Summary of work of oilfield drilling construction technicians


In the past year, under the care of the party organization and with the strong support of the team leaders, after working hard and hard work, I have made great progress in my work and further strengthened and improved my mind. But there are also shortcomings, but also the direction of their efforts.

First, continue to adhere to the positive progress in ideological and political. In April this year, he submitted an application for joining the party, and under the leadership of the party branch of the team, he actively participated in the spirit of learning various meetings, learned the theoretical knowledge of the party, opened up his own vision, and worked hard to raise the level of ideological and theoretical. By constantly transforming our own thinking, we will keep pace with the times and make ourselves move forward to joining the party activists and probationary party members.

Second, based on their posts, and strive to achieve results in ordinary posts. In the principle of non-separation of engineering geology, we strive to make contributions in ordinary posts. In the whole year, along with the comrades, they went to the oil fields in the oilfields, and achieved good results in geological and engineering work with strong sense of responsibility: the annual excellent rate of construction well data was 99.5%, and the success rate of operation was 99%, which was successfully completed. I have my own contracting indicators. At the same time, we used the spare time to assist our team technicians to complete the qualification identification and continuous clean production of the team.

Third, diligently digging business technology , carefully summed up, and strive to strive for excellence. In the side drilling construction, according to the progress of the construction, carefully do the drilling tool combination, diligently measure the drilling fluid performance, assist the vice captain to timely repair and maintain the equipment, adhere to the 24-hour duty, and ensure the successful completion of the sidetracking construction; Pump wells, first understand the design in detail, see what is the reason for the design of the pump, take the reason to the site inspection, find out the real reason, remove the factors affecting the production of the well before the pump, extend the pump inspection cycle; The process, to see if the design is reasonable, whether the information is wrong, record the key points and difficulties of the measures and the quality points and safety points of the corresponding processes, so that the whole well has a sense of integrity before the start of construction, so that the bamboo is in the chest. For the new technology and new technology , I will learn the theoretical knowledge, understand the structure and principle of the process, and ask the relevant experts to discuss the actual work flow on the site to avoid detours. The true 26-1 screw pump is a new process for us. After receiving the construction task of this well, I asked the experts to discuss the actual working program on the site, and set up production to successfully complete the construction task of the well. .

1. The production management capability is still very weak, mainly positioning itself in charge of technical control, and insufficient active participation; 2. Technical training for employees is not detailed and comprehensive. From the technical comparison, we can see that the overall technical skills of our team's employees There is still a certain gap with the better team; 3, the new technology and new technology promotion is not enough, mainly because the technical study is not enough, last year wrote a technical paper, but the quality is not high; 4, sometimes not enough at work Careful, mainly inexperienced. Therefore, in the new year, I will work hard to overcome the above deficiencies, actively do a good job in production and technical work, actively cooperate with the team leaders to do a good job in team management, strive to improve the comprehensive quality of employees, unite people's hearts, develop a team spirit and culture. Team market brand, strive for a broader market, and do a good job of sustainable development.

In short, in the future work, I must strive for excellence in the post, work hard with the comrades in the whole team to make a good job, and make more contributions, and make a due contribution to the development of the team and the operation department with a brand new look!

Leaders and colleagues:

Hello everyone!

In the past year, under the care and guidance of leaders at all levels, under the care of the party organizations and the strong support of all of you, I have worked hard and worked hard to meet high standards and strict requirements, optimize production and operation, and strictly enforce the qhse standard. To assist the team leader to do a good job in safety production, and successfully completed the various production and construction tasks assigned by the superior. The work in the past year is summarized from the following aspects.

First, Ideologically actively demand progress and strive to become a true party member as soon as possible.

Since I joined the work, I have been actively pursuing my ideas. I have studied the party’s line, principles, and policies through newspapers, magazines, and the Internet in my daily life and work, and brought the party’s new ideas, policies, and regulations. Go to work and guide production practices. Through continuous learning and understanding of party and government knowledge, the political beliefs have been further strengthened, and the level of ideological understanding has been further improved. On November 30, 2019, through the inspection of the party branch of the team, he became a probationary member. .

Second, do a good job of on-site standardization, change the scene dirty, chaotic, poor

With the continuous deepening of oilfield energy conservation and emission reduction and fine tube chemistry, the requirements for on-site construction are also being improved step by step, safety work is becoming more and more fine, and environmental protection work is becoming more and more strict. Current on-site construction requirements. I led everyone to learn the new standards while arranging the construction site. Admission requirements from entry to the construction site, team profile, safety warning sign, well site plan, eight bans on operation → access to hard line of wellhead pressure relief → placement of tools → placement of well site membrane and cofferdam → erection of well site wires They are all arranged according to the requirements of the new standard. Since September, our team insisted that every well was laid out with a new standardized site, which basically solved the phenomenon of dirty and messy scenes. Our achievements were also recognized by the leaders of the brigade and the department.

