Work Summary > Internship Summary

[Boutique] Posting Internship Summary Report


This article directory 1 post internship summary report 2 post internship summary report 3 post internship summary report Part 1: post internship summary report

1. Internship purpose:

Production internship is a very important practical teaching link for electronic majors and any other majors. It is the basic training for cultivating students' practical ability and analytical problem solving ability, combining theory with practice. It is also the subject of graduation design and original design work. The source of the information lays a solid foundation for students to graduate design. Grasping the teaching work of production internship and improving the quality of production practice is an important part of improving students' professional quality and ideological quality. 1. Train students to master the basic skills and practical skills necessary for professional and technical work and management. 2. Let students understand the modern industrial production organization, management methods, process and technical methods within the scope of this professional business. 3. Train students' theory to connect with reality, analyze problems, research problems and solve problems from reality, and systematize students' knowledge. 4. Train students to work hard, not afraid of hardship, and not afraid of tired work style.

2. Internship tasks:

1. Safety education and accidents occur and their prevention

2. Learn and understand the structure, structure and role of electronic devices. 3. Learn and understand the structure and performance of various industrial LCD screens.

4. During the internship, socialist, patriotic education, love labor, discipline education, and safety education were conducted.

3. Basic requirements for internship:

1. Students in the internship enterprise must abide by the various rules and regulations of the enterprise and the corresponding labor discipline, and must not leave for no reason and leave the post. There are special circumstances that require leave or change of internship company must obtain the consent of the internship company and the instructor.

2. During the internship, students must strictly abide by the post operating procedures and safety management system to prevent work accidents and personal safety accidents.

3. Work hard, actively complete the tasks assigned by the internship unit, learn with humility, and actively and sincerely ask the workers, engineering and technical personnel and enterprise management personnel for advice and study hard.

4. Internship content:

Learning LCD screen; LED display; light guide plate, brightness enhancement film, reflective film; backlight device, backlight; inverter and other product testing and warehousing, related technical documentation, customer solving problems in LCM use, Processing of LCM.

Six. Internship sentiment:

Through the internship study, I feel that I have gained in the following aspects:

1The company gave me a good platform and conditions for me to get in touch with many products, and I have mastered the related technologies of LCD module and its application.

2 has a certain number of electric, analog power, master some basic knowledge of 51 single-chip 3 can apply PROTEL 99 SE, CAD, POTOSHOP and other professional software and OFFICE office software

4 Enriched their knowledge level, expanded their professional cognition, learned to solve problems, analyze problems, solve problems, classify problems and get progress from problems.

Practice knows the truth, and all the inventions and creations are tested in practice. Without sufficient hands-on ability, it is extravagant to make achievements in future research, especially experimental research. During my internship, I exercised my own hands-on skills and improved my ability to solve problems.

Part 2: Summary report on internship

In terms of education investigation and research, I came to the internship school to assist the office teacher to complete the “Study on the Positive Psychological Quality of the Students”, which is intended to investigate the positive psychological quality of the eugenics. Through this investigation, let me have some students in the school. Have a deeper understanding. At the same time, we also have education surveys and research during the internship. We actively use existing resources and conduct interviews to collect information. The three have both division of labor and cooperation to complete our investigation and research on local education.

In terms of party and group activities, we actively coordinate with the internship school. During the internship, we carried out many group day activities. In March, it was Lei Fengyue. We organized the “Learning Lei Feng” activity to enable students to experience the spirit of dedication and small things from the side. Start. Next is the school sports meeting and the “Red May” art festival. In these two large-scale events, we are all actively involved, and also lead students to perform in the festival. In April, we went to Yincun Middle School for an exchange of experience and learning. In Yinzhong, we listened to their classes and exchanged experiences. For the students to open the "active people to generate big tools" class meeting, the teacher Li to give us the idea to the internship school to share. During the internship, we also interviewed the old folk artists and listened to the old people's experiences in the past. Through these activities, we got both exercise and gained a lot of sentiments.

In the service internship school, in the internship school, I not only serve as a language teaching job, but also help the school to produce the exhibition hall, lead the students to clean the whole body to meet the superior inspection, and assist other teachers to complete the education investigation and research work. This is not only the work that can be done. It is also an exercise for yourself in other aspects.

The top post is coming to an end, and we have learned a lot from the retrospective life. University study is the accumulation of knowledge, and post-internship is to let us turn knowledge into experience. Through the internship, my teacher's professional skills have been trained, facing the society, knowledge is very important, but the experience is particularly valuable. After five months of practical exercises, I have accumulated teaching experience, have grown up, and will work for the future. In the field of education investigation and research, I came to the internship school and assisted the office teacher to complete the “Study on the Positive Psychological Quality of Students”, which is intended to investigate the positive psychological quality of the eugenics. Through this investigation, let me Some students in the school have a deeper understanding. At the same time, we also have education surveys and research during the internship. We actively use existing resources and conduct interviews to collect information. The three have both division of labor and cooperation to complete our investigation and research on local education.

