Company high temperature heatstroke emergency plan
1. Purpose:
In order to prevent the company from having a heatstroke in a high-temperature climate, ensure that the company's production goes smoothly, and ensure that employees have emergencies such as heat stroke, they can quickly and effectively start emergency rescue work to maximize the protection of employees' physical and life safety. This plan.
2. Responsibilities and scope of application:
The company's safety management committee implements the responsible department for the plan. This plan applies to all departments of the company. The key prevention units are: shaping process, compound process, inspection section, warehouse, boiler room, equipment power department, canteen and so on.
3. Emergency plan starts:
Based on the highest temperature on the day published in the "**** Newspaper", the emergency plan is automatically started when the highest temperature for three consecutive days is above 37 °C or the maximum temperature of the day reaches 38 °C. All departments of the company implement various work measures according to the emergency plan.
4. Emergency plan implementation
The power department of the equipment should strengthen the management of water and electricity supply in the summer to ensure the electricity and water used in the workshop.
need. In case of special circumstances, power outages and water cuts should be notified to relevant departments in advance, and corresponding prevention plans should be formulated according to specific conditions.
Extensively publicize the knowledge of prevention and treatment of heatstroke, so that employees can master the basic knowledge of heatstroke prevention and cooling; workshop management cadres should strengthen the inspection of the production situation of the workshop every day, timely understand the high temperature environment of the workshop and the physical condition of the workers, deal with the problems in time, and eliminate the accidents. In the bud.
The equipment power department is responsible for pre-purchasing a batch of cooling drugs, and distributing the drugs to each position of each process as required. The company has set up herbal tea barrels in each drinking water area to ensure that there is a supply of herbal tea every day.
Cooling fans are equipped in key workshops and key high-temperature posts in the workshop. Arrange for a 20-minute break in the cool and ventilated place at 10:30 am and 2:30 pm every day.
The company canteen supplies the first line of ice water to the workshop every day, the time is in the morning every morning.
10:30 and 2 o'clock in the afternoon. Two barrels of seaweed egg soup are provided to employees free of charge every day at noon. The company office is responsible for implementation.
The company's fleet should ensure that a small car is reserved and equipped with drivers to deal with emergencies.
Processing needs. Specifically responsible for the company office.
Heatstroke rescue method:
Mild patients: When the company's employees have dizziness, fatigue, and dazzling during normal operation, they should stop working immediately to prevent secondary accidents. Other surrounding employees should arrange symptomatic personnel to rest in a cool, well-ventilated area. Its cold water, medicines, wet towels, etc. And inform the workshop or department leaders.
Severe patients: When the company employees have heatstroke, the surrounding personnel should immediately notify the workshop or department leaders, and promptly transfer the accident personnel to the cool and ventilated area to observe the symptoms so that the medical personnel can temporarily grasp the first-hand treatment information. The company's office immediately organized rescue workers to transfer the heatstroke patients to the nearest hospital for observation and treatment. And reported to the company.
recommended article
- Flood control and emergency prevention and rescue plan
- Emergency plan for the 2019 earthquake
- Emergency plan for handling mass incidents
- Secondary school emergency evacuation drill plan
- Emergency plan for electrical fire accidents in power supply stations
- School emergency evacuation drill plan
- Emergency plan for construction safety accidents
- 2019 exam for safety test
- Travel agency security accident emergency plan
- Enterprise flood prevention emergency plan
- Emergency plan for sudden problems at the entrance of the National Primary School
- Middle school stairs entry and exit evacuation plan
popular articles
- Kindergarten fire emergency plan
- Tao Xingzhi's famous sayings
- Strong words
- National Small Security Evacuation Program
- Teacher's famous saying
- Taizai’s famous sayings
- College entrance examination inspirational quotes
- a good saying that loves labor
- English famous words
- Street Community Flood Control Emergency Plan in 2019
- Du Yuexi's famous sayings
- Kindergarten fire safety emergency evacuation drill plan
- I want to say something to the teacher.
- The latest high school inspirational maxim
- Deaf people jingle 2019
- Injured sentence
- National Small Prevention Flood Prevention Emergency Plan
- Korean swear words
- Emergency plan for small infectious diseases in experimental countries
- Thanks to the friend's words 2019
- 2014 is very touching words
- Radiation accident emergency treatment plan
- Qq space mood phrase
- Kindergarten earthquake emergency plan
- Fire emergency plan
- Sad love sentence 2019
- School flood prevention emergency plan
- Classical life motto
- Bing Xin’s famous words
- Describe the fast time sentence 2019