In the blink of an eye, the five-week internship ended. The construction site of my internship was the construction site of the faculty and staff dormitory building of Guangxi University of Technology. I followed the arrangement of the graduation design instructor Ge Xinguang and went to the 29# building for an internship. It was built by Liuzhou Construction Group Corporation. I have benefited a lot from this internship at this site, which has enabled us to master more theoretical knowledge about architecture. Theory and practice are closely related. This internship gave me a good understanding of practical ability and theory. Knowledge is fully integrated into work practice, and I am better trained in actual work.

As a college student who is about to graduate, it is necessary to learn the theoretical knowledge of professional courses. After that, practical learning should be more important and necessary, and more scientific. For this reason, we are very serious about this graduation. Internship also allows us to gain a deeper rational understanding of this upcoming profession from practice and lay a solid foundation for professional learning and work in the future.

The masters here are very good. We have problems. They will patiently explain to us. Every day, we will teach us on the construction site and tell us about the safety of on-site construction. At the beginning, we all felt very fresh. When I first arrived, I treated my own feelings with a beginner's attitude. We started construction here, from looking at the construction of the map to the tying of the foundation steel and pouring concrete, etc., we all recorded what we saw and heard in the log. Every day I look forward to seeing new things to satisfy my curiosity. The first thing we have to understand at the construction site is to look at the drawings, but we have hardly touched the real construction drawings when we were at school. For this reason, we have encountered many problems on the drawings. Fortunately, the masters can be patient. Tell us about it and also accumulated a lot of experience and knowledge.

First, I learned about the foundation and installation of the tower crane. The location of the tower crane is based on the structural shape of the building, and considering the removal of the tower crane, the location is basically consistent with the floor plan of the construction site. The sling of the foundation pit of the tower crane should be tied according to the construction drawing. It should be tied at the site. After the binding, it should be inspected according to the construction drawing, and submitted to the supervisor for acceptance. After passing the test, it can be poured. Before the pouring, the bolts of the tower crane must be embedded in place. The wire ends of the bolts are coated with butter and then wrapped in paper for installation. The installation procedure of the tower crane is: fixed tower crane foundation → installation tower crane standard section to 20M → hoisting tower cap turntable and cab → tower crane balance arm hoist, backup electric box → first lifting a weight block → lifting jib boom support system → Lift the remaining two weights to wrap around the rope system → check the mechanical parts of the machine, structural wiring parts, electrical parts, etc. → adjust the safety protection devices → test the vehicle.

During this period, I also learned a lot in the data room. The data room has information about the construction plan of the project. Some construction plans also have some understanding. The general construction organization design should include preparation instructions, project overview, construction organization, on-site general layout plan, construction plan, quality assurance measures, safety assurance measures, construction progress plan, and construction period guarantee measures. , labor arrangements, mechanical equipment and civilized construction measures. As a management personnel, not only must the construction organization design be compiled, but also the construction organization design should be used for project management. Construction organization design is an important basis for construction management. Some of the words of the sisters in the data room made me deeply remember that I must be a informant. I must understand the construction sequence, be familiar with the construction process, master the construction quality and progress, and be familiar with the construction project. The unified standards for construction quality acceptance and the specifications for the construction acceptance of all relevant professional projects shall be good at collecting and accumulating the “blank table” of various carriers, and the ability to collect, edit and organize materials will be enriched over time.

Secondly, there is some understanding of concrete engineering. The quality of concrete is not only good for the safety of structures, but also for the cost of structures. Therefore, we must pay enough attention to the construction quality of concrete during construction. Job preparation:

Before pouring, the garbage, dirt and other debris in the formwork and the oil on the steel bars should be cleaned up, and the cement blocks of the steel bars should be inspected. If the wood formwork is used, watering should be used to wet the formwork. The high level of the cleansing port of the column formwork is sealed after removing the sundries.