In terms of party and group activities, we actively coordinate with the internship school. During the internship, we carried out many group day activities. In March, it was Lei Fengyue. We organized the “Learning Lei Feng” activity to enable students to experience the spirit of dedication and small things from the side. Start. Next is the school sports meeting and the “Red May” art festival. In these two large-scale events, we are all actively involved, and also lead students to perform in the festival. In April, we went to Yincun Middle School for an exchange of experience and learning. In Yinzhong, we listened to their classes and exchanged experiences. For the students to open the "active people to generate big tools" class meeting, the teacher Li to give us the idea to the internship school to share. During the internship, we also interviewed the old folk artists and listened to the old people's experiences in the past. Through these activities, we got both exercise and gained a lot of sentiments.

In the service internship school, in the internship school, I not only serve as a language teaching job, but also help the school to produce the exhibition hall, lead the students to clean the whole body to meet the superior inspection, and assist other teachers to complete the education investigation and research work. This is not only the work that can be done. It is also an exercise for yourself in other aspects.

The top post is coming to an end, and we have learned a lot from the retrospective life. University study is the accumulation of knowledge, and post-internship is to let us turn knowledge into experience. Through the internship, my teacher's professional skills have been trained, facing the society, knowledge is very important, but the experience is particularly valuable. After five months of practical exercises, I have accumulated teaching experience, have grown up, and will work for the future. The post has been paving the way!

Part 3: Summary report on internship

Through the internship, I broadened my knowledge, sorted out the knowledge I learned, and constantly summarized and corrected.

The builder is a technical organization manager at the grassroots level. The main work content is to go deep into the construction site under the leadership of the project manager, assist in the construction supervision, review the engineering quantity with the construction team, provide the material specifications, models and arrival dates required at the construction site, and do the acceptance of the on-site materials. And management, timely acceptance and concealed visas for concealed projects, assisting project managers to collect, store and archive data for the project, and have an important responsibility for the progress and cost of on-site construction. The construction worker's job is to specifically solve the relationship between the construction organization design and the site at the construction site. The organization design must rely on the construction staff to supervise, measure, write the construction log, report the construction progress, quality, and deal with the site problems. Contact person for the command and construction team. At the same time, we must coordinate and manage with the subordinate construction teams.

It enhances the interpersonal skills, language expression and communication skills that can't be learned from books, and understands the current status and development prospects of the current construction industry with the development of the times. Through the internship, I have greatly stimulated my enthusiasm for learning and exploring in practice, laying a solid foundation for future work.

During the internship, he is constantly urging and guiding himself, actively advancing, diligent and promising, dedicating his dedication, realizing self-worth in his work, and clarifying the ideals and goals for his unremitting struggle. In the future work and the way forward, Faith and philosophy are driven by the spirit, solid, dedicated, hardworking, and constantly making new achievements in their own positions, using their excellent performance to return the port to prove their loyalty to it.

The content and completion of the work:

As a qualified construction worker, under the leadership of the project manager and construction supervisor, he is responsible for the construction organization and construction management work in the operation area and section. Coordinate construction, manage construction quality, on-site data, track construction progress, report material consumption, report required materials, coordinate supervision, make design changes, and confirm the amount of work on site. The first is to understand the drawings, understand the project implementation, and then rely on the drawings to build according to the drawings. Secondly, master the construction process at all stages of the construction and control the construction quality and progress and coordinate the scenes of people, materials and machines. management. I am mainly responsible for construction technology, construction quality, construction progress, and responsible for construction safety, collaborative material testing, and on-site management of professional supervisors.

Here is a brief introduction to the work: 1. In the on-site construction process, I know that the general construction process of the workers is: 1. Organize the construction according to the principle of first underground, rear ground, first main body, rear enclosing, first rough decoration and fine decoration. In time, structural acceptance is carried out, the working face is formed as early as possible, and the main body is cross-worked, which is beneficial to shorten the construction period. The configuration of the column and wall template is considered to be used 5-6 times. The construction of special roofing concrete is not required to leave the joints as required. 2. During the construction of the project, it is necessary to arrange the lap joints of the various processes and complete the necessary resources in accordance with the process requirements. 3. Organize enough labor to repair the slope in the excavation stage to ensure that the slope of the foundation pit does not collapse. If the acceptance of the foundation pit is not restricted by the relevant conditions, the foundation earthwork and the cushion layer shall be cross-worked, and the soil shall be cleaned, inspected and poured to ensure that the base soil of the bearing layer is not soaked by rain. Disturbance or artificial disturbance. 4. This project is a multi-storey building, and intermediate structure acceptance of structural engineering may be considered. During the construction of the structure, the process interspersed and the embedded parts are properly arranged. 5. When water, electricity, equipment, etc. are reserved and pre-buried, it is necessary to closely cooperate with the construction progress of civil works, actively organize interspersed cross-over operations, do a good job of pre-burial of water and electric pipelines, and do the installation and commissioning work in the decoration stage.

