Civil Engineering Internship Report


According to the school arrangement, I went to the Wuhan State-owned Enterprise Project Department of Wuhan No. 4 Construction Company on June 25, 2005 for a construction internship. This is a good opportunity for me to understand the construction site, let me further understand the difference between theory and practice.
One: project introduction
The project is a single apartment building developed by Wuhan Donghu Happy State Enterprise Investment Co., Ltd. The contractor is Wuhan No. 4 Construction Company, which is the No. 5 and No. 6 buildings, and the golf fitness building. The foundation is built by the fourth group of the company. . Designed by Beijing Weston Design Institute. The structural shear wall structure is adopted, and the columns are heterogeneous columns. The commercial and residential building consisting of 3 buildings with an area of ​​13,000 square meters has a six-story frame-cut structure of cast-in-place reinforced concrete.
Second internship content
1: Woodworking
1) Types of templates and methods of making them;
2) Quality standards for the installation of various structural templates;
3) Quality standards for the installation of cast-in-place structural formwork;
4) Time and sequence of removal of cast-in-place structural formwork;
5) Precautions for template removal;
6) Methods and requirements for cleaning, stacking and repairing the formwork;
2: Steel bar
1) the type and shape characteristics of the steel bars;
2) Welding method and quality requirements of steel bars;
3) Methods and techniques for cold working of steel bars;