Work Summary > Summary of Training Work

Engineering quality inspection staff training summary


After a few days of study, I not only gained valuable knowledge, but also learned a kind of work spirit. The spirit of the inspection team will always inspire me silently. They are my role models. In this study, we have studied engineering management, equipment management, material management, receiver training, labor training, quality management, financial management, safety management, construction staff training, party affairs and honest government construction, party class learning, and total Some systems of the company. I am a new intern. I always feel that I am very unfamiliar with this and the knowledge is not consistent. Now, after listening to it, I suddenly have a big improvement. Thanks to the head office for organizing such learning, let me enter faster. The role of work.
First learned the project management:
After the project is awarded, the following preparations must be made. 1. Drawing review 2, plan drawing 3. Production value planning 4. Implementing construction organization design 5. Determine the number of construction teams according to the number of construction sections. 6. Complete the labor office and equipment plan according to the construction progress plan. Materials, etc. 7. Determination of the unit price of the process 8. Determination of the unit price of the project 9. Project economic estimation 10. Target cost measurement 11. According to the construction schedule, the construction task list has some key points: after the project wins the bid, the engineering department is based on the construction. The division of paragraphs and the review of the amount of engineering work to prepare the construction plan. The schematic image of the construction project was compiled by the engineering organization personnel within one month after receiving the notice of winning the bid. It is one of the primary completions after the project has won the bid. For the subgrade bridge and culvert project, the contents marked above the central axis of the construction plan are: the position and structure of the bridge and culvert structure, the amount of concrete in the prefabrication field and the number of main works of the beam and slab; the contents marked below the central axis are: two backs The number of works in the construction section and the unit price of the project were searched.
The above is just some general information. I am very interested in the engineering knowledge. So after listening to the detailed lectures of Zheng Xiaomei’s lecturer, I have understood the basic process and work content of the engineering department, and it has also eliminated the confusion accumulated during my internship. I am very grateful to Zheng Jie for preparing such a wonderful and detailed learning opportunity, and I will study it further.
Next, we continued to learn other departments. I basically mastered their rules and regulations and some programs. There are also relationships and connections between some departments. This study opened my eyes and made me really understand. The project is huge and significant. I feel very fulfilled in a few days. I think the difference between the things I learned at school is great. I will seriously study the work procedures and knowledge of each department, speed up the pace of keeping up with the company, and strive to be a good employee in the interests of the company.
Finally, the xx manager gave lectures, listening to her powerful voice, and my heart couldn't help but admire it. The story that lasted for several hours was never too small. It persisted until the end. It was this kind of spirit that infected me and motivated me. I, why don't I want to have such a spirit? I want to reflect on myself. I want to thank the company, thank the teacher, and let my dreams have a solid wing.
Mainly telling us, we must adhere to the learning system, adhere to the "three sessions and one lesson", hold quarterly democratic life meetings, strengthen the party's work style and clean government, etc., especially the construction of clean government, I have learned more deeply, I have stepped into Society, at any time will be in contact with the integrity of the government, I am so lucky, this is called precaution, so I carefully do every note, so that the construction of a clean government is unforgettable, especially as a Communist Party member, I must be more strict, I am always vigilant corruption.
After a few days of study, I really benefited a lot. I sighed from my heart. Then I have to review myself: As a knowledgeable and cultural youth, we should have a very High consciousness, but not so, I am very self-blaming. This training has had a great impact on me. I have been well aware of my shortcomings. I must do the following in the future:
To strengthen study, we must use all available time and opportunities to learn from books, learn from old comrades, and practice; to be cautious and cautious, to establish a correct view of power, status, and interests, and to serve the people wholeheartedly. As a self-important pursuit and an unshirkable responsibility, it is really doing things for the people and doing good things. Treat the people with their sincerity and true feelings, and they must endure hardships and enjoy the aftermath. They must always be "indifferent to the sake of peace and tranquility and far-reaching", "not to be happy with things, not to be sad", to be free and easy, and to be calm; I often self-reflecting, perfecting myself all the time, pursuing perfection; demanding truth and being pragmatic, working hard, based on my job, working hard, making progress, doing business, and doing practical work, we must pay attention to detail and work in the work. Practical, accurate, strict, exquisite, stressful, and fast, striving for first-class work performance. Don't let the head office down, don't let Liu manager regret it, and don't worry parents. Thanks to Manager Liu for giving us the opportunity, we will try to double!

recommended article

popular articles