must sign and confirm, and the seals of both companies will take effect as the attached files of the contract. If Party B finds that the power saving effect of the power saver has changed, Party B may request reconfirmation at any time.

3. Calculation of equipment monthly fee:

Equipment monthly fee = × Party A is divided into percentages in the current year

Where: m before = m after ÷

After m = lighting electricity bill for the month after installing the power saver

The lighting electricity fee for the month after the installation of the power saver is: the sum of all the electricity meters in the lighting circuit of the power saver that has been installed in the month.

Second, the payment method:

After the installation and commissioning of the power saver is completed, the total average power saving rate of the lighting reaches 15% or more. After the acceptance and acceptance meets the performance technical indicators promised by Party A, Party B will pay the equipment of Party A last month before the 10th of each month from the date of installation and commissioning. The monthly rental fee, the calculation method of the monthly rental fee, that is, the monthly electricity fee determined by the two parties, according to the third paragraph of Article 1 of this contract, Party B shall pay Party A on a monthly basis. The fee agreement between the parties is not affected by any factors and is paid on time. Party B will remit the payables to the designated account of Party A 10 days before each month, and pay ____________ years in a row. Party A will issue an ordinary invoice to Party B before the 3rd of each month to facilitate Party B's account.

Third, the equipment belongs to:

During the lease of the Power Saver contract, the ownership of the equipment belongs to Party A, the contract period ends, and the ownership of the equipment belongs to Party B.

Fourth, Party A promises:

1. Party A's products meet the national product quality requirements and technical standards. The service life of the product is XX years, and the power saver is freely repaired during the contract period. After the contract period of maintenance, the two sides also signed a warranty contract, the warranty fee is not more than 5% of the entire set of power saver saving electricity costs, the excess is responsible for Party A.

2. When the equipment fails, Party A guarantees to go to the site within 4 hours after being notified.

3. After signing the contract, Party A will complete the installation and commissioning of the power saver within _____ working days.

4. Responsible for the consultation and guidance on the use of ________ smart power saver.

5. Party B promises:

1. Payment to Party A on time according to the provisions of the contract shall not be delayed without undue delay, except for the failure of the delivery of Party A's invoice.

2. Provide the convenience of Party A installation and data testing. Provide real and accurate energy saving comparison data.

3. During the contract period, Party B shall be responsible for maintaining Party A's power saver from being damaged, damaged or stolen, otherwise the repair or loss shall be borne by Party B.

4. During the lease period of power-saving equipment, Party B shall properly keep the power-saving equipment. If the power-saving equipment is damaged due to non-quality defects, Party B shall bear the maintenance cost.

5. After the installation of the power saver, if the third party is personally injured due to the quality defects, Party B shall be liable for damages.

6. Liability for breach of contract:

1. Party B fails to pay the monthly equipment fee according to the contract. Overdue shall pay a penalty of 1% of the amount owed. If it is overdue for more than one month, Party A has the right to cancel the contract and remove the power-saving equipment. The power-saving equipment is in Party B. If Party B is damaged during use, Party B shall be liable for compensation. The monthly fee for equipment that Party B has paid before the cancellation of the contract will not be refunded.

2. If the product provided by Party A has inherent quality defects, and the quality problems of power-saving equipment cause personal injury to third party or loss of property of third party, Party B shall notify Party A in writing within 24 hours of the accident, and Party A shall promptly handle it. .

3. Arbitrarily unilaterally violate the provisions of the above-mentioned agreement, pursue the liability for breach of contract in accordance with relevant laws, and compensate the other party for all economic losses.

4. Party B will increase the load of the power saver without any permission, and cause damage to the power saver and other losses, all of which shall be borne by Party B.

Seven, after-sales service:

1. Establish customer files: According to the specifications of iso-9001 and maintain good reputation, Party A will establish customer files for Party B to track the use of equipment at any time, maintain the good state of energy-saving equipment operation, and at any time at the request of Party B. Make a sample test report.

2. Provide related functions and software upgrade services for products installed on Party B.

3. Party A shall provide 3 years free warranty service for the products from the date of the product is put into operation.

Eight, force majeure:

In the event of an uncontrollable event or situation, the party that suffered the event cannot perform the obligations stipulated in the agreement, and shall notify the other party in writing within 15 days, and the local government department or the notary office shall produce the certificate, and the parties may decide to continue to perform according to the specific circumstances. Contract, delay in performance of the contract or termination of the contract, so the losses incurred are each borne.

IX. Subsidiary files of the contract:

The power saving rate data tested in the first article of this contract is used as the subsidiary file of the contract, and is signed and sealed by both parties as the basis for settlement in the future.

X. Dispute resolution method:

Any dispute arising from or in connection with this contract shall be settled by negotiation between the two parties, and if the negotiation fails, the lawsuit may be filed in the court where the contract is signed.

XI. This contract is in two copies. Each of Party A and Party B shall hold one copy and shall become effective after being signed and sealed by both parties. In the case of unfinished matters, the parties sign a supplementary agreement after friendly consultations, and the supplementary agreement produced has the same legal effect as this agreement.

Party A: ________________ Industrial Development Co., Ltd. Party B:

Representative: Representative:

Year, month, day, month, day

recommended article

popular articles