Pouring and curing of concrete

Concrete pouring is carried directly from the mixing plant and poured. Then pay attention to the early curing of concrete, the purpose is to maintain suitable temperature and humidity conditions, in order to achieve two effects: on the one hand to protect the concrete from adverse temperature and humidity deformation, to prevent harmful cold shrinkage and shrinkage . On the other hand, the cement hydration is carried out smoothly in order to achieve the design strength and crack resistance. Theoretically, the water content in the newly poured concrete can fully meet the requirements of cement hydration. However, due to evaporation and other reasons often cause water loss, thereby delaying or hindering the hydration of cement, surface concrete is the easiest and directly affected by this adverse effect. Therefore, the first few days after concrete pouring is a critical period of maintenance, and should be paid attention to during construction. Therefore, we must be cautious in handling these events during construction, depending on the situation. These problems are all noticed in the construction work. What kind of cement is used in the construction, the amount should be paid attention to, and the early maintenance of the concrete. In the process of following the master's inspection of the construction site, I also learned about other pouring such as column and slab slabs, lashing of steel bars, etc., and the problems encountered in the inspections are also opportunities for me to learn. When I took the drawings against the scene, there were a lot of unimaginable structural arrangements. For example, about the hanging ribs, although it was seen more than once from the textbook and course design, it was not until I saw it that I understood what it was. When I first discovered the hanging ribs, I was excited to look for it at the intersection of each primary and secondary beam until I really understood it. On the construction operation surface, I got to know the real structure of the structure, and I saw the work of steel bars, woodworkers, welders, etc. I first understood the laying, lashing, welding and support and disassembly of the steel bars, and the connection of the vertical steel bars. The use of electroslag pressure welding is the first time I have seen it. The lashing of the steel bars and the tying of the underlying foundation steel bars are first to be staked out. The number of joints of the steel bars in each span is only 25%, that is, there is only one joint in the four steel bars. In addition, the joints should be placed in the pressure zone as much as possible.

After a period of internship at the construction site, I realized that it was not the textbook middle school that couldn’t be used, but whether you would use it or not, and you couldn’t understand the changes and the opposites. The more serious problems in this internship are as follows: Question 1: The theoretical knowledge is not solid enough, for example: the curing time of concrete and mortar test blocks, the degree to which the test blocks should be vibrated, and the concrete after pouring Curing temperature, curing time, and other reasons for cracks in concrete can not be analyzed. These concepts are very vague. I used them in the internship to know that I didn't learn well. I only tried to cope with the exams in order to pass the exam. Only in the days before the exam, I reported to the teacher about the key points of the rote, several times, first-class exams. In the past, there was a blank in my mind, and it disappeared in memory no matter whether it was used or not. When you need it, you know that you haven't remembered it. Just like you don't have to ask you at the construction site now, but as a technician, you don't know how to repair the test block, what is the cause of the crack in the concrete, and so on. How can we guide the construction? The solution to this problem will be solidly grasped in the future study, and it will be used flexibly and in combination with practice.

Question 2: The ability to be familiar with drawings is poor, and the plane graphics cannot be imagined as stereoscopic. It is impossible to clearly determine the right or wrong of the construction.

Question 3: I don't know about the latest construction specifications, so I can't judge the right or wrong construction quickly. Question 4: Some construction orders are still unclear, and the operation of each construction process is not known. Question 5: The ability of theory to connect with reality is poor. There is too little new understanding of the building. Question 6: The actual elevation and design elevation are easily confused when calculating the construction elevation. Through this internship, I gained a deeper understanding of the relevant knowledge of engineering. It should be said that learning more professional knowledge at school is only theoretical, and it is still somewhat different from reality. This internship has a certain help to my ability to understand the map. I know where to pay attention to the map and carefully calculate it. Where should I consider the safety of the construction? It also enabled me to obtain practical knowledge on construction project management and construction drawing budget. Under the leadership of engineering and technical personnel, I learned their excellent quality by participating in practical work and labor. Because it is an all-weather construction internship, it thoroughly tested me. Ability in all aspects: study, life, psychology, body, thought, etc. It also realizes diligence in practice, combines the theoretical knowledge and practice that has been learned, continues to learn in practice, constantly summarizes, gradually perfects, innovates, and improves in practice by the integration of knowledge, ability, wisdom and other factors. The comprehensive quality and ability requirements have laid a good foundation for the success of their own career. Although the construction site is bitter, it is something practical to learn. It is the practical ability to solve problems. It is all worthwhile.

