Secretarial knowledge > Emergency plan

Hotel fire safety emergency plan


When the engineering staff found that there were fireworks in the hotel, the following points must be noted.
1, don't be impatient, keep calm
2. Notify the switchboard with the nearest call, dial the switch to zero
3. Report your name, department, and employee number
4, make it clear where the scene occurred
5, make it clear what is on fire
6, stay at the scene until the firefighters come
7. Confirm that all employees in the engineering department area and all employees have been notified by fire.
8. Obey the fire control center's control instructions on water, electricity, gas, air conditioning, ventilation, direct combustion engines, boilers and other important equipment. The employees of the engineering department have received fire-related training, using fire extinguishers to eliminate small flames; if there is no possibility of extinguishing fires, Then minimize the factors that contribute to the fire, such as closing doors, windows, flammable gas barriers, etc., and then immediately leave the scene.
Do not try to eliminate the source of fire that cannot be extinguished with a fire extinguisher. If you are not sure, limit the area of ​​fire or smoke and evacuate immediately.
Life is precious, so be sure to pay attention to your own safety.
Never use the elevator. Do not panic elevator emergency program:
1. All engineering staff should notify the on-duty engineer immediately if they notice an elevator failure.
2. Maintenance personnel in the engineering department should try to understand the floor where the elevator is located and the number of people trapped. The maintenance personnel of the engineering department immediately arrive at the floor where the elevator is located, and at the same time determine whether the elevator maintenance company should know and give help and repair services. If yes, call the elevator repair company to take emergency measures.
3. The maintenance staff of the engineering department should inform the lobby manager or the front office manager of the shift that the elevator is in an emergency. Upon receipt of the notice, the lobby manager should immediately go to the trapped floor of the elevator and confirm whether the general manager should be notified to stay nearby and communicate with the people trapped in the elevator and advise them on what action to take.
4. The maintenance personnel of the engineering department shall carry out relevant operations in accordance with the requirements of the rescue management regulations for elevators.
5. After the first-aid work is completed, the employee and the on-duty engineer should write a report stating that the emergency has been eliminated, the elevator has resumed normal operation, and the maintenance process is detailed.
note:
When it is true that a guest or other person is trapped in the elevator, do not attempt to rescue the person solely by the hotel staff. It should be carried out with the assistance of the elevator maintenance company and the person authorized to handle the matter.
Severe water leakage and gas leakage emergency measures for water supply and drainage:
1. Water leakage is generally caused by pipe rupture caused by aging of pipes, low temperature, changes in water supply system pressure, etc. In the event of a water leak, first find the water supply switch, cut off the water source, and then open the drain.
2, use all available things to prevent leakage of water into the elevator, strong electric shaft and other dangerous parts, and lift the elevator to the highest floor to prevent damage to the machine.
3. Pay special attention to the leakage of water near transformers, lighting and power control cabinets, electrical equipment, and wire troughs. If leakage cannot be avoided, turn off the electric brake to ensure employee safety and equipment safety.
4. The staff of the engineering department should immediately take action to rescue the financial losses caused by water leakage, and assist the room department to discharge the accumulated water.
5, the fire hydrant water system rupture, please immediately go to the 20-story platform water pipe well to close the fire hydrant water system for the return water main gate, use the normal fire hydrant in the water pipe near the fire hydrant to pour water in the water pipe well, try to block the damage after the pressure is reduced Pipes and gates.
6. After the water sprinkler system is broken, immediately close the water sprinkler system door of this layer and open the drain valve.
7. If the constant pressure water supply system finds or receives the fault of the domestic water pump, the fault water pump should be stopped and the standby water pump should be turned on.
The water pump frequency conversion fault should be turned off, and the pump should be manually operated by a special person to start and stop according to the pipe network pressure control.
Report the competent engineer in time to arrange the repair.
8, drainage system
1. If the sewage well is found or receives a report that the water level in the sewage well is too high, the sewage pump should be manually opened immediately.
When the sewage pump fails, the auxiliary submersible pump is used to pump water to the sewage well.
Immediately report to the competent engineer, who will arrange for the maintenance of the pump or control circuit and make a repair report afterwards.
2. Water leakage from the sewage pipe of the sewage pipe should be tightly fastened with a cloth.
Close the water device on the rupture tube pair.
The sandbags are mobilized to block the elevators and the strong electric well report supervisors, who arrange personnel to repair the pipeline cracks or replace the pipelines.
3. After informing the relevant department that the water supply and drainage system has failed, the competent engineer and supervisor should immediately estimate the repair time.
If the repair is more than 4 hours, the engineering department shall notify the affected department in writing.
Air leak:
1. In the event of a gas leak or gas fire, first notify the insurance immediately. If the leak is serious, either at the gas station or somewhere else, do not touch any switches and do not touch any electrical equipment.
2. Open the exhaust, close the gas gate, and cut off the gas source.
3. If the gas is on fire, cool it with water and prevent it from exploding. All power switches and brakes should be closed to prevent explosion.
4. If a gas fire occurs in the kitchen, close all gates and use a fire extinguisher or fireproof carpet to extinguish the fire. Please pay attention to the fire-fighting materials and then use water to extinguish the fire.
Emergency plan for gas leakage from boilers and direct combustion engines
1. The employees of the engineering department should be vigilant when they patrol. Care should be taken when handling unusual gas odors. The position and switching method of the total gas enthalpy should be well mastered.
2. When the gas of boiler or direct combustion engine leaks, when the gas concentration does not exceed 20% of the lower explosion limit, the valve and non-fire power supply on the gas main pipe should be alarmed and cut off in time, and the accident exhaust system should be started.
3. When the boiler and direct combustion engine flames are extinguished, the correct shutdown and shutdown procedures should be performed.
4. Anyone who discovers a gas leak accident immediately informs the Security Center and the Engineering Department.
5. After receiving the gas leak information, the engineering department immediately notified the nearest employees to go to the scene to maintain order, and immediately notified the relevant competent departments and engineering personnel to carry tools and equipment to the scene.
6. Management and operation personnel should stick to their respective positions and must not leave their posts without authorization; and organize the unrelated personnel to quickly evacuate the dangerous areas.
7. The manager of the engineering department immediately arrived at the site to act as the on-site commander, and dispatched personnel from various departments in a unified schedule.
8. After arriving at the scene, be cautious, do not turn on the lights and turn on the fan and any electric power. All window doors must be opened to shut off gas or petroleum gas, and smoking on site is strictly prohibited.
9. Security personnel maintain good order at the scene and assist engineers in emergency rescue.
10. The engineering department personnel assist the security personnel to evacuate the site, explain the comfort to other employees and customers, and tell other departments that the employees and customers will be eliminated immediately.
11. Quickly check the gas leak and take corrective measures to eliminate the leak.
12. When the accident is discharged, the equipment should be accurately restored and started according to the operating procedures. When restarting, the furnace should be thoroughly purged until it is put into normal operation.
13. After the site is restored to its original condition, the equipment personnel quickly identify the cause and organize the repair according to the actual situation on the site. The repair process should minimize the impact on customers and business.
14. After the fault is eliminated, each department will restore the original status on the spot, and report the fault to the general manager.
15. If you find any discomfort, you should handle it carefully and wait for the ambulance personnel and police officers to arrive at the scene.
16. After the accident is eliminated, the project director shall report the accident report to the hotel in writing within 2 working days. The accident report shall state the time, place, accident time, cause of the accident, and prevention of accidents in the accident report. Measures.

1 2

recommended article

popular articles