This article directory 1 construction internship summary 2 construction internship summary 3 construction internship summary Section 1: construction internship summary

The production internship time is from February 25, 2019 to May 23, 2019. The internship location is the Ward Dream Project Department. Mainly with the construction workers to the scene to participate in practice.

Project Description: The total construction area of ​​the 1# building of the project is 40,830 m2, the building area of ​​the basement is 2,876.08 m2, the ground is divided into 3 units, and the building area is 30,953.56 m2. One of the above-ground 27-story building height is 79.90 m, and the second unit is 18-storey. 54.30m, the height of the 23-story building on the three-unit ground is 68.70m. The structure type is frame-supported shear wall structure with a height of 2.8 meters. The seismic rating of this project is 6 degree seismic fortification. The design elevation of ±0.000 is equivalent to an absolute elevation of 92.0m. 2# The total construction area of ​​the building is 22300.56m2, and the structure type is frame-supported shear wall structure. The next 2 floors and 25 floors above ground. Internship content: 1Understand the project's project overview, civil labor configuration, mechanical configuration, etc.; 2 learn to follow the drawings after understanding the drawings; 3 learn and master the construction techniques of formwork engineering, steel engineering and concrete engineering; 4 learn and master the masonry Construction technology and acceptance criteria of the project; 5 learn and master the construction method of manual digging piles; 6 learn the construction organization and organization construction harvest and experience: First of all, the internship is a familiar and unfamiliar word for me, because I am ten I have also experienced internships for a few years, but this time it is so different. He will comprehensively test my ability in all aspects: study, life, psychology, body, thought and so on. It is like a touchstone to test whether I can apply the theoretical knowledge I have learned in practice. It is also the key to building confidence in my future whether I can successfully settle in this challenging society. Therefore, my investment in it is also 100%! The tense month of internship life is over, in this month I still have a lot of gains. It is necessary to sum up after the internship. First of all, through more than a month of internship, through practice, I learned a lot of practical knowledge. The so-called practice is the only criterion for testing the truth. Through the side station, I have observed the construction process of the whole house from a close distance, and learned a lot of concrete construction knowledge that is very applicable. This knowledge is often my little contact at school, very few. Attention, but it is a very basic knowledge.

The overall arrangement of the construction: 1. Organize the construction according to the principle of first underground, after the ground, first main body, rear enclosing, first fine decoration and fine decoration, timely structure acceptance, form the working face as early as possible, and organize the main body cross operation, which is beneficial to shorten the construction period. The configuration of the column and wall template is considered to be used 5-6 times. The construction of special roofing concrete is not required to leave the joints as required. 2. During the construction of the project, it is necessary to arrange the lap joints of the various processes and complete the necessary resources in accordance with the process requirements. 3. Organize enough labor to repair the slope in the excavation stage to ensure that the slope of the foundation pit does not collapse. If the acceptance of the foundation pit is not restricted by the relevant conditions, the foundation earthwork and the cushion layer shall be cross-worked, and the soil shall be cleaned, inspected and poured to ensure that the base soil of the bearing layer is not soaked by rain. Disturbance or artificial disturbance. 4. This project is a high-rise building, and intermediate structure acceptance of structural engineering may be considered. During the construction of the structure, the process interspersed and the embedded parts are properly arranged. 5. When water, electricity, equipment, etc. are reserved and pre-buried, it is necessary to closely cooperate with the construction progress of civil works, actively organize interspersed cross-over operations, do a good job of pre-burial of water and electric pipelines, and do the installation and commissioning work in the decoration stage.

Formwork engineering: paying off the line: First, the side column of the building, the axis of the wall, and the axis are taken as the starting point, and the axes are drawn. When the template is laid, the center line and the edge line of the template are ejected by the ink line according to the construction drawing. The wall template should eject the edge line and the outer control line of the template to facilitate template installation and correction. 2) The level of the building level is directly measured to the template installation position according to the requirements of the actual elevation. The bottom of the template pad should be leveled in advance, and the debris should be cleaned to ensure the correct position of the template, preventing the bottom of the template from leaking or the roots after the concrete is formed. The foreman determined the assembly design plan of the template in advance, and carried out the technical, quality and safety of the construction team. A certain amount of garbage cleaning holes should be left at the bottom of the wall and column side molds. The template should be brushed with a release agent. There are a lot of things to note, I won't list them here.

