Today, we came to the construction site for the first time. The master did not immediately let us go to the construction site, but gave us a safety and health education. Safety production is related to the reputation and benefits of the company, and it is also related to the lives of thousands of families. Therefore, in the construction and production, we must implement the safety policy of “safety first, prevention first” and adhere to the principle of “safe production of pipe production must be safe”.

I know the teacher’s "three guarantees, four mouths, five neighbors"

"Three guarantees" protection

All personnel entering the construction site must wear the helmet properly. Hard hats should be checked frequently and resolutely scrapped if they do not meet the requirements.

When working at a height of 2m or more, the seat belt must be fastened. The various parts on the seat belt must not be arbitrarily removed and replaced at will.

The specifications and materials of the safety net must conform to the national standards and should be carefully checked before use. The outside of the project and the outside of the gantry are all closed with a dense mesh safety net. The safety net is completed and can be used after inspection and acceptance.

"four mouths" protection

a) The stairway, elevator opening, access opening and retaining hole of the project shall be protected by safety.

b) After the stair is demolished, a 1.2m high double-layered guardrail is placed along the stairs.

c) The cover should be covered with a cover and fixed firmly.

d) Set a passageway on each side of the project and set up a shelter. The width of the shed is larger than the entrance and exit, and the length is not less than 3m. The top of the shed is covered with 5cm thick wooden planks, and the rest of the temporarily unreachable unit entrance is temporarily closed, and the sealing should be firm and tight.

e) There should be a prominent warning sign at the entrance and stairway, and a red light at night.

"Five Edges" protection

a) Set protective railing around the foundation pit and hang red light at night to alert.

b) A 1.2 m high double-layered guardrail shall be set up around the roof, around the perimeter of the frame, on both sides of the ramp, and on both sides of the unloading platform, and the safety net shall be hung.

c) In addition to the protective railings on both sides of the loading platform, the platform door shall also be provided with a safety door or a movable protective railing.

d) Temporary protective railings must be installed on the side of the elevator and on the side of the stairs. Do not remove them before installing the official railings.

e) All kinds of adjacent protections must be installed firmly and can be used after inspection and acceptance. No one has the right to move and dismantle various protective devices, protective facilities and safety signs on the construction site.

Although the construction is important, it does not have a good environment, and it is not a good project. Therefore, it is necessary to protect the workplace with sanitation and sanitation.

Sanqing: The bottom of the work is clear; the bottom of the material is clear; the site is cleared.

Six good: construction is ready; equipment management is good; project quality is good; safe production is good; completion progress is good; life management is good.

Today, we saw the engineering drawings of the project, and read them all over the whole. I learned from my heart, knowing what place corresponds to what map, and also knowing the project overview in detail.

1. This project is the Zhangjiakou Rongchen Manor Commercial Street commissioned by Zhangjiakou Founder Real Estate Development Co., Ltd. The project site is located at Shengli South Road, Hedong District, Zhangjiakou City. The site geomorphology belongs to the interaction zone of the Qianlishan Mountain front slope Hongya skirt and the Qingshui River second-level terrace. The site is uneven and slopes from north to south.

2. Zhangjiakou City is arid-semi-arid climate with climatic characteristics such as windy and rainy, uneven rainfall and large temperature difference between day and night. The average annual precipitation is 400 mm, the frost-free period is 140 days, and the rainy season is mainly concentrated in July-September, accounting for more than 70% of the annual rainfall. The groundwater depth in this area is about 35 meters, and the maximum annual variation of the water level is 1.5. In meters, the standard freezing depth in this area is 1.4 meters.

3. The project is a multi-storey commercial building with a fire resistance rating of 2, a seismic fortification intensity of 7 degrees and a building durability of 50 years.