Third, meticulously organize production to ensure continuous production

As the vice captain, while doing a good job of safety work, we must actively organize production, coordinate and rationally deploy the team members, do a good job of planning the daily vehicles, connect each construction process, and strive to reduce non-production time and ensure Continuity of construction work. When the new well in Wells 7-28 was put into operation, in order to ensure uninterrupted construction, I communicated with the construction assistance unit in advance, and at the same time did their logistics support work. The construction of the well was completed two days in advance, and the well 106a was also secured. The moving process.

Fourth, diligently digging business technology , carefully summarizing, and strive to strive for excellence.

Our team is a composite team with overhaul, minor repair and sidetracking. The scope of contact construction is wide, and there are many technical knowledge points, especially sidetracking construction, many processes, and more equipment used. More points. When I was working on sidetracking, I was humbly learning the work experience from the teacher, while studying the technology and working with the masters to solve the problems in the work. I also knew from the unknown, from little to gradually mastered, gradually Enriched himself and explored a new method for replacing the mud pump with Verne and plunger rubber, which improved work efficiency and reduced labor intensity. Since I usually consulted the masters, and the team leader and the secretary spared no effort to guide me, my paper "Knowledge and Experience of Sidetracking Construction in Well 2-8" was won at the second grassroots technical exchange meeting. And other awards. Technical work summary

In the past year, I have earnestly fulfilled the duties of the deputy captain and worked hard to complete various construction tasks. However, there are still some shortcomings in the work: for example, the study of political theory is not deep enough, and the technical level and practical experience need to be further improved. The work of 2019 is intended to:

1. Further strengthen the study of political theory, strive to improve ideological consciousness, strive to turn positive in November, become a true party member, and take the lead in promoting the work and do a better job.

2. Work with the team leaders to update and implement various systems. People-oriented and good team stability, and strive to establish a team that is more civilized and harmonious.

3. Further strengthen the study of various technical knowledge, strive to make breakthroughs in side drilling mud technology , and make a contribution to the safety and smooth implementation of side drilling construction.

Leaders and experts:

good afternoon!

In XX, under the guidance of the leaders of the operation team and the engineers, the team consolidated the basic work of quality and technical management, and completed the construction of 31 pumping wells, 1 measuring well, 5 side drillings and 5 large repair wells. task. Especially in the special case of side drilling construction, the technicians insist on using the expertise of sidetracking before and after the shift, and explaining the construction points and safety requirements in combination with the downhole situation at the time. In addition to understanding the workload of the class, I have to do "four understands" when I am on duty. That is to understand the emergency plan for work; understand the technical requirements; understand the performance requirements of drilling fluids; understand the use of underground and ground tools. From the aspects of cost control, staff management, operation procedures, quality management, and safety production of sidetracking construction, we strive to cultivate the overall competitive advantage of the team in order to improve and standardize. At present, the overall quality of our team's employees has improved significantly. The operating procedures and operating standards have been further grasped.

Looking back on the work of this year, I feel that the achievements in the work are that the technical cadres of our team are constantly summing up from practice, constantly improving in the summary, paying special attention to the common discussion of the problems, analyzing the design and proposing their own ideas and treatment methods. From the selection of the optimized plan, the construction design analysis meeting, the construction meeting, the conclusion of the construction end, the successful experience, the lessons of failure carefully combed, accumulated experience, formed a habit. In the various types of construction, the oil well overhaul method is continuously explored to overcome the technical problems of oil well maintenance. In view of the particularity of the construction process, the technical staff of our team pays special attention to the summary of construction technology quality and control points, timely analyzes the difficult problems encountered in the construction, and explores successful experiences. For example, in the overhaul construction of the true 26-1 well, the overhaul task of ash, sand washing, well drilling and down pump was completed in only 4 days, and the construction task was completed 3 days ahead; the side drilling of the side sand 20-35 well In the middle, drill a 197-meter-hard rock layer, diabase, with a pdc drill bit. The daily footage is only 2-3 meters. If the problem is not solved as soon as possible, the drilling cycle will be extended indefinitely and the cost will be reduced. Sharply climbed. After careful analysis of the design, and then review the drilling well history data, we have selected five types of drill bits to try, and finally found a way to deal with the diabase, and decided to use the yc-537 drill bit. The problem was solved. The result was that after only 12 days, the "hard bones" was finally smashed. The drilling was completed in only 29 days, and two sidetracking records of 741 meters in the open hole of the single well and 1.6 meters in the target center were created. In the 3-1 side-drilling construction, due to the excessive torque during the drilling process, the drilling rod breaks down and the stuck-in event occurs. If not treated in time, the consequences are unimaginable. With the direct help of the leaders of the relevant departments and departments, after repeated research and demonstration, we adopted the diesel and plugging agent solution to solve the problem. It took only 51 hours to recover and solve the card successfully, and recovered the economic loss of 2 million yuan.