Reinforcement lashing should meet the following requirements: 1. The intersection of steel bars must be tied with iron wire. 2. The steel mesh of the plate and the wall can be separated from each other by the intersection of the two rows of steel bars on the outer circumference, but it must be ensured that the steel bars are not displaced. Reinforced mesh sheets that are subjected to two-way forces must not be tied and tied, and must be fully secured. 3. For the steel bars of beams and columns, the design has special requirements, and the stirrups should be set perpendicular to the force bars. The stirrup hooks are stacked and should be staggered along the direction of the stressed bars. For the beam, the hook of the stirrup is staggered by 50% to the left and right of the beam. For the column, the hoop hook is staggered at the four corners of the column. 4. When the vertical reinforcement in the column is overlapped, the hook of the corner reinforcement should be 45 degrees from the template: the hook of the intermediate reinforcement should be 90 degrees from the template. If a small-section column is cast by a plug-in vibrator, The angle between the hook and the template shall be at least 15 degrees. 5. At the intersection of the plate, the secondary beam and the main beam, the reinforcement of the plate is on the upper side, the reinforcement of the secondary beam is centered, and the reinforcement of the main beam is below; when there is a ring beam or a pad beam, the reinforcement of the main beam is on. 6. When the upper and lower layers of steel bars have joints, they should be staggered according to the specifications. The position and the length of the joints must meet the specifications and design requirements. The joints of the steel bars shall be fastened with wires at the center and at both ends as specified. 7. After placing the steel horse stool bracket, you can align the steel bars in the vertical and horizontal directions of the upper steel bars, and draw the binning marks on the positioning steel bars. Then wear the vertical and horizontal reinforcement bars, and the binding method is the same as the lower reinforcement.

Construction technology of the wall: First of all, I know that before the wall is built, the workers should determine the flatness and verticality of the wall according to the upper beam, and then build the wall according to the wall axis placed in advance, so that the masonry can be fully guaranteed. Quality and speed; secondly, the general flatness is not more than 2 cm, so there is no need to modify it, because the mortar can be leveled at the time; again, when the wall is made of foam, the height must be 20 cm at the top, and then the brick is slanted. This is to prevent the upper concrete from shrinking and causing cracks; the wall with the structural columns connected should be made of horses fangs, and the ribs extending 60 cm from the wall are provided, the wall is first built, and the structural column is poured; Before the first bricks on the floor slabs, the floor slabs must be wetted with water and cleaned up. This is to make the mortar and slabs better connected. Finally, the masonry must be properly constructed and lapped correctly; The first bricks for the masonry of the kitchen must be made of cement bricks, in order to prevent moisture.

After determining and verifying the control points of each floor, ensure that the angle and distance closure difference is within the specification requirements, use the internal control points to pass through the main control line, and then stake out the fine lines of each detail, and finally release the wall, beam, and column edge. The secondary stakeout work must follow the principle of “from the whole to the local, first control the broken parts”, and measure the displacement of the large corners of each stairwell and exterior wall, and archive and retain the bottom of all measurement results.

As an important material in engineering, its performance is very important, so when the concrete is poured, the spacing of the vibration rod insertion is about 40cm, the vibration time is generally 15-30S, and it is carried out after 20-30min. Secondary re-vibration. For parts with reserved holes, embedded parts and steel bars, the corresponding technical measures should be made in advance to ensure vibrating and compacting. When pouring concrete, it should be observed frequently. When it is found that there is no density, you should take immediate measures. Immediately after the wall is demolded, the curing agent is cured, and the concrete curing plan is an important part to prevent concrete cracking. During this period, all exposed parts should be kept moist, not wet and dry alternately. After the wall mold is removed, special attention should be paid to maintenance. The naturally-cured components are covered and watered within 12 hours after the concrete is poured. When the maximum temperature is above 25 degrees, the time for covering and watering is still appropriate. The duration of watering and curing is not less than 7 days and nights. When the average daily temperature is below 5 degrees, the components cannot be watered and cured, but they should be covered.