4. There are two types of structure: frame shear wall structure and frame structure.

Under construction site to understand the internship and drawings

Today, Master took us to the construction site. When we left the construction site, we repeatedly emphasized safety and the three guarantees, four, and five neighbors. I deeply realized the necessity of safety first and safety and health education. I saw the foundation beam reinforcement and foundation beam formwork that was being tied up, and the foundation beam reinforcement and foundation beam formwork that had been tied and completed, and I learned the relevant knowledge and actual situation of the steel bars I learned a few days ago. After I got in touch, I combined Master’s teaching with production and applied the teacher’s teaching to actual production. The image learned about the cutting, binding, and connection of steel bars, and sublimated the knowledge of the teacher. To make the knowledge more solid

Inspecting the foundation beam with the master

Today, I and Master examined the foundation beam of yesterday's foundation, and the inspection principles and items are as follows:

1) Guaranteed items:

A. The variety and quality of the steel bars, the grades and performance of the welding rods must meet the design requirements and relevant standards. The chemical composition inspection and welding test must be carried out before the imported steel bars are welded, and the welding can be carried out after meeting the relevant regulations.

B. The surface of the steel bar must be clean. If there are granules or flakes of old rust, the steel bars that remain punctuated after derusting are strictly prohibited to be used according to the original specifications.

C. The specification, shape, size, quantity, spacing, anchor length and joint setting of the steel bar must meet the design requirements and construction specifications.

D. The mechanical performance test results of welded joints must meet the special requirements for steel welding and acceptance.

2) Basic items

A. The number of buckles and loose buckles of the reinforced steel bars shall not exceed 10% of the number of buckles and shall not be concentrated.

B. The number of stirrups made of grade I steel bars meets the design requirements. The angle and straight length of the hooks are to comply with the construction specifications.

C. The orientation of the hook should be correct. The lashing joints shall comply with the provisions of the construction code, and the lap length shall not be less than the specified value.

D. There is no transverse crack and burn on the welded joint, and the welding is uniform. The bending at the joint is not more than 4 degrees, and the displacement of the steel bar at the joint shall not be greater than 0.1d and not more than 2mm.

Foundation beam template

Yesterday, I and Master’s basic ground beam were tested on the template today, which is basically the same as the textbook, but it is slightly different, adding some practicality and randomness:

1) Installation of steel formwork: The installation of the combined steel formwork is made up of a flat formwork, a female and a male angle formwork. U-shaped cards, latches and other spare parts for splicing the longitudinal and transverse ribs are required to be complete and firm, and not to be loose.

2) Use assembled steel formwork: Determine the diameter, length, position and the spacing and size of the longitudinal and transverse keels and side bars. In the case of a steel form that does not have a modulus, a wooden formwork can be added to make up the seam.

3) Pre-inspection of the template: After the template is installed, pre-check the section size and elevation, pull bolts, and connecting rod support. All should meet the requirements of design drawings and quality standards.

Foundation pit excavation

Today, on the way to the construction site, I saw some construction sites excavating the foundation pit and asked Master about the excavation of the foundation pit.

First, the process:

Determine the excavation sequence and slope → segmental stratified average digging → trimming and clearing

Second, the operation process

The project is an unsupported foundation pit and must be graded. The steepest slope of the slope should be 33%.

1. Excavate the foundation pit, reasonably determine the excavation sequence, route and excavation depth, and divide the stratified average digging.

2. During the excavation process, the condition of the tank wall and the slope should be checked at any time. Prepare for protection against collapse.

3. Excavation pits shall not be dug below the design elevation.

4. When the excavator moves along the edge of the excavation, the width of the upper edge of the mechanical distance slope shall not be less than 1/2 of the depth of the foundation pit and the trench.

5. Earthwork that cannot be dug in mechanical construction should be excavated at any time with manual labor, and the earthwork should be transported by hand to the place where the machinery is dug, so as to be dug in time.

6, repair and clear the bottom. At the bottom of the trough design 50cm trough, find the horizontal line, nail the small raft, manually excavate the temporary soil. At the same time, the line is pulled by the axis of both ends, and the size of the groove edge is checked to determine the groove width standard. In this way, the edge of the groove is trimmed, and finally the earth at the bottom of the groove is removed. After the repair of the bottom of the tank, the quality inspection and acceptance shall be carried out.