Part 2: Summary of civil engineering internship

The short graduation internship soon ended. During the production internship, under the leadership of professional teachers, with the help of the workers and engineers at the internship site, I was puzzled and confused about the professional knowledge that emerged during the internship process. I consulted and studied with them. Through this internship, I have gained a lot of income. I not only learned a lot of professional knowledge, but also learned a lot of truths from the seniors of construction workers. Now I will summarize the experience of the internship as follows:

Since we did this internship after all the professional courses have been completed, this internship is more targeted and practical than any previous internship. After completing the courses of basic engineering, concrete structural engineering, seismic structure, steel structure, high-rise building structure and civil engineering construction, I started the internship. Through this internship, I have more fully understood the professional knowledge and learning, and in the future. Better mastery and use of professional skills in work and study.

First of all, this graduation internship has given me a deeper understanding of civil engineering expertise. After four years of studying professional basic courses and professional courses, the university has gradually acquired more solid professional knowledge, but the content learned during the school is theoretical knowledge. In addition to the course recognition knowledge and holiday professional internship, study in practice And the use of learned theoretical knowledge is far from enough. Through this internship, I have a correct understanding of the problems and deficiencies in previous studies and internships. For example, during the internship, we found that according to the functional requirements of the building, the thickness of the slab and the cross-section of the beam and column indicated on many design drawings are much larger. How do we fully consider the stress situation and select the calculation model? Through this internship, I am According to the design drawings and the measurement of some components on the construction site and the detailed methods of observing these components, the treatment methods for the cleaning of related problems to the construction workers and engineers, analysis of ideas and calculation principles, so that I have a new understanding of the previous professional curriculum knowledge . The knowledge of previous textbooks is the most basic content of civil engineering, and the models and principles used are the simplest types. However, with the increasingly standardized and complete construction industry in China and the higher requirements of the people for building safety, rationality and economy, it is easy to have various problems and doubts in the project. How to deal with these problems quickly and correctly? I think, then It is to use the knowledge and principles we have learned to find out the “bottleneck” based on the problem and find a breakthrough to solve it. In fact, many of these basic knowledge and principles have been learned, but how to connect them to solve practical problems in and, engineering, we need to continue to learn and summarize in practice.

The other side of "learning to use" is "seeing big and small". A lot of knowledge and principles are often the key to solving problems. For example, when we were internship in the high-rise residential building of Guangxi Administration for Industry and Commerce, I was very puzzled by the basic static pressure pile method and bolt fixing treatment scheme, because static pressure piles have higher economic costs than cast-in-place concrete piles. Therefore, I suspect that the foundation of the project is weak or the sand is serious. I have been affirmed by the project leader. After learning the basic project, I always remember that the instructor told us that if the bearing capacity of the foundation meets the requirements, the static pressure pile should be used as little as possible. The static pressure pile is time-consuming and costly. This is the small reason that allowed me to produce the above. Problems and doubts. Some problems seem complicated, but changing angles or thinking differently may be much simpler. For example, most of our internship projects are high-rise buildings, and most of them use frame structure. The number of layers is about 20 layers. However, their calculation principles and models are very simple. They all start from the framework structure and use layering. The method divides the moment into layers on each layer frame, and finally stacks the axial force, shear force and bending moment of each layer layer by layer. Although the calculation amount is large, the principle is the same. It can be said that it is the same, so in addition to applying what you have learned in engineering, you should also pay attention to flexibility, mastery and use of seemingly simple principles and methods. From a small point to a subtle point of view, taking into account the overall situation, you will be better able to Solve the problem.

Secondly, through this graduation internship, I am more aware of the importance of construction management. Whether it is designing or construction or supervision, we should focus on improving construction management efficiency. The engineering units of this graduation internship, their advanced management concepts and methods are worth learning.

Civil engineering construction management should consider a lot of content, a wide range, and a larger amount of work tasks to be arranged, but this is directly related to the progress and efficiency of civil engineering. The most impressed high-rise residential building project of the Guangxi Administration for Industry and Commerce, which was built by the Wujian Building in Guangxu District, so the staff performed their duties and the work was carried out in an orderly manner. The workers were busy but orderly on the construction site, and the construction workers, The safety officer and the supervisor are also step by step at the construction site, and the construction work efficiency is carefully improved to the best, while the project engineering person in charge is on the site. Therefore, all work is underway.

In addition, the construction management also includes the skills training of the employees. In the internship of the residential building project of the Party Committee of the Party Committee of GuangXX District, which was built by the Second Construction Office of GuangXX District, I learned that the second construction will regularly strengthen the training and training of the construction workers and technicians. The project manager introduced us to a series of training plans and contents for the second-person staff in the XX district, which made me think more about construction management and training. Through the introduction of advanced management models and scientific management methods, the construction efficiency has been greatly improved, which is very helpful to the continuity and continuity of construction.