After one month of internship at the construction site, it is the stage where our students combine theory and practice in on-site construction; they have learned many things that are not in the books, such as the on-site construction stakeout, level, total station and other instruments. Use, on-site construction process requirements, understanding of construction drawings and management of the construction site. Precautions during internship: 1. Be familiar with the construction drawings before construction; 2. Wear safety helmets when entering the construction site, pay attention to safety; 3. Construction should be carried out according to drawings and specifications during on-site construction. I firmly believe that through this period of internship, the practical experience I have gained will benefit my life. I will continue to be verified in my actual work after graduation. I will continue to understand and understand the knowledge I have learned in the internship in the future. In my work, I will continue to apply the theoretical knowledge and practical experience I have learned to practical work, fully demonstrating my personal and life values. To achieve self-ideal and bright future efforts.

Part 2: Summary of Construction Internship

Internship is a transitional process from a student's identity to a professional. It is an important step for a person to move toward society. During the six-week internship of Hangzhou Xingyao Holding Group Co., Ltd., with the guidance and help of the school teachers and business leaders, I successfully completed this very meaningful course and gained a lot.

The impression I left was particularly profound:

1. The high-rise erection of the outer scaffolding.

2 Reserve the construction of the hole. The construction of reserved holes will often be forgotten in the construction of construction sites, and the common problems such as dislocations will be common in construction sites, and it is also the most unsuccessful in my internship. In this regard, I decided that as an engineering technician, I must read the drawings, grasp the details, and strengthen coordination and communication with the construction team. It is perfect for the detailed construction of the hole reservation.

3 Civilization construction issues. The impression of civilized construction, this internship did give me a refreshing feeling, but also changed some views on the construction site. Under the constraints of the market economy, the civilized construction has been greatly improved compared with the previous years. Whether it is in the image recognition of the construction site or the material stacking has begun to approach the standardization, but compared with the book theory, there are still some shortcomings and flaws. There is still a big improvement in the overall situation.

When I first arrived at the construction site, I had a lot of places I didn't understand. I first looked at the drawings in the office, but when I watched it for a long time, I felt very bored. I will go to the construction site to see. My teacher during the internship at the construction site was Master Guo. He told me to go to the construction site to change things so that I could learn something. After listening to his teachings, I basically did not leave the construction floor at the construction site. When there is a task, I will follow Master Guo. The most work I do at the construction site is to level and release the line. Sometimes I also hold a walkie-talkie to control the tower crane, and sometimes I do some lighter work. In terms of interpersonal relationships, my relationship with the leaders is general. This is because I am not good at speaking, but I am absolutely obedient to their leadership and complete the task of assignment. I still have many woodworking friends and concrete workers friends. Because we don't have a relationship between leaders and subordinates, we can say anything between us and it is more convenient to communicate.

Through this period of production internship, I learned from the ignorance to the cognition to the company and the society. From the beginning of the encounter to the later work, it was quite smooth. Throughout the internship process, I have a lot of new experiences every day, and I want to say a lot. I have summarized the following points:

First, strictly abide by the company chapter system

Studying and living in school, although there are some campus disciplines that constrain their behavior, they are very lazy and uncontrolled compared to working in a company. Because this campus discipline is mostly warning nature, it will not have much impact on its own development. Working in a company, there are detailed rules and regulations in all aspects. These systems are like high-voltage wires. If you break them, you will be punished. These effects may have a bad influence on your future development. At the same time, to become a very professional and very qualified professional, you must actively face your own work, work hard and do your job well, and do everything you can to make your work perfect. As a professional, a serious and responsible attitude will be the driving force behind your own work. Therefore, in order to successfully carry out an internship, we must first establish a professional ethics that is serious, responsible, and motivated, and asks ourselves like a real professional.