7. Due to the requirements of concrete pouring piles, the earthwork stored on site should be reasonably stacked. When the site is conditionally stacked, leave enough soil for backfilling; the excess earthwork should be transported away at one time to avoid secondary handling.

Third, the quality standard

The foundation soil of the foundation pit and the site must meet the design requirements and is strictly prohibited.

Quality issues that should be noted

Excavation of the foundation: the excavation foundation pit shall not exceed the base elevation.

The substrate is not protected: the disturbance to the foundation soil should be minimized after the foundation pit is excavated.

Excavation size is insufficient, the slope is too steep: the excavation width and slope at the bottom of the foundation pit, in addition to the structural size requirements, the working surface width should be increased according to the construction needs.

The construction sequence is unreasonable: the earthwork should be excavated strictly according to the construction sequence stipulated in the construction plan. It should be noted that the excavation should be carried out from the lower part first, and the stratification and segmentation should be carried out in order to form a certain slope for drainage.

Brick wall

Master continued to explain with the previous project.

Brick wall:

1) Grouping method: The masonry is generally used as a single one. Brick columns shall not be constructed with a core-filling method that is built around after four weeks.

2) Rowing brick bottom: When the first floor of the outer wall is the bottom of the brick, the two mountain walls are arranged with bricks, and the front and rear vertical walls are lined with bricks. According to the position of the door and window opening. Carefully check whether the length of the window wall and the size of the concrete are in line with the brick module. If the modulus is not met, move the position of the door window to the left or right. If there is a break, the seven-point or slab should be placed in the middle of the window, with a wall plaque or other inconspicuous parts. When moving the door window position, it should be noted that the head of the heating guard and the door window are not affected. In addition, when arranging bricks, it is also considered that the brick wall above the door window does not appear to be broken when it is closed. Therefore, there must be a holistic consideration when arranging bricks. That is to say, when each brick is arranged in front and rear, it is necessary to consider the brickwork behind the window. The corner of the window must be a seven-pointer.

3) Disc angle: Before the bricklaying, the disc angle should be first, and each disc angle should not exceed five layers. The large angle of the new disc should be lifted in time. If there is any deviation, it should be repaired in time. When checking the angle of the disc, carefully compare the brick layer and the elevation of the leather rod, and control the size of the gray seam to make the horizontal gray seam uniform. After the big angle plate is good, it will be reviewed again. The leveling and vertical can fully meet the requirements before the wall can be hung.

4) Brick selection: Bricks with neat edges and corners, no bending, cracks, uniform color and basically the same specifications should be selected. When the tapping sound is loud, the bricks that are burnt and discolored and deformed can be used on the foundation and the inner wall that does not affect the appearance.

5) Hanging line: double-sided hanging line, if several people use a single connecting line on the long wall, there should be several branch line points in the middle, the small line should be tightened, and each layer of brick should be threaded to make the horizontal seam uniform. Straight and smooth.

6) Bricklaying: Bricklaying should adopt a shovel ash, a brick, and a squeezing "three one" bricklaying method, that is, full squeezing operation method. When laying bricks, the bricks should be flat, the hands are high, and the walls are to be opened; the hands are low and the walls are back. Bricklaying must be followed by the line, "upper line, lower with ribs, right and left adjacent to be flat". Horizontal gray seam thickness and vertical gray seam width is generally 10mm, but should not be less than 8mm and should not be greater than 12mm. During the operation, it is necessary to carry out self-inspection seriously. If there is any deviation, it should be corrected at any time. It is strictly forbidden to smash the wall afterwards. The clear water wall is not allowed to have a three-point head, and it is not allowed to arbitrarily move and sew in the upper part. The masonry mortar should be used with the mixing. The cement mortar must be used up within 3 hours. The cement mortar must be used up within 4 hours. The overnight mortar should not be used. The wall should be sewed with the brickwork. The depth of the seam is 8~10mm. The depth is the same, the cleaning is clean, and the mixed water wall should be scraped off with the tongue.

