Work summary > Sales work summary

Sales month work summary essay


I. Implementation of the monthly operation plan and daily maintenance According to the operation plan, the 31st office second floor exchange and the first floor data room are cleaned regularly, and the charter equipment is routinely maintained, checked, and inspected and inspected.

Second, business opening and processing

1. Adjust gw19 to 3rd floor 31 switch 2m 2;

2. Configure Dongshao a csm;

3, Qufu, Lishui gateway cutover and ip trunk open;

4, Jiaxiang, Yutai gateway cutover and ip trunk opened;

5, Liangshan, Wenshang ip trunk opened;

6. PHS roaming signaling link configuration;

7. Configuration of roaming service number and terminal number;

8. Testing of roaming services, including Lucent 4 cities and ZTE 5 cities;

9. Handling the meteorological scheduled deduction fee from the telephone information center;

10. Opened 5.89 million groups of Zoucheng;

11. According to the network management No. 61, open the 6.16 million group;

Third, the obstacle handling

1, gw1 - 21lstp a link down, after inspection, found that there is a complex wiring, the complex wiring is removed and returned to normal;

2. On April 3, the mains supply was interrupted, and multiple pdp alarms appeared on the second floor of the computer room. After the alarm was cleared, the status of each server was checked. The relevant items of gw were checked normally, but the circuit was blocked by gw5 to 21. The circuit is blocked/unblocked, the hard block/recovery is still invalid, and Feng Dianying is notified to return to normal after the opposite end restarts the circuit;

3, handling 31 stations Alcatel / center adsl connection 埠 failure 5;

4, Cangzhou one controller csc8-37 connection is not available, the controller can not call, check the first 2m unstable, due to the handover of the second floor to the fifth floor, and re-winding after recovery;

5, PHS automatically stops booting and hangs, restarts the isap process to recover;

6, the handling of the fish platform PHS gw1 to the fish ewsd no fault, for the period of 2 2m cross, caused by correction;

7. After the prepaid user of the fish station pays the fee, it still indicates that the arrears are down, and the switching gateway is restored;

8, deal with Jiaxiang csc14-31 failure together, the network management is normal, but can not call, for signalling hang, resume after recovery;