Second, listen more, see more, think more, do more, say less

After we work at the company, the key to knowing if you are qualified for the job is to look at your own attitude towards work. The attitude is right, even if you have not learned the knowledge before, you can gradually master the work. The attitude is not good, even if I have a knowledge base, I will not do my job well. I just got to work in this position, I don’t know what to do, and this is not necessarily related to my major in school. At first I think I have a headache. I can see how others do it during the work process. I listen to what others say, think more about what I should do, and then do it myself. I finally have a more systematic work in just a few days. Knowing, slowly, you can also complete the relevant work. It is impossible to use your mouth to say it. Therefore, we must correct our own attitudes in the future, so that we can do things well.

Part 3: Summary of Construction Internship

From July 1st to August 28th, 2019, he has worked in the Hexi Electrical Appliances Market Project for more than 50 days. Looking back on the internship work for more than a month, I feel very deep and have gained a lot. During the past one month, under the careful care and guidance of the leaders and colleagues, through their hard work and study, they successfully completed the job duties of the on-site civil engineers, and also improved the professional quality of the individual.

During this one-month internship, I was mainly responsible for the on-site management of the Hexi Electric City Project 1#. Since joining the company's project work, the main work has been completed: After taking over the work, quickly familiarize with the drawings and materials of the construction site and related construction buildings, complete the three-way and one-level construction site, including the site selection, joints and burial work of the water pipes, and the buildings. Project progress statistics, construction personnel statistics, quality supervision, coordination of excavator shifts to open channel roads, cleaning of pile heads, participation in the measurement of pile position deviation of each building to prepare for the construction of piles and subsequent processes, on-site handover of engineering quantities Measured statistics. With the enthusiastic help of the company's leaders and colleagues, we actively participate in relevant technical work. Through our own hard work, we combine the theoretical knowledge of drawings with the field engineering practice. By applying the theoretical knowledge we have learned, we can work hard to accumulate field work experience and make ourselves Quickly integrate into new work and life.

At the same time, I also deeply realized that I still have many shortcomings in my work. For example, there is a big gap in engineering experience. The experience of the site has limited experience, and the theoretical knowledge is not well combined with engineering practice. After this is insufficient, I decided to continue to enrich my own theoretical knowledge of the building, and to be able to communicate with colleagues and on-site supervisors on the ground, and strive to enrich my engineering experience while completing various tasks perfectly. I also found that my grasp of theoretical knowledge is not comprehensive and accurate. Therefore, in the future work, I will use my spare time to study architecture, manage theoretical knowledge, enrich myself, and lay a solid foundation for the successful completion of work in the future. Moreover, after more than one month of internship, I fully realized that as a representative of the site of the construction site of Party A, it is necessary to enrich not only the theoretical knowledge of the building and the field experience, but more importantly, to play the role of the manager. The site can coordinate and coordinate, deal with various emergencies on the spot in a timely manner, and be able to make a deep understanding and preparation for the possible situation of the follow-up work, so as to ensure the smooth construction of the project without being overly unnecessary. The factors interfere with the construction progress and quality. In addition, in the future work, I also have to take responsibility for the work to be responsible for myself. I can strictly demand myself when I work, and I can start and finish the problem in time. I believe that with this attitude, I will carry out this attitude. The work not only contributes to the development of the company, but also hones and improves itself.

After more than a month of internship, I also deeply understand that the achievements and progress of my work and the help of leading colleagues are inseparable. In the future work, I must not only further strengthen the combination of theoretical knowledge and on-the-spot practice, but also give full play to it. Personal strengths, and actively improve their own inadequacies, but also should focus on uniting colleagues, play the spirit of team harmony and progress, complete their own work, and add to the college's re-creation.