7) Retention: The corner of the outer wall should be built at the same time. The intersection of the inner and outer walls must be left oblique, the length of the rafter should not be less than 2/3 of the height of the wall, and the scorpion must be straight and smooth. The segmentation position should be at the deformation joint or the corner of the door window. When the partition wall is built at the same time as the wall or the pillar, the yoke can be retained and the rib can be pre-embedded. Two φ6 steel bars are reserved for every 50cm of the wall, and the buried length is not less than 50cm on each side from the stubble of the wall, and the end should be added with a 90-degree hook. The top cover of the partition wall is tightly packed with bricks.

Construction site internship summary

The internship was soon over. During the internship process, under the guidance of the teacher at the internship site, I was puzzled and asked about the professional knowledge that appeared during the internship process. I was eager to ask and learn from them. Through this internship, I was very profitable. I have learned a lot of professional knowledge, and I have learned a lot from the older generation of construction workers.

The internship location is Guangfo MRT 16-label Yangang Station, Yangang Station is located at the intersection of Industrial Avenue and Jiangyan Road, and is located along the southeast of Industrial Avenue. On the station, the Shayuan Road is connected to Shixi Road, and the Yangang Station is set up according to the project. The industrial road planning road is 40 meters wide, with heavy road traffic and dense pipelines. The Yangang station storage line is constructed by mining method to reduce the impact on traffic and pipelines. To meet the construction requirements of the buried tunnel, temporary construction shafts and construction cross-channels are set on the west side of the intersection of Industrial Avenue and Jiangyan Road.

The temporary construction shaft and cross channel of the Yangang station storage line are constructed by mining method and anchor spray support. The shaft clearance is 6000X6000 mm, the depth is 21.938 meters, and the borehole wall is 300 mm thick shotcrete. The construction cross-channel length is 21.879 meters, of which the standard section length is 1.2 and 8.605 meters, the variable section length is 12.074 meters; the standard section clearance is 5000X5000 mm and 5000X11971, the shotcrete is 300 mm thick; the variable section section clearance is 4000X5000 ~11971 mm. The shotcrete is 300 mm thick.

The parking line behind Yangang Station is located at the north side of the intersection of Industrial Avenue and Jiangyan Road. Below the Industrial Avenue, the storage line is located in the left line tunnel of the line. The distance between the line and the left line is 4.05m. The line of the storage line is the same as the right line. The centerline spacing of the tunnel is 8.95m, and the net spacing between the mine tunnel and the shield tunnel is about 2.4m. The total length of the storage line is 169.2m. The standard section has a net width of 9.3m and a net height of 8.5m. In addition to the requirement of the limit of the storage line, the clearance of the standard section must meet the requirements of the shield. The net width of the enlarged section of the shield is 10.5m, the net height is 9.04m, and the clearance needs to meet the turnout. At the machine, the section of the machine is enlarged, the net width is 10.5m, the net height is 9.04m, the thickness of the arch is about 8.4m~9.2m, the storage line is constructed by mining method, and the temporary line is set on the north side of the line. A construction shaft.

In this graduation internship, I also found some shortcomings and shortcomings, mainly the following four points:

First, the mastery of professional knowledge is not comprehensive. Despite the serious study of professional knowledge in the school, the current knowledge is not wide enough, and it is not easy to be qualified for the MRT project. Therefore, although I am going to work in the near future, I should regard the work I do as It is the beginning of a new study. It is only in practice that you will acquire more professional knowledge and skills.

Second, the professional practice experience is far from rich. Due to the low number of professional internships, it is difficult to apply the knowledge learned and practice, and the experience gained through practice is a shortage. Therefore, in the future, we must seize the opportunity to learn from the predecessors who are engaged in water conservancy projects. At the same time, we must change the learning methods and attitudes, change the passive absorption learning methods that rely too much on teachers in the past, and actively take the initiative to learn from others. Ask, while strengthening self-learning ability and mastering the ability to solve problems.