A good construction manager is both a hardworking and a goodwill home. In cooperation with the supervision and management project construction, it is necessary to understand the construction process and construction method management during construction and supervise and urge the construction team to complete the completed tasks in time.

The main gains and lessons of the internship:

Through this internship, I learned a lot of things that I couldn’t learn in the textbooks, and I can make myself closer to the society and realize the pulse of the real builders. During the internship of the construction unit, I found myself watching. From the perspective of the problem, the way of thinking about the problem has gradually developed. This is inseparable from practice. In the course of practice, I feel full and feel growth again.

Construction technology is a technician who goes deep into the field. In this process, engineering quality, construction safety and management are mutually reinforcing relationships. The three mutually restrict and promote each other. There must be a strict management system and scientific management methods, and quality and safety can be guaranteed. In turn, good quality and safety must have a set of strict management systems to take care of. Some seemingly inconspicuous problems in the construction management process often affect our project progress and affect the quality of the project. Here is a brief analysis and solution to some of the problems I encountered during construction.

1. The bottom template bracket is easy to settle

Analysis of the cause: In the construction process, the management is not good, the design is not carried out before the mold is attached. After the vertical mold is not carefully checked whether the bracket is stable, the construction team operating technicians are not trained, not familiar with the construction method, blind and dry, resulting in engineering accidents.

Solution: The formwork support must be determined according to the specifications and carefully calculated before pouring concrete. Before the construction, the foundation of the formwork should be tamped and filled, the axis position of the support should be placed, the gravel cushion should be placed, and the block should be set under the support.

2. In the process of expansion and casting, the template bulges, shifts, bursts and even collapses, and the expansion mold appears. Analysis of the reason: the lateral support stiffness of the template is not enough, the template is too thin and the strength is insufficient, and the pinch support is not strong; if the column spacing is too large in the column mold, the mold expansion phenomenon will occur.

Solution: After the template is in place, the technician should check it in detail and find the problem and correct it in time. Generally, the middle part of the beam is pulled through the crosspiece with the wire, or the two sides of the formwork are tightened by the pull bolt; the column mold should calculate the side pressure when pouring the concrete, check whether the hoop meets the requirements, and add the standard horizontal slope in time. Support, scissors, etc.

3. Rebar processing error

Analysis of the cause: The construction management is chaotic, there is no strict inspection system, the operator will go to the construction site without training; the steel level is not understood, there is no ingredient list on the construction site, the operator is not strong, and the length of the unloading is out of control. Short time.

Solution: A sound quality inspection system must be established at the construction site. Each process must be inspected. The steel bar should be produced in strict accordance with the design drawings. The steel bars should be straightened first, and then rusted and then unloaded. Steel bars of the same specification shall be uniformly listed, indicating the grade, type, diameter, etc. of the steel bars. Special personnel shall be responsible for transportation, stacking and lifting. Technicians should conscientiously do a good job in concealing engineering acceptance records for steel bars.

4. Leaking structural reinforcement

Analysis of the reasons: The understanding of structural design is not comprehensive, and the role of structural reinforcement is not enough. In my opinion, most of them are not enough to pay attention to forgetting that they should also place structural steel bars, such as putting less or not putting "waist bars" in the beams, bending the steel bars under the columns, and so on.

Solution: Carefully check the installed steel bars to make up the structural steel bars, especially the edges and corners of the cast-in-place plates, the support parts of the beams, and the surrounding walls of the walls or plates. Effective measures should be taken during construction to protect the location of the structural reinforcement, and should not be stepped on at will.

5. Improper concrete pouring causes defects in components

Analysis of the cause: This defect is clearly seen after demoulding, and it is too late to remedy it. Because the enamel has been initially condensed, there will be honeycomb, pockmark, unevenness, exposed ribs, holes, slag inclusions, etc., which affect the structural durability requirements.

Solution: The general treatment methods include local repair, grouting, and reinforcement. It is necessary to formulate a reasonable construction technical plan, clarify the operational requirements, and carry out technical delivery work to the work team. Clear responsibility, implement demarcation and listing system, strengthen on-site management, pay attention to observe the situation of the template after loading the concrete, and solve the problem if it is found.

In summary, these problems and treatment methods have made me deeply understand the gap between the theoretical knowledge and practice of the book theory. There are many different construction techniques and construction management methods introduced in the book, due to geographical regions, humanities, and education. The degree and environment are different, so that reasonable methods and ways must be adopted in the project management process, and flexible application to specific management. Construction work is also a complex and varied work. The quality of management is directly related to the economic and social benefits of the project.

In the process of construction and construction, in view of the current situation of safety production, the safety of production must be “safety first, prevention first”. Always keep in mind safety and take safety control as your own work content. The construction industry is a very knowledgeable industry involving a wide range of knowledge. It can be said to be an industry that is “old and old”. In the future work, I will study cultural knowledge and expertise more hard. Constantly combine theoretical knowledge with practical experience, do a good job in the job, and make more contributions to the society.

recommended article

popular articles