Finally, through this graduation internship, I have more fully understood the direction of future efforts. In fact, it is really difficult to learn more knowledge and skills in such a short graduation internship. However, during these days of graduation internships, I have recognized the direction of the efforts required for civil engineering work in the future from a more comprehensive perspective. As many teachers and workers in the internship said: "Working in civil engineering after graduation requires modesty and learning."

Indeed, after graduating from college to a new job, we are faced with a blank piece of paper, everything is new, and everything is waiting for us to work hard. Therefore, in the face of so many seniors who have been engaged in civil engineering for a long time, their work experience is more abundant than ours. The knowledge is more solid than ours. The knowledge is more profound than ours. We only have the patience to humbly ask them to learn, we will have more. Great progress will make us gain more in the difficult and challenging work of civil engineering.

In addition, in this graduation internship, I also found out that there are deficiencies and shortcomings, mainly in the following three points:

First, the mastery of professional knowledge is not comprehensive. Despite the serious study of professional knowledge in the university, the current knowledge is not wide enough, and it is not easy to do civil engineering work. Therefore, although I am about to start a job, I should regard the work I do as a new study. The beginning, just learning in practice, will acquire more professional knowledge and skills.

Second, the professional practice experience is far from rich. Due to the lack of professional internship time in the past, it is difficult to apply the knowledge learned and practice, and the experience gained through practice is a shortage. Therefore, in the future, we must seize the opportunity to learn from the civil engineering workers masters at the same time. At the same time, we must change the learning methods and attitudes, change the passive absorption learning methods that rely too much on teachers in the past, and actively learn from others and ask for advice. At the same time, strengthen self-learning ability and master the ability to solve problems.

Third, the use of professional knowledge in engineering is not flexible enough. Through this graduation internship, I really feel that the professional knowledge I have learned before is not flexible. This is mainly because the knowledge acquired has not formed a complete system. These scattered knowledge points are difficult to apply. Therefore, in the future, we should pay attention to accumulation and application in learning and practice, so that the knowledge we have learned will change from quantitative to qualitative. Play a greater guiding role.

After a period of internship at the construction site, I realized that it was not the textbook middle school that couldn’t be used, but whether you would use it or not, and you couldn’t understand the changes and the opposites. The more serious problems in this internship are as follows:

Problem 1: The theoretical knowledge is not solid enough, for example: the curing time of concrete and mortar test blocks, the degree to which the test block should be vibrated, the curing temperature and curing time after concrete pouring, and the crack analysis of concrete Reasons and so on. These concepts are very vague. I used them in the internship to know that I didn't learn well. I only tried to cope with the exams in order to pass the exam. Only in the days before the exam, I reported to the teacher about the key points of the rote, several times, first-class exams. In the past, there was a blank in my mind, and it disappeared in memory no matter whether it was used or not. When you need it, you know that you haven't remembered it. Just like you don't have to ask you at the construction site now, but as a technician, you don't know how to repair the test block, what is the cause of the crack in the concrete, and so on. How can we guide the construction? The solution to this problem will be solidly grasped in the future study, and it will be used flexibly and in combination with practice.

Question 2: The ability to be familiar with drawings is poor, and the plane graphics cannot be imagined as stereoscopic. It is impossible to clearly determine the right or wrong of the construction.

Question 3: I don't know about the latest construction specifications, so I can't judge the right or wrong construction quickly. Question 4: Some construction orders are still unclear, and the operation of each construction process is not known. Question 5: The ability of theory to connect with reality is poor. There is too little new understanding of the building. Question 6: The actual elevation and design elevation are easily confused when calculating the construction elevation.

Graduation internship soon came to an end, but through this short internship, it should be said that learning more professional knowledge at school is only theoretical, and it is still somewhat different from reality. This internship has a certain help to my ability to understand the map. I know where to pay attention to the map and carefully calculate it. Where should I consider the safety of the construction? It also enabled me to obtain practical knowledge on construction project management and construction drawing budget. Under the leadership of engineering and technical personnel, I learned their excellent quality by participating in practical work and labor. Because it is an all-weather construction internship, it thoroughly tested me. Ability in all aspects: study, life, psychology, body, thought, etc. It also realizes diligence in practice, combines the theoretical knowledge and practice that has been learned, continues to learn in practice, constantly summarizes, gradually perfects, innovates, and improves in practice by the integration of knowledge, ability, wisdom and other factors. The comprehensive quality and ability requirements have laid a good foundation for the success of their own career. Although the construction site is bitter, it is something practical to learn. It is the practical ability to solve problems. It is all worthwhile. I have learned only a lot of knowledge that I had not learned in the textbooks. These new gains will have more practical guidance for our ongoing graduation design preparation work and the upcoming work.