Third, the use of professional knowledge in engineering is not flexible enough. Through this graduation internship, I really feel that the professional knowledge I have learned before is not flexible. This is mainly because the knowledge acquired has not formed a complete system. These scattered knowledge points are difficult to apply. Therefore, in the future, we should pay attention to accumulation and application in learning and practice, so that the knowledge we have learned will change from quantitative to qualitative. Play a greater guiding role.

4. The mastery of the theory is not solid enough. I only know that I didn’t learn well when I was internship. I only had to take care of the exam at school, and I just took a look at the exam. After the exam, it was a blank in my mind, no matter what I want in the future. Whether it is used or not, it disappears in memory. The ability to be familiar with drawings is poor, and the graphic of the plane cannot be imagined in a three-dimensional manner. I don’t know the latest construction specifications, so I can’t quickly judge the right or wrong of the construction. For some The construction sequence is still unclear, and the operation of each construction process is not understood. The theoretical and practical ability is poor, and there is too little understanding of the latest developments in construction.

During the internship, I also deeply realized how to be a person and a speech. First, treat people with sincerity and friendship. Don't be guilty of yin and falsehood, and have a passionate heart to deal with everyone in the society. Second, learn with humility. Whether it is a project manager , construction workers or ordinary workers, we must be open-minded, whether you are humble, calm and meticulous, do not be self-righteous, arrogant. Third, be proactive. Do not be afraid to lose face, do not know to ask, and do not be ashamed to ask, what is in your heart do not hide Kneeling, don't be afraid of mistakes, you must say it. Fourth, the scale and skill of speaking. Speaking should be generous, what kind of person can say what kind of words, light and appropriate, appropriate and reasonable, and take into account multiple parties. To achieve "win-win" Even the purpose of "winning more." Five, meticulous and in-depth. No matter what you do, don't float on the surface, don't just know one, don't know the other, you should be clear about it. Don't understand it, don't understand it. In-depth understanding. Six, establish a lofty goal. We can not just look at the eyes, do not seek development, give yourself a reasonable goal, step by step, practical and enterprising. Do not want to do a day monk hit a Tianzhong. Make plans and strive for it.

This internship is targeted and practical because we did this internship at the school. Through this internship, I have more fully understood the professional knowledge and learning, so as to better master and apply professional skills in future work and study.

First of all, through this cognitive internship, I have a deeper understanding of civil engineering expertise. The content learned during the school is theoretical knowledge, and it is far from enough to learn and apply the theoretical knowledge in practice. Through this internship, I have a correct understanding of the problems and deficiencies in previous studies and internships.

The knowledge of going to school in the previous textbooks is the most basic content in civil engineering. However, with the increasingly standardized and complete construction industry in China and the higher safety requirements of the people for buildings, it is easy to have various problems in engineering. Doubt, how to deal with these problems quickly and correctly? I think, that is to use the knowledge and principles we have learned, find out the "bottleneck" according to the problem, find a breakthrough to solve. In fact, many of these basic knowledge and principles have been learned, but how to connect them to solve practical problems in and, engineering, we need to continue to learn and summarize in practice.

The other side of "learning to use" is "seeing big and small". A lot of knowledge and principles are often the key to solving problems. For example, when we were internship during the last summer vacation, I was puzzled by the basic static pressure pile method and bolt fixing treatment scheme, because static pressure piles have higher economic costs than cast-in-place concrete piles. Therefore, I suspect that the foundation of the project is weak or the sand is serious. I have been affirmed by the project leader. After learning the basic project, I always remember that the instructor told us that if the bearing capacity of the foundation meets the requirements, the static pressure pile should be used as little as possible. The static pressure pile is time-consuming and costly. This is the small reason that allowed me to produce the above. Problems and doubts. Some problems seem complicated, but changing angles or thinking differently may be much simpler. Therefore, in addition to applying what you have learned to engineering, you should also be flexible, proficient in and use of seemingly simple principles and methods. From a small point to a subtle point of view, taking into account the overall situation, you will be able to solve problems better.

