Secretarial knowledge > Emergency plan

Typhoon storm surge emergency work plan


In order to prepare for the anti-tropic cyclone and storm surge, a quay anti-tropical cyclone and storm surge exercise was arranged for the typhoon storm surge emergency plan.
1 Definition: Tropical cyclone - refers to typhoon, tornado.
2. The purpose is to firmly establish the consciousness of "preventing against, not coming, not prepared", unifying understanding, clarifying the significance of the typhoon storm surge and the work focus of the typhoon storm surge organizations at all terminals, and implementing the organization and posts. Implementation, material preparation and implementation. Familiar with the emergency start-up program, work in an orderly and orderly manner. Ensure early preparation, early inspection, early arrangement, early implementation, and minimize disaster losses. All terminals are required to correctly handle the relationship between safety and production, actively publicize and implement the spirit of the anti-Taiwan storm surge meeting, adhere to the prevention, prevention and resistance, and actively carry out work, and actively carry out anti-typhoon around the various terminals in the center. The storm surge plan drills, standing unrestrained, prevent problems before they happen, so that the dock management center's defense work is "reasonable and win-win", and fully protect the lives of employees and corporate property.
Typhoon storm surge emergency plan
1. Leader of the Emergency Planning Leading Group Organization: Zhang Yingjun, deputy leader: Qi Xueqing members: security group, business group, comprehensive group, dispatcher, security officer, all personnel on duty.
2. Organizational responsibilities
a. Team leader: After receiving the emergency information, understand the situation of emergency development, issue an emergency order, issue a cancellation order, and report the emergency situation.
b. Deputy leader: Perform the duties of the team leader when the team leader is not on site.
c. Dispatch, security officer: Perform the duties of the team leader when the team leader and deputy team leader are not on site.
d. Communication Group: Responsible for the up and down liaison and external assistance and vehicle equipping.
e. Disaster control group: responsible for fixing the equipment, closing the doors and windows, and cutting off the power supply, which is the responsibility of the safety officer.
f. Material supply group: responsible for material supply, such as temporary use of drugs, dressing straps, stretchers, straw bags, shovel, sacks, etc.; responsible for the rescue of personnel injuries, the destruction of fire extinguishers, the burial of fire sand, the shipment of sacks, etc. The squad leader is responsible.
Typhoon storm surge emergency plan
1, typhoon, storm surge alarm
1.1 The terminal received a typhoon and storm surge alarm.
1.2 The duty officer is ready to record. Also report to the terminal management center.
2. The first stage.
2.1 The Terminal Management Center informs all staff at the terminal of typhoon and storm surge warnings.
2.2 When a tropical cyclone threatens to be safe in the terminal management center, the special ship management center and the office area of ​​the business department within 48 hours, the emergency organization shall immediately convene a base anti-tropical cyclone meeting to implement the base anti-tropic cyclone emergency plan. The relevant management departments of the Shipbuilding Department and the leaders of the terminal management center will hold typhoon, storm surge and emergency meetings. The meeting should discuss:
a. Dock protection measures and plans;
b. Implement anti-typhoon and storm surge materials reserves;
3. Schedule and deploy the following work:
3.1 The staff on duty at the terminal shall monitor the weather forecast of the sea area at any time, and notify the terminal management center of the weather changes to keep the communication open and prepare for the evacuation of the transport personnel.
3.2 Strengthen communication with the Emergency Command Center of the Shipbuilding Department Fan Wenwang provides you with a large number of free essays! At least once every 6 hours with the Office of the Emergency Command Center of the Business Department;
3.3 The terminal emergency team organizes emergency preparedness according to its duties;
3.4 Check communication equipment, flashlights and terminal electrical equipment;
3.5 Organize and reinforce loose equipment and equipment on the dock. Move some small equipment and equipment on the dock into a safe area as far as possible;
3.6 Fix the movable objects at the dock to ensure that they are not loosened under the tropical cyclone attack and are reliable and reliable.
3.7 To inform the business department and the terminal center.
4. The second stage of the typhoon and storm surge.
4.1 Checking the normal duty status
4.2 Check the water condition of the dock.
4.3 Maintain communication links and report to the Office of the Emergency Command Center of the Business Unit at least once every three hours.
5. The third stage of typhoon and storm surge prevention.
5.1 Dock Management Center organizes all employees regardless of shifts, strictly observes discipline, obeys the command of the team leader, strengthens the inspection around the dock, checks the equipment and materials on the dock, and ensures the completion of all materials and equipment fastening. Carry out repairs or rescues and report emergency agencies.
5.2 Check the terminal electrical equipment and turn off the shore power if necessary.
5.3 Check to close all the doors and windows of the duty room.
5.4 Keep all emergency lights and communication normal.
5.5 All power machinery, check the wedge of the duty room and so on.
5.6 This stage is the key stage of the typhoon and storm surge prevention. The materials that arrive at the terminal before the typhoon and storm surge octopus must be completed during the day. During this period, it is required to report to the emergency command center office of the business department once every hour. Happening.
5.7 All personnel at the terminal will gather at the emergency meeting point and listen to the superior order to be ready to evacuate.
5.8 When the contact is interrupted, the meteorological situation in the area where the terminal is located deteriorates rapidly, and the value shuttle is required to be in place. All the personnel at the terminal gather at the emergency meeting point. The terminal emergency leading group has the right to make the decision to evacuate the personnel according to their own situation according to their own circumstances. If the wharf center leader cannot rush to the site, the terminal site dispatcher and security officer perform the duties of the terminal center director.
6. When the typhoon and storm surge center pass through the area where the dock is located, or the typhoon and storm surge alarms are lifted, the dock enters the fourth stage of typhoon and storm surge.
6.1 After the alarm is removed, personnel should return to the dock site promptly and should be carefully inspected.
6.2 Fixation and damage of various equipment and equipment;
6.3 duty room and its base;
6.4 equipment and cables;
6.5 Damage to the terminal infrastructure:
6.6 Damage to the terminal;
6.7 Damage to the communication equipment;
6.8 The terminal shall report the inspection situation and the requirements for logistics support to the duty room of the business department to facilitate the return to normal operations. At the same time, the anti-tropical cyclone measures shall be summarized and reported to the business department. The business department shall summarize the situation and report it to the emergency command center office of the company.

recommended article

popular articles