Part 3: Summary of civil engineering internship

The junior year is over. I have been very fulfilling this year. I started our internship during the summer, and I have more experience of internships that I have not had in the past summer. I arrived at the construction site early in the morning on July 10. After that, I followed the construction workers to work at the construction site. Because of the higher temperature this summer than in previous years, it has brought great inconvenience to our construction. We can only pass Make up in the morning and evening. The tasks of our interns are basically to help the construction workers to put the line, copy, level the line, etc. It sounds simple, but it is not easy to really do these tasks well. To be a construction worker, you must first be afraid of suffering, not afraid of dirty, not afraid of tiredness, and you must be able to withstand heat in this hot summer. In this respect, I saw a lot from the construction workers on the construction site and learned a lot. After more than three months of internship, I saw the simplicity of the people at the construction site. Under the management of the construction workers, the migrant workers were doing their work in an orderly and unrequited manner. The construction workers were also very good to me. If they don't understand anything, they will explain it to me seriously.

As a college student who has just come into contact with professional knowledge, it is unscientific to directly contact esoteric professional knowledge before studying professional courses. It will lay a solid foundation for the future study of professional courses and lay the foundation for the future combination of books and practice. And in this internship, I have a more realistic understanding of the responsibilities and roles of all parties in the construction project, and deeply understand the various contradictions, various limitations, and various practical problems involved in the construction of the project; Hard work, and the ingenuity and practicality of the various techniques in their actual construction. For example, the lashing of steel bars and the tying of the underlying foundation steel bars must first be staked out. The number of joints of the steel bars in each span is only 25%, that is, only 4 steel bars are included. One joint, in addition, the joint should be placed in the compression zone as much as possible. In the process of building a wall, if the wall is to be cornered or intersected, the two walls should be built together. In the process of staying, you can leave the slanting squat. If you want to stay straight, you must leave the yang, and you must There is a tie-bar, and you can't leave a haze. In the process of concrete construction, pay special attention to the mix ratio of concrete, pay attention to maintenance in the hot weather. Binding steel bars, I am afraid this is the most problematic. When the steel bars are the soul of the construction project, we have to pay special attention. As the main supporting material, if it can not be in accordance with the design specifications, it is the hero's place. These problems are mainly caused by uneven spacing of the steel bars, or some are not designed according to the design. Originally, the pitch was incorrectly cm, and it was 20 cm when it was checked several times. Only a few steel bars were added under the supervision of the supervisor. Secondly, the hooks of the steel bars are often not standard enough, and the discounts are specified on the standard atlas. Another time was when the balcony reinforcement was tied, the main rib was actually a dozen centimeters less, and the construction party was ordered to lengthen it. There is still a problem that the pad is not enough and the horse is not enough. This problem has not happened once or twice, but it has been said this time, but it has to be said the next time. Sometimes it is not that these workers will not work. In fact, they did not take this work for a while, it is a matter of attitude. . This is the inspection of steel bars, and the steel bar inspection passed the construction team to pour the concrete.

The other is to pour the concrete. It is a time-consuming and laborious task to pour the concrete. Since the concrete is always in the evening, I rarely see it, but it started from the afternoon several times, so I often and Lao Wang supervisor went upstairs to see some. Before the concrete is poured, the template and the debris between the steel bars must be removed, and it should be washed with water, but I have not done this for the first time. When pouring concrete, it is necessary to lay a layer of fine mortar of 50 cm to one meter thick on the bottom layer, but this is relentlessly ignored by the construction team. These procedures are of course troublesome, but it has become neglected by them. The biggest reason, they have to hurry, so all the troublesome and less important details have been passed.