Secondly, through this construction internship, I am more aware of the importance of construction management. Whether it is designing or construction or supervision, we should focus on improving construction management efficiency.

MRT project construction management should consider a lot of content, a wide range, and the amount of work tasks to be arranged is larger, but this is directly related to the progress and efficiency of the project. The engineering staff perform their duties, and all the work is carried out in an orderly manner. The workers are busy but orderly on the construction site. The construction workers, safety officers and supervisors are also at the construction site, and the construction work efficiency is improved to the best. The project engineering leader is on the site to guide. Therefore, all work is underway.

Through the introduction of advanced management models and scientific management methods, the construction efficiency has been greatly improved, which is very helpful to the continuity and continuity of construction.

Indeed, after graduating from college to a new job, we are faced with a blank piece of paper, everything is new, and everything is waiting for us to work hard. Therefore, in the face of so many seniors who have been engaged in the MRT project for a long time, their work experience is more abundant than ours. The knowledge is more solid than ours. The knowledge is more profound than ours. We only have the patience to learn from them and learn from them. We will have With greater progress, we will achieve even greater gains in the difficult and challenging work of the MRT project.

During this internship, I learned a lot of things. Not only did I have a lot of learning, but I also learned a lot about how to behave. It has benefited me a lot. As a young person who has just stepped into the society, he does not understand anything and has no social experience. However, with the help of my colleagues, I quickly integrated into this new environment, which is very beneficial for me to enter a new job in the future. In addition, I also learned how to better communicate with others, how to better express my views, and how to persuade others to agree with their own views. I believe that these valuable experiences will be the most important cornerstone of my future success. Internship is an experience that every college graduate must have. It enables us to understand society in practice, let us learn a lot of knowledge that we can't learn at all in the classroom, and open up our horizons and increase our knowledge for us. A good foundation for serving the society has laid a solid foundation. I have learned valuable lessons from countless failures, and my will has been honed over time. I always remind myself that only by continuous efforts can we keep up with the times. In short, the significance of this internship is no longer a task for me to complete credits and complete graduation internships, but to take the first step in the process of opening the door to “life journey”.

Finally, through this construction internship, I have more fully understood the direction of future efforts. In fact, it is really difficult to learn more knowledge and skills in such a short construction internship. However, during these days of construction internships, I have recognized the direction of the work required for future engineering work from a more comprehensive perspective. As the teacher and engineer said during the internship: "Working in civil engineering after graduation requires modesty and learning."

This internship brought me to a lot of things I didn't know and know before. Much of the knowledge was previously unseen in books. Through this internship, I have strengthened my practical ability. I left the book and really came to the construction site to really feel the necessity of the internship. It also made me realize that the basic knowledge is not solid. In terms of construction technology, the actual operation is based on theoretical knowledge, but it is more flexible and operability than theoretical knowledge. This requires learning professional knowledge and actively thinking at work, applying flexibly, and cultivating your own thinking innovation and independence. problem solving skill.

More than ten years of student life is about to end. During the internship of CSC, I understood a lot of things. The adults said that there are always many "characteristics" that have caused headaches for the company's bosses, and now I have finally experienced it. As a student, the main job was to study. Now I am about to set foot on the society. Obviously, my identity has changed, and my natural focus has changed. Now my main task should be gradually transferred from study to work. This internship period is like a transition period – the transition from a student to an office worker is a critical stage. Recalling my work during this period is not satisfactory. I have thought about this, learning experience is naturally a factor, but more importantly, the change of mentality has not been done. Now that I have discovered this shortcoming, it should be fairly timely, because I understand what it means to work. In the days that followed, I will work in this direction, and I believe that I can erase the "features" that should no longer exist. Thanks to the masters for their guidance and teaching during this time, I have benefited a lot from it.

Construction site internship summary

Internship is a very strange word for me, because I have not experienced an internship in my student life for more than ten years. This is my first internship. He will comprehensively test my ability in all aspects: study, psychology, body, mind, etc. . Just like a touchstone, test whether I can use the theoretical knowledge I have learned in practice. It is related to whether I can successfully settle in this challenging society in the future.

