Work Summary > Internship Summary

Architectural internship summer internship summary


In the summer of my sophomore year, I was lucky enough to go to Xinhua Design Co., Ltd. for an internship . The colleagues in the company are very enthusiastic, I am not bothered by my harassment, and taught me a lot of knowledge. I was the first time I made a picture of cad. During the internship , Zhao Gong and his colleagues patiently explained the design process and the design specifications of different building types. First of all, it is an understanding of the entire process of the building. The formation and process of the building are as follows: Investor investment - - National review and approval - Design institute to make architectural plan - - Winning bid - Design institute for architectural design - Construction Ministry approval and approval - Construction unit construction - Supervision for review - Construction completed, delivery - decoration company to carry out renovation - delivery - - by investors and real estate companies to buy and sell. Throughout the process, the design part of the building occupies a very important position. Therefore, every step of design should be in accordance with the regulations, and every step should be cautious. There are also processes in the design: do the plan - the plane design - the facade, the section design - hydropower, heating, elevator design.

Suzhou City is a very nice place, with a lot of excellent modern architecture and classical architecture. For example, the museum is located on the west side of Nanshan Road on the south line of West Lake. The construction land is 23,889 square meters and the construction area is controlled at 8,000 square meters. The modern architectural style is used to create a modern museum image with a novel structure and is an architectural model. Because it is in the center of the West Lake Scenic Area, the entire building is built in the form of archaeological excavation trenches and probes. Most of the buildings are placed underground. The floor area of ​​the building is controlled at XX square meters, which is divided into trenches that enter the underground part. Two major functional areas. This design concept stems from the interpretation of the block environment and the expression of the museum's own intentions. Through the architectural shape, the vertical design with non-equal internal space helps to display the needs of different content, meet different display modes, and facilitate the layout of modern display space. As the building itself, the upper structure and the modern steel structure presented inside the trench, the curtain wall glass, the granite paving, and the brick façade of the building façade are just the same as the architecture, expressing the modern humanistic atmosphere and traditional history. The deeds of culture.

What I saw was mainly the reinforcement of the beams and plates.

When the longitudinally stressed steel bars are arranged in two or more layers, the two rows of steel bars shall be padded with short steel bars with a diameter of 15 mm. If the longitudinal steel bars are larger than 25 mm in diameter, the short steel bars have the same specifications as the longitudinal steel bars.

The joints of the stirrups should be staggered and tied with the two standing ribs. The cantilevered beams are tied under the stirrups, and the rest are the same as the columns. The outer corner of the main rib of the beam should be full with the stirrups, and the rest can be tied with the plum.

The two-way plate reinforcement intersection should be fully tied. It should be noted that the negative reinforcement on the upper part should be prevented from being stepped on.

When the steel bars at the structural beam joints are very densely inserted, it should be noted that the net spacing between the main ribs of the beam top should be 30 mm to facilitate the concrete filling. Not only these, there are quite a few rules and requirements, I can only check the information myself, and I can’t finish it for a while. He also mentioned that the lap length of the lashing joint of the steel bar is not less than 10 times the diameter of the steel bar at the end of the bending of the steel bar, and the joint is preferably not at the maximum bending moment of the component.

During this period of internship, I learned a lot and hoped to learn and grow better in my future work and life. The feeling that this internship gave me is that I have been making continuous progress, and I have always found my own shortcomings and have been constantly correcting them. But time is short-lived, and as long as you keep working hard, you will make progress. This internship is a major improvement in my professional study. I will use all my abilities in future studies. I will do my best in my future work and life study!