In the construction process of the new process, the technical staff of our team firmly studied the theoretical knowledge, understood the structure and principle of the process, and consulted the relevant experts on the actual work flow of the site to avoid detours. Yong 21 Ping 1 well is the first level well in Jiangsu Oilfield to implement ash drilling. The characteristics of this well are: long section and large slope, high requirements for various downhole tools and drilling tools, and difficult construction technology . The construction of the ash is a certain difficulty. The technicians of our team carefully analyze the well history, thoroughly understand the design, timely check the relevant information of the leveling and overhaul, and promptly ask the leaders of the workshop and the operation team, the engineers, and the ash on the site. The construction technical guidance solved the big problem of the difficulty of ash drilling construction in the leveling well, and initially explored that the single cone bit is more suitable for the leveling well ash. The true 26-1 screw pump is also a new process for us. After receiving the construction task of this well, the technical staff of our team consulted the brothers and asked the team to construct the actual working program. Production, successfully completed the construction tasks of the well.

Of course, we also have many shortcomings, and there have been many mistakes. For example, the maintenance operation period of the conventional operation well is long, the rework phenomenon occurs in the pump inspection operation, and the drill pipe inspection is not enough, resulting in the drill pipe appearing in the sidetrack drilling construction of the Hua 3-1 well. Broken accidents, etc.

Next, we will continue to be based on the care and correct guidance of the leaders and engineers of the brigade. Our technicians are based on the scene, establish the concept of lifelong learning, master the hard skills, resolutely implement the corporate standards, and do the quality management system according to the overhaul operation. Good work, our team's technical management work will start from the following aspects:

1. Strengthen the sense of responsibility, strictly perform the duties of the post, study hard, play the team spirit of the technicians for the complex construction, build our platform of learning, communication, training and teamwork, achieve the sharing of experience and technology , and jointly improve the level of problem solving.

2. Strengthen the check of the on-site design plan, as well as the on-site inspection of key processes, and pay close attention to the bottom, so that quality control does not leave a dead end.

3. Efforts to study and summarize, purposefully and purposefully cultivate their forward-looking construction plans and improve their ability to judge, analyze and solve problems.

4. Strengthen employee training and innovative training methods to ensure that business training achieves the desired results.

5. Strengthen the safety management of overhaul operations, actively participate in the hse management of the site, do a good job in risk assessment during construction, eliminate hidden dangers, and ensure that operations are carried out under the premise of safety.

Our team reported the report, and the leader and the experts criticized and corrected.

Leaders:

Hello everyone!

I have been a year since the National Life Conference in XX. Now I am still awake to remember the criticism and self-criticism of the leadership team of our team. What I am most impressed is the suggestions and hopes given by the leaders. . In order to change my own deficiencies and improve my own quality, at the beginning of this year, I made detailed plans for my own year-round work to guide my work in the past year. The details are as follows.

I. Strengthening political theory learning and raising ideological understanding

As a member of the Communist Youth League, I have further studied the party's line, principles, and policies while studying the charter of the group. I deeply understand the spirit of the party's 17th National Congress and regularly report to my party's party organizations about their work and life and make themselves The level of ideological understanding can be further improved, and I hope to join the party organization as soon as possible and contribute to the oil field.

Second, learn technology , experience, and strive to improve themselves

On the technical side, I worked hard to master the conventional well operation technology , and further studied our team's unique sidetracking technology . This year, our team completed a total of six side drilling. In the sidetracking construction of these six wells, I learned the whole process of the side drilling construction in detail, and further mastered the technology to deal with the complex conditions of the well , and I also drilled the drilling fluid. Further understanding of the deployment and maintenance technology .

Third, try to organize production and management

In April of this year, due to the needs of the external market, our team's vice captain, Comrade Mao Chuanrong, was borrowed, and the burden of production and safety was also on the shoulders of the Zhang team. At this time, I was also responsible for organizing production while being responsible for on-site technology . Actively share the responsibility of organizing production and safety management for the captain. During the construction of the side drilling, I insisted on eating and living in the well site every day, rationally arranging the team members, doing the daily vehicle planning, connecting each construction process, and striving to reduce the non-production time. I regularly inspect the safety work in the team, and urge the team to strictly implement the handover system and the pre-class after-school system, and strictly implement standardized construction so that production can be carried out in a safe and orderly manner.

In the past year, through the continuous efforts and continuous learning in my work, my progress has been affirmed by the team leaders. In December of this year, I was fortunate enough to be recommended as the vice captain of our team. I will live up to my hard work and live up to my leadership over the past three years.

Of course, there are still some shortcomings in the work: for example, the study of political theory is not deep enough, and the technical level and practical experience need to be further improved. In the future work, I will continue to strengthen my study, make timely summaries, and strive to further improve my own standards.

Technical work summary