Because of the short time, I was exposed to these things in those few weeks, but I am content.

If you don't practice a lot of problems, you don't think about it. After you practice, you know what you can encounter. This requires us to have rich practical experience. The practical experience of interns like the one who has just left the school is not very rich, but the theoretical stuff. If there is nothing, then it will not be able to eat during the internship. After a period of internship at the construction site, I realized that it was not the textbook middle school that couldn’t be used, but whether you would use it or not, and you couldn’t understand the changes and the opposites.

Internship content:

At first, the prototype of this site had not yet been seen, only a foundation pit was seen. We are assigned to the release group, which is the foundation of the building and is necessary for our beginners. During this period, I had a better understanding of the level and the theodolite, and I was more familiar with the operation of the measuring instrument. I also practiced the observation of the instrument on the construction site, which enabled me to adapt to operating the instrument under different conditions.

Night shift is a skill that allows us to adapt to the field operation under more severe conditions. To adapt to the worst environment, we can train ourselves better and let us learn more and more solid. Now the night in the north is cold. In the sleepy and cold, we must complete the measurement task. This is a challenge for our college students who are just internships, and a test that reflects our ability to adapt.

As we work with the measurement, we also need to do something else to enrich our internship life. Digging, digging stones, moving bricks... is the exercise of our will. Although we have not done well for these exercises, we have also honed us at the same time. However, we have experienced the taste of society and let us know the hard work of the work. We must adapt to the work of the site.

A month's time has passed, and the life of one month has finally been fulfilled. I have done it too. The experience is also slowly experienced. I believe that there will be more exciting life in the future. I am looking forward to it.

Internship experience and gains:

The biggest gain of this internship is to learn to adapt to the environment. Through this internship, I adapted to this kind of site life. Although it is not necessary to go to work on the construction site in the future, but with this period of exercise, no matter what work is done in the future, there is a kind of perseverance that bears hardship and endurance, and also learns to adapt to the environment. In addition, I knew some problems on the construction site that were different from the school. I knew on the construction site how to be a technician and how to communicate with the workers.

Through this internship, I have gained a deeper understanding of the relevant knowledge of architecture. It should be said that learning more professional knowledge at school is only theoretical, and it is still somewhat different from reality. This internship has a certain amount of help for my ability to understand pictures. I know where to pay attention and carefully calculate when I map. Where the structure must consider the safety of the construction, and where to consider the actual construction problems when the line is released. It can meet the requirements of the specification and meet the requirements of the specification to achieve standardization of design and construction. Without this internship, perhaps only using the theoretical knowledge in books, not considering too many problems, it is even more impossible to think of whether the drawings I saw can be constructed. Although the construction site is bitter, what can be learned is some practical things. The exercise is the practical ability to solve problems.

After a month of internship, it is necessary to sum up. First of all, through this month's internship, through practice, I have learned a lot of practical knowledge. The so-called practice is the only criterion for testing the truth. Through personal experience, I have observed the construction process of the whole building at a close distance, and learned a lot of practical construction knowledge. This knowledge is often my little contact in school, and I pay little attention to it. But it is a very basic knowledge.

University life is a day of intense and full of expectation. When you are studying leisurely, you always carry your bags, stay away from family, friends, and teachers, and go to the road of your own. However, when we finally can leave the nests of the elders like the eagle feathers that have just been feathered, and walk alone on the big stage of social work, we find that the road to life is so rough and bumpy, anyone’s success is It was a storm. In just one month of internship life, I learned a lot of things that will help me a lot in my future work. This is the first time in my life that I have entered the society and I am going to work for the first time. I feel that life is really It's not easy.

The internship is essentially a simulation exercise before graduation. It is very important to be on the way to work in the society and to set foot on the job. I hope that life can be extended from this, and that what I have learned is really useful.

To sum up a sentence: Eat hard and bitter, and be a person.