Finally, the brick wall is built. The master of the brick wall is the best I have done. The simple craft is on the one hand, and the master craftsmanship of these brick walls still sounds good. Every time and a few supervisors rely on the ruler to lean against the wall, we can satisfy us. This can't hide their defects in some aspects. The length of the ribs was originally about one meter two outside the wall, but at the time of an inspection, the length was only seventy, far less than the specified length. Moreover, according to the regulations, two ribs are pressed every four layers of bricks, but the fact is always uneven pressure. Some are three layers and five layers, which are uneven. It is really impossible to say that it is actually caused by work.

Civil engineering is the general term for the disciplines, technologies and engineering of various types of engineering facilities. Civil engineering is one of the pioneers of “clothing, food, housing and travel” required for social and technological development; it plays a pivotal role in the national economy of any country. What I saw and heard on the construction site has inspired my love and enthusiasm for this profession. I also deeply understand that it is necessary to make more efforts to make a difference in the construction industry, not only in theory but also in practice. The application.

Through this internship, I also learned how to respect others, especially the workers. Although the production internship is very short, I have not only learned a lot of construction techniques, basic knowledge of engineering management, but also learned some common sense of supervision profession, and often go deep into the construction site to study at the front line of construction, theory and In combination with practice, in a few days, personal ability has been improved. During the internship process, I deeply realized the importance of team spirit, learned to integrate better into the team, relied on the strength of the team, solved the difficulties, and each person's carelessness and carelessness may directly affect the progress of the project, even It is a loss that cannot be compensated for in a lifetime. During the internship, I realized the importance of interpersonal communication. Each group is like a big family. If you encounter problems, you will solve the wisdom of everyone together. Although sometimes we will be red-faced because of some of our own internships, but everyone is thinking about the completion of this time. The internship is more perfect. In the future study, internship, and work, I will continue to improve my professional ability, learn to get along with my peers, and learn to be tolerant. The production internship has ended so successfully. Now, in retrospect, the harvest is not small. The most important thing in interpersonal communication is to learn to respect others. Both frontline workers and project managers have to be humble, and secondly, they must actively communicate with themselves. The idea, in order to correct the misunderstanding in the first time, the first time to contact the latest situation, and lay a solid foundation for professionalism.

The days of internship have passed by, but these memories will remain deeply in my heart. During this time, I not only learned and practiced a lot of professional knowledge, but the time was short but the inspiration for me was great. Exposure to the first line of construction not only allowed me to understand the construction techniques of the construction site, but also met a variety of technical personnel and learned the practical knowledge that was not introduced in the book. Not only did I feel the greatness of practice, but it also made me realize the necessity of learning theoretical knowledge. From the theory and then back to the theory, this is also the harvest of the internship. During the senior year, I was learning the process of professional knowledge. I also realized the importance of this knowledge. Because the knowledge of books is even on paper, if you don’t have the hard work on paper, you can hope to fight with the air. So these Learning is necessary not only the cornerstone, but also a springboard for your future development and progress.

In short, the short internship has opened my eyes and learned a lot of things, and also made me think about the industry I want to work in the future. The original kind of arrogance is gone, replaced by the determination and confidence of down-to-earth hard work and study. When I set my own mentality, from the passive state of social work to the active state of adapting to society, with a relaxed mood and plenty of energy to return to the intense study work, I suddenly felt this way. In just two weeks, it seems that the thought has been sublimated again, and there is another sentiment in life.

This internship made me realize that reading is a way to broaden my horizons of knowledge, but there are more practices, smooth contact with practical work in practice, touching the pulse of society, and setting a position for myself is also an excellent improvement. The choice of their own comprehensive quality. I hope that my experience and experience will guide me to success in the future. The world outside is very exciting, but it is wonderful to be someone else without strength, not that you are someone else's wonderful. In the end, what I want to talk about is the issue of responsibility. In fact, the construction industry is a conscience industry. We don’t want to participate in the construction project. The building is upside down and the building is crunchy. Therefore, a sense of responsibility and a sense of justice have been generated by responsibility. The more people like us, the better our city will be, so don't make the slogan simple and slogan, it should be the belief of everyone, and it will take a lifetime to do it. Nothing more arrogant announcements is better than burying our heads to work seriously. Every one of our engineering staff must remember their mission, remember the responsibility on their shoulders, and remember that the house where they built the house is alive. It is not the grave of the living person. During the internship, I really ate a lot of hardships, but now I don’t think about it. I learned something that I couldn’t learn in class at the construction site. It’s not only professional knowledge, but also social experience. Take the first step in social integration.

Although our internship is over